Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 6-10 of 84
Page
... methods of presentation and analysis , are normally promulgated through the medium of the Design Supplements as outlined in this chapter . A. Designs and specifications for equipment shall be prepared so as to permit maximum competition ...
... methods of presentation and analysis , are normally promulgated through the medium of the Design Supplements as outlined in this chapter . A. Designs and specifications for equipment shall be prepared so as to permit maximum competition ...
Page
... Methods . Administrative policies and procedures encountered in connection with the design of power systems are covered in Chapter 2.6 , Power System Analysis and Design of this Volume . .11 Design Supplement No. 5 , Field Installation ...
... Methods . Administrative policies and procedures encountered in connection with the design of power systems are covered in Chapter 2.6 , Power System Analysis and Design of this Volume . .11 Design Supplement No. 5 , Field Installation ...
Page
... Methods Specified Arrangements for Making Tests Notification of Machinery Contractor Where pumping plants are used for irrigation or drainage of farm land , the Regional Director shall furnish information regarding the required monthly ...
... Methods Specified Arrangements for Making Tests Notification of Machinery Contractor Where pumping plants are used for irrigation or drainage of farm land , the Regional Director shall furnish information regarding the required monthly ...
Page
... methods of operation . Examples of the factors are presence of ground water , flooding , and extreme cold . ( d ) Depth of overburden : Include description and classification of the material and feasible methods of removal and disposal ...
... methods of operation . Examples of the factors are presence of ground water , flooding , and extreme cold . ( d ) Depth of overburden : Include description and classification of the material and feasible methods of removal and disposal ...
Page
... Method of operation for flood control and maximum permissible releases . M. Reservoir data should contain information concerning suspended sediment and bed loads of streams entering reservoir . N. Discussion of fetch and freeboard ...
... Method of operation for flood control and maximum permissible releases . M. Reservoir data should contain information concerning suspended sediment and bed loads of streams entering reservoir . N. Discussion of fetch and freeboard ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design