... navigable streams and tributaries thereof when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $25,000 shall be allotted for this purpose for any single tributary from... United States Code - Page 142by United States - 2000Full view - About this book
| Flood control - 1979 - 56 pages
...amended). Provides for construction of small flood control projects not specifically authorized by Congress when, in the opinion of the Chief of Engineers, such work is advisable. The Federal share in such projects may not exceed $2,000,000, ($3,000,000 in some cases) and must constitute... | |
| United States. Great Lakes Basin Commission - Administrative agencies - 1975 - 148 pages
...year for the construction of small river and harbor improvement projects not specifically authorized, when in the opinion of the Chief of Engineers such work is advisable and if the benefits are in excess of the cost. Not more than $500,000 shall be spent at any single... | |
| Water resources development - 19?? - 40 pages
...removal of accumulated snags and other debris, and for the clearing and straightening of stream channels when, in the opinion of the chief of engineers, such work is advisable in the interest of flood control. Removal of Wrecks and Obstructions (Public Law 55-189). Under this... | |
| Hydraulic engineering - 144 pages
...removal of accumulated snags and other debris, and for the clearing and straightening of stream channels when, in the opinion of the Chief of Engineers, such work is advisable in the interest of flood control. • Flood Fighting, Repair, and Rescue Work (Public Law 84-99). This... | |
| Administrative law - 1976 - 976 pages
...Congress, which come within the provisions of Section 1 of the Flood Control Act of June 22, 1936, when in the opinion of the Chief of Engineers such...work is advisable. The amount allotted for a project snail be sufficient to complete Federal participation in the project. Not more than $1,000,000 shall... | |
| Flood control - 1977 - 260 pages
...prevent flood damages to highways, bridge approaches, and other public works endangered by bank erosion when, in the opinion of the Chief of Engineers, such work is advisable. Emergency bank protection work to protect municipal water-supply facilities of the city of Boone, which... | |
| Water resources development - 132 pages
...provides for construction of small flood control projects without specific authorization by Congress, when in the opinion of the Chief of Engineers such work is advisable. The project must constitute a complete solution to the flood problem involved, and not commit the United... | |
| Flood control - 302 pages
...amended provides for construction of small flood control projects not specifically authorized by Congress when in the opinion of the Chief of Engineers such work is advisable. The federal share in such projects may not exceed $2,000,000, except that where the area to be protected... | |
| Flood control - 1979 - 212 pages
...amended). Provides for construction of small flood control projects not specifically authorized by Congress when, in the opinion of the Chief of Engineers, such work is advisable. The Federal share in such projects may not exceed $2,000,000, ($3,000,000 in some cases) and must constitute... | |
| Flood control - 94 pages
...construct certain small river and harbor improvement projects not specifically authorized by Congress when, in the opinion of the Chief of Engineers, such work is advisable. Small navigation projects are based upon favorable preliminary investigations and subsequent detailed... | |
| |