Page images
PDF
EPUB

PART 2-9/PATENTS, DATA AND

COPYRIGHTS Subpart 2–9.50—Retention of Patent

and Royalty Rights Sec. 2-9.5000 Scope of subpart. 2-9.5001 Policy.

AUTHORITY: $ 2-9.5000 and $ 2-9.5001 issued under secs. 303, 313, 72 Stat. 747, 752; 49 U.S.C. 1344, 1354.

posal to his own engineering sources for review and recommendation.

(2) Wage rates and trends. Contractors should be required to provide current wage rates by type of direct labor included in the proposal. If the wage rates used exceed current rates, contractors should be required to show the basis for the change in trend.

(3) Burden rates. Contractors should be required to show the basis used in establishing whatever burden rates are included; such basis should relate to recent past experience and the reliability of projections should be supported.

(4) Material. Contractors should provide a listing, including prices and sources, of raw stock, purchase parts, and subcontracted items. The method, if any, for handling of spoilage and scrap should be explained. Where material costs are a significant part of the contract price, review and recommendations by Agency engineering personnel should be obtained.

§ 2-9.5000 Scope of subpart.

This Subpart codifies, in FAPR, Federal Aviation Agency Order 56, which sets forth the Agency policy with respect to the retention of rights and recovery of costs in connection with negotiated contracts where research or opment is a significant part of the work. (25 F.R. 14031, Dec. 31, 1960, as amended at 26 F.R. 9675, Oct. 13, 1961) § 2-9.5001 Policy.

In negotiating contracts under which the Government pays a part of all of the costs of research or development, it is the policy of the Federal Aviation Agency to retain, for the benefit of the United States, rights to data and patent rights, in reasonable proportion to the contributions of the Agency and the contractor; and to recover the Federal Aviation Agency's contribution toward such research and development through royalties to the Government upon commercial exploitation of the products developed thereby. [ 25 F.R. 14031, Dec. 31, 1960]

PART 2-12-LABOR

(5) Tooling and test equipment. Proposals for production contracts should list and price any items of tooling and

ecial test equipment required for performance. Negotiation should be directed toward having the contractor capitalize the cost of these items. Where this is impracticable, the reliability of the pricing should be examined, the disposition of any items paid for or furnished by the Government should be determined, and proper controls should be established. (6) Pre-production costs.

In proposed contracts for $100,000 or other involving “first-run” or “pre-production" quantities, separate breakdowns should be provided by the contractor of the start up or pre-production costs, and of the production costs.

(7) General and administrative costs. Contractors will indicate the basis on which general and administrative costs are calculated and distributed. Such presentation should indicate whether such costs are related to the value of direct labor, cost of sales or other.

(8) Other costs. Proposals should clearly establish the basis and necessity, if any, for special costs such as travel, sales commissions, royalties, or manufacturer's excise tax.

Subpart 2-12.4-Labor Standards in Construction

Contracts Sec. 2-12.450 Scope of subpart. 2-12.451 Statutory requirements. 2-12.451-1 Davis-Bacon Act (Act of March

3, 1931, as amended, 40 U.S.C.

276a). 2-12.451-2 Copeland Act (Act of June 13,

1934, as amended, 18 U.S.C.

874; 40 U.S.C. 276c). 2-12.451-3 Eight-hour law (Act of June 19,

1912, as amended, 40 U.S.C.

321-326). 2-12.451-4 Department of Labor regula

tions. 2-12.452 Applicability. 2-12.452-1 Noncoverage (Davis-Bacon and

Copeland Acts).

Sec.

(e) Withholding from contractors of 2–12.452-2 Noncoverage (eight-hour law). amounts considered necessary to pay 2-12.453 Penalties (Davis-Bacon and

laborers or mechanics any discrepancies Copeland Acts, and eight-hour

between the amounts received and the law).

amounts due (SF-1093); and 2-12.454 Contract clauses. 2-12.454-1 Clauses for general use.

(f) Termination of work for failure 2-12.454-2 Contracts for $2,000 or less.

to pay required minimum wages. 2-12.454-3 Contracts with a State or politi

§ 2–12.451-2 Copeland Act (Act of cal subdivision.

June 13, 1934, as amended, 18 U.S.C. 2-12.455 Administration and enforce

874; 40 U.S.C. 276c). ment. 2-12.455-1 Scope.

The Copeland (Anti-Kickback) Act 2-12.455-2 Responsibilities.

makes it illegal for anyone to make un2-12.455–3 Delegation of authority by con- authorized deductions, or to exact retracting officer.

bates from, the wages of any person Subpart 2-12.6—Walsh-Healey Public Contracts employed in a construction project that Act

is financed in whole or in part by loans 2–12.602–2 Department of Labor regulations

or grants from the United States. Furand interpretations.

ther, it requires the Secretary of Labor 2-12.650 Delegation of responsibility. to make reasonable regulations for con

tractors and subcontractors engaged in AUTHORITY: $ $ 2–12.450 through 2–12.650 issued under secs. 303, 313, 72 Stat. 747, 752;

such work, including provisions that U.S.C. 1344, 1354.

each such contractor shall furnish a

weekly statement with respect to the SOURCE: $ $ 2–12.450 to 2–12.650 appear at

wages paid each employee during the 26 F.R. 11904, Dec. 13, 1961.

preceding week. Subpart 2-12.4Labor Standards in

§ 2–12.451-3 Eight-hour law (Act of Construction Contracts

June 19, 1912, as amended, 40 U.S.C.

321-326). § 2-12.450 Scope of subpart.

The Eight-hour law provides that all This subpart deals with the labor,

contracts to which the United States is standards for construction contracts as

a party, except supply contracts covered prescribed by the statutes and regula

by the Walsh-Healey Public Contracts tions set forth in this section, and de

Act and other exclusions set forth in fines the authority and responsibilities of

§ 2-12.452-2, shall contain a provision the contracting officer and his representative in the area of labor standards;

making it illegal for the contractor or

subcontractor to employ laborers or meand provides instructions for assuring

chanics, on the work contemplated by labor standards compliance, routine

the contract, more than 8 hours in one enforcement activities, special investi

day unless all hours in excess of this gations, and for reporting violations.

limit be compensated at least one and § 2-12.451 Statutory requirements. one-half times the basic rate of pay. § 2-12.451-1 Davis-Bacon Act (Act of § 2-12.451–4 Department of Labor reg

March 3, 1931, as amended, 40 ulations.
U.S.C. 276a).

Pursuant to the foregoing statutes All construction contracts in excess of and also the Reorganization Plan No. 14 $2,000, executed by FAA, under which of 1950 (15 F.R. 3176), the Secretary of laborers or mechanics are employed di- Labor has issued two sets of regulations rectly upon the site of the work, are relating to the administration and ensubject to the Davis-Bacon Act which forcement of these statutes: (1) Regulaprovides for:

tions, Part 3, Title 29, Subtitle A, Code (a) Payment of laborers or mechanics of Federal Regulations (Copeland Act); not less often than once a week;

and (2) Regulations, Part 5, Title 29, (b) Payment of wages in accordance Subtitle A, Code of Federal Regulations with the prevailing minimum wage rates (Davis-Bacon Act). These regulations prescribed by the Secretary of Labor; are contained in the FAA Labor Stand

(c) Payment of wages without deduc- ards Handbook. tions except as authorized by law; (d) Posting of wage rates and Form

§ 2-12.452 Applicability. SOL-155 at the job site in a prominent The requirements set forth in § 2place during construction;

12.451 are applicable to construction

[ocr errors][ocr errors]

contracts. Construction contracts include work that involves the construction, alteration or repair, including painting and decorating of public buildings or public works. The statutes and regulations are applicable irrespective of whether the contract was entered into as a result of formal advertising or negotiation, or whether it is a fixed-price or cost-reimbursement type contract. The requirements under the DavisBacon Act apply only to work performed in the United States, while the EightHour laws and the Copeland Act apply not only to such work but also to work in other areas over which the United States has direct legislative control. § 2-12.452-1 Noncoverage (D a vi s.

Bacon and Copeland Acts). (a) The requirements set forth in § 212.451 in respect to the Davis-Bacon and Copeland Acts do not apply to the following:

(1) Contracts for furnishing supplies and equipment, including installation, where the installation requires only an incidental amount of work (as defined in (b) below) that would otherwise be considered construction, alteration and/or repair of a public building or work.

(2) Contracts for servicing or maintenance work in an existing plant, including installation or movement of machinery or other equipment, and plant rearrangement which involve only an incidental amount of work (as defined in (b) below) that would otherwise be considered construction, alteration and/ or repair.

(3) Contracts for demolition, except where indispensable and preliminary to schedule new construction.

(4) Contracts with a state or political subdivision thereof (although the requirements do apply, and the contract must so provide, to a subcontract thereunder with a private person or firm which involves the construction, alteration and/or repair of public buildings or public works).

(b) As used in (a) (1) and (a) (2) above, “an incidental amount of work” is defined as work directly related to the installation, movement or rearrangement of equipment or machinery, relatively small in amount, and which does not include changes in a facility affecting its architectural or structural strength, stability, safety, size, or function as a public work.

§ 2-12.452–2 Noncoverage (eight-hour

law). The requirements set forth in $ 2– 12.451 in respect to the eight-hour law do not apply to the following:

(a) Contracts with a state or political subdivision thereof (although the requirement does apply, and the contract must so provide, to a subcontract there.. under with a private person or firm);

(b) Contracts (or portions thereof) for materials or articles usually bought in the open market, other than armor or armor plate, or for supplies in connection with which any required services are merely incidental to the sale and do not require substantial employment of laborers or mechanics;

(c) Contracts to which the provisions of the Walsh-Healey Public Contracts Act are clearly applicable for the complete performance of the contract;

(d) Contracts for transportation by land or water; and

(e) Contracts for transmission of intelligence. § 2-12.453 Penalties (Davis-Bacon and

Copeland Acts, and eight-hour law). (a) Violations under the Davis-Bacon Act are punishable in the following ways:

(1) Termination of the contractor's right to proceed with the work or such part of the work where there has been a failure to pay the required wages, with the contractor and his sureties being liable to the Government for any excess completion costs occasioned the Government thereby.

(2) Withholding of funds for direct payment of required wages to underpaid employees by the Comptroller General. (See GAO Policy & Procedures Manual, 4 G.A.O. 4500 and 7 G.A.O. 3530. The procedures set forth in the GAO Manual supersede the Comptroller General's letter A-34106 of February 28, 1936, cited in Department of Labor regulations.)

(3) Ineligibility for Government contracts for 3 years. (For reporting procedures see GAO Policy and Procedures Manual, 4 G.A.O. 4500 and 7 G.A.O. 3530.)

(4) Suits against the contractor by employees to recover unpaid portion of wages due them where insufficient funds have been withheld to pay required wages. (See Section 3, Davis-Bacon Act, 40 U.S.C. 276a.)

(b) Violations under the Copeland Act are punishable in the following ways:

[ocr errors]

(1) The weekly compliance statement is subject to Section 1001 of Title 18 of the United States Code (Criminal Code and Criminal Procedure) which provides, among other things, that any false, fictitious or fraudulent statement is subject to a $10,000 fine or five years imprisonment, or both.

(2) Anyone who unlawfully exacts rebates is subject to a $5,000 fine or five years imprisonment, or both.

(c) Violations under the eight-hour law are punishable in the following ways:

(1) Government officials, contractors, or subcontractors that employ, direct, or control any laborer or mechanic in connection with dredging or rock excavation in any river or harbor in the United States are subject to a $1,000 fine or six months imprisonment, or both.

(2) For each violation in every applicable contract, a penalty of $5 is imposed for each laborer or mechanic for each day in which he shall be required or permitted to work more than eight hours without overtime pay. § 2-12.454 Contract clauses.

§ 2-12.454-1 Clauses for general use.

Except as provided in § 2-12.454-3 every construction contract in excess of $2,000 within the United States shall include the Labor Standards provisions appearing in Standard Form 19A. (See § 1-16.901-19A.)

$ 2–12.455-1 Scope.

The following subsections list the specific details of procedures and responsibilities of the contracting officer in regard to the statutes and regulations summarized in § 2-12.451. $ 2–12.455–2 Responsibilities.

(a) The responsibilities of the contracting officer in the discharge of duties relative to labor standards are the following:

(1) Secure wage determinations from the Secretary of Labor and include them in the appropriate contract documents whenever work subject to the coverage of the Davis-Bacon Act is to be performed. The substitution of a blanket provision, in specifications, that contractors shall pay minimum wage rates, regardless of whether the wage rate determination is received before or after award, is not permitted.

(i) Requests for wage determinations should be made on Form DB-11, directly to the Secretary of Labor at least 30 days before advertisement of specifications or the beginning of negotiations for the contract for which the determination is sought.

(ii) In urgent cases, the Department of Labor will act immediately to compile a determination on a telephonic or telegraphic request. Such a request should be followed with a confirmation on Form DB-11. The use of this privilege should be kept to a minimum.

(iii) If a construction program in a given area requires that several contracts be awarded within a 90-day period, a blanket wage determination may be secured to cover all contracts. Such an exception, however, requires the approval of the Solicitor of Labor and must be adequately justified. (See § 2-12.455-2(a) (8) (iv).)

(iv) In general, the Davis-Bacon Act rates applicable to a contract at the time it is awarded continue in effect during its term regardless of whether it is a fixed-price or cost-type contract. Any substantial addition to properly awarded contract, made more than 90 days from the date of the determination being used, requires a new determination for such additional work. If the wage determination expires before award of a contract, a current determination shall be secured.

(v) In the event any class of laborers or mechanics are employed which are

§ 2-12.454-2 Contracts for $2,000 or

less. Except as provided in § 2-12.454–3, every construction contract for $2,000 or less within the United States shall include the Labor Standards Provisions appearing as clause 10 on page 2 of Standard Form 19. (See § 1-16.901-19.) § 2-12.454–3 Contracts with a State or

political subdivision. In the case of contracts with a State, or political subdivision thereof, which involves construction, the contract clauses required by Standard Form 19, or Standard Form 19A, as applicable, shall be inserted therein, and such clauses shall be prefaced by the following provision: “The contractor agrees to insert the following in all subcontracts hereunder with private persons or firms”. § 2-12.455 Administration and enforce.

ment.

a

[ocr errors][ocr errors]

not listed in the wage determination, the contracting officer, contractor, and employee (or union as the case may be) shall agree on the classification or reclassification. The report of the administrative action taken, or notice of dispute with recommendation, shall be submitted directly to the Secretary of Labor. (29 CFR 5.6(c).)

(2) Provide to the contractor posters (SOL-155) with appropriate information inserted together with copies of the wage determinations.

(3) Obtain from the contractor certification of compliance or of the existence of an honest dispute. (29 CFR 5.6(a).)

(4) Obtain and examine payrolls and preserve them 3 years from date of completion of contract. (29 CFR 5.6(d).) Form SOL-184 and the continuation sheet SOL-185, available to the contractor at the Government Printing Office, are recommended for use. In checking the payroll reports, the contracting officer should :

(i) Look for violation of the Copeland Act, bearing in mind that payroll deductions may be made only in accordance with $ 3.5 of regulations of Secretary of Labor, Part 3. (29 CFR 3.5.)

(ii) Determine if any employee who worked more than 8 hours in any one day was duly compensated for such work in accordance with the eight-hour law.

(iii) Determine the correctness of job classifications and payment according to the Secretary of Labor's determinations. A review of the job classifications, with knowledge of the construction involved, may reveal misassignment of employees or incorrect payment.

(iv) Determine whether apprentices are duly registered and whether the number employed is disproportionate to the journeymen. According to the Solicitor of Labor's letter of May 23, 1956, “The duties of the contracting officer do not extend beyond the establishment of bona fide registration. In other words, the contracting officer has no responsibility to determine whether or not the apprentice is receiving the training called for by the program under which he is registered.” (See also 29 CFR 5.6(e).)

(5) Make investigations for compliance with labor standards, stipulations and applicable laws. On-the-job investigations, including observation of the work and employee interviews, shall be made as necessary to insure compliance. Full-scale investigations shall be made

on a selective basis, or when the Agency is put on notice of any violations which are not readily adjustable or are of a serious nature. Full-scale investigations should also be made when requested by the Secretary of Labor. (29 CFR 5.6(e).) For full-scale investigation procedure, see Part II, Investigation and Enforcement Manual With Respect to Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction Pursuant to Regulations, Part 5, of the Secretary of Labor.

(6) Cooperate with any representative of the Secretary of Labor making an authorized inspection. (29 CFR 5.10(a).)

(7) Deal with the appropriate Regional office of the Department of Labor in the day-to-day administration and enforcement of labor standards provisions. Cases not involving the consideration of ineligibility or criminal sanctions should be processed to completion on a local basis.

(8) Submit to the Materiel Policy Division, Office of Management Services, the following:

(i) Reports of violations including findings and recommendations on cases involving the consideration of ineligibility or criminal sanctions. (29 CFR 5.6(b), 5.7 and 5.9(b).)

(ii) Recommendations for a hearing by the Secretary of Labor. (29 CFR 5.10(b).)

(iii) Requests for rulings or interpretations by the Secretary of Labor. (29 CFR 5.11.)

(iv) Requests for initial approval for the use of blanket wage determinations. (§ 2-12.455-2(a) (1) (iii).)

(b) The responsibilities of the Materiel Policy Division, Office of Management Services, in coordinating the activities under this subpart are the following:

(1) Establishment and maintenance of controls for the application and enforcement of the Davis-Bacon Act.

(2) Maintenance of liaison with the Department of Labor, and with national employer and employee organizations as required.

(3) Submission of requests to the Department of Labor for rulings, interpretations, hearings, etc. § 2-12.455–3 Delegation of authority

by contracting officer. (a) Pursuant to Agency Practice 4-4, the contracting officer is permitted to delegate to technical personnel various

« PreviousContinue »