| Louis P Miramontes, L Rice Hugh - Business & Economics - 2004 - 1408 pages
...reasonable time after they have been authorized. DIFFERING SITE CONDITIONS If Contractor encounters subsurface or latent physical conditions at the site, differing materially from those indicated in the contract documents, or physical conditions at the site of an unusual nature, differing materially... | |
| Levent Ozdemir - Technology & Engineering - 2004 - 636 pages
...treatment plant for later disposal into Lake Michigan. The differing site conditions clause provided: "A. The Contractor shall promptly, and before such conditions are disturbed, notify the Owner by written notice of: Subsurface or latent physical conditions at the site differing materially... | |
| Michael T. Callahan - Law - 2005 - 628 pages
...losses resulting from unforeseen conditions."). contract documents for a bidder reasonably not to expect subsurface or latent physical conditions at the site...materially from those indicated in this contract. 35 Two cases from the US Court of Federal Claims demonstrate some of the difficulties presented by... | |
| Wilfred Abraham, Maria Isabel De Almeida Alvarenga - Law - 2005 - 442 pages
...conditions at the site which differ materially from those indicated in this contract ["Type I Conditions"]; or (2) unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work... | |
| Thomas J. Kelleher, Jr., Smith, Currie & Hancock - Law - 2005 - 627 pages
...necessarily a part of the contract. The clause entitles the contractor to reimbursement when there are "conditions at the site differing materially from those indicated in this contract." Even though the logs may not be included in the contract, they are "indicated" in the contract. . .... | |
| Bhawani Singh, R K Goel - Science - 2006 - 509 pages
...tender/contract documents, of tunnelling contracts globally if they have not been considered by the owner. "(a) The Contractor shall promptly, and before such conditions are disturbed, notify the engineer-in-charge in writing of: (i) subsurface or latent physical conditions at the site differing... | |
| Administrative law - 1966 - 292 pages
...conditions in construction contracts. (a) Contract provisions. Clause 4 of Standard Form 23A provides that the contractor shall promptly, and before such conditions...site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| Administrative law - 1972 - 540 pages
...4—18.5104 Differing site conditions. (a) Contract provisions. Clause 4 of Standard Form 23A provides that the contractor shall promptly, and before such conditions...site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| Administrative law - 1965 - 268 pages
...conditions in construction contracts. (a) Contract provisions. Clause 4 of Standard Form 23A provides that the contractor shall promptly, and before such conditions...site differing materially from those indicated in the contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially... | |
| |