| Administrative law - 1977 - 1240 pages
...at all times and places Including the period of manufacture, and In any event prior to acceptance. (b) In case any supplies or lots of supplies are defective...have been rejected or required to be corrected shall b» removed, or, If permitted or required by the Contracting Officer, corrected In place by and at... | |
| Administrative law - 1984 - 720 pages
...supplies are defective in material or workmanship or Chapter 1 — Federal Procurement Regulations otherwise not In conformity with the requirements...by the Contracting Officer, corrected in place by and at the expense of the Contractor promptly after notice, and shall not thereafter be tendered for... | |
| Administrative law - 1972 - 684 pages
...supplies are defective in material or workmanship or otherwise not in conformity with STANDARD FORM 32 the requirements of this contract, the Government...by the Contracting Officer, corrected in place by and at the expense of the Contractor promptly after notice, and shall not thereafter be tendered for... | |
| Administrative law - 1970 - 984 pages
...section shall be included in contracts utilizing the clause in § 7.109-4 except that paragraph (b) shall be deleted and the following substituted: (b)...disposition) or to require their correction. Supplies or lota of supplies which have been rejected or required to be corrected shall be removed or. If permitted... | |
| Administrative law - 1969 - 752 pages
...section shall be included in contracts utilizing the clause in § 7.109-4 except that paragraph (b) shall be deleted and the following substituted: (b)...instructions as to their disposition) or to require their cor7.103-6 ïectlon. Suppliée or lots of supplies which have heen rejected or required to be corrected... | |
| Administrative law - 1978 - 944 pages
...at all times and places including the period of manufacture, and in any event prior to acceptance. (b) In case any supplies or lots of supplies are defective...disposition) or to require their correction. Supplies cr lots cf supplies which have been rejected or required to be corrected shall be removed or, if permitted... | |
| Administrative law - 1970 - 670 pages
...at all times and places including the period of manufacture, and In any event prior to acceptance. (b) In case any supplies or lots of supplies are defective...instructions as to their disposition) or to require their correctlon. Supplies or lots of supplies which have been rejected or required to be corrected shall... | |
| Administrative law - 1971 - 664 pages
...at all times and places including the period of manufacture, and In any event prior to acceptance. (b) In case any supplies or lots of supplies are defective...instructions as to their disposition) or to require their corTitle 41 — Public Contracts, Property Management rectlon. Supplies or lots of supplies which have... | |
| Administrative law - 1968 - 1348 pages
...tbe period of manufacture, and in any event prior to acceptance. STANDARD FORM 32 mranHow C*ntrsct> (b) In case any supplies or lots of supplies are defective...Instructions as to their disposition) or to require their correctlun. Supplies or lots of supplies which have been rejected or required to be corrected shall... | |
| Administrative law - 1955 - 1316 pages
...at all tunes and places including the period- of manufacture; and In any event prior to acceptance. (b) In case any supplies or lots of supplies are defective...instructions as to their disposition) or to require then- correction. Supplies or lots of supplies which have been rejected or required to be corrected... | |
| |