chapter 323), the contracting officer, and the USAID official who approves the procurement requirement are authorized to waive the metric requirement for one of the above reasons. The USAID Metric Executive is authorized to overrule a decision to grant a waiver, or to nullify a blanket waiver made by another approving official so long as a contractor's rights under an executed contract are not infringed upon.

(2) A blanket waiver for a class of multiple transactions may be issued for a term not to exceed three years.

(3) When a waiver will be based upon the adverse impact on U.S. firms, clearance from the USAID Metric Executive and the Office of Small and Disadvantaged Business Utilization (SDB) will be obtained prior to authorization.

(c) Records and reporting. (1) The basis for each waiver and any plans to adapt similar requirements to metric specifications in future procurements should be documented in the contract file.

(2) Each procurement activity will maintain a log of the waivers from the metric requirements which are authorized for its procurements. The logs shall list the commodity/service being procured, total dollar value of the pro

cured item(s), waiver date, authorizing official, basis for waiver, and USAID actions that can promote metrication and lessen the need for future waivers.

(3) Within 30 days of the closing of each fiscal year, each USAID/W procurement activity and each Mission will submit a copy of the metric waiver log for the year to the USAID Metric Executive. (Mission logs are to be consolidated in a Mission report for the procurement activity and for the nonprocurement activities maintaining such logs under the USAID Metric Transition Plan.) Repetitive purchases of commercially produced and marketed items and classes of items may be consolidated in reporting procurements that do not exceed $10,000 cumulatively during the reporting period.

[57 FR 23321, June 3, 1992, as amended at 59 FR 33446, June 29, 1994. Redesignated and amended at 61 FR 39091, July 26, 1996. Redesignated and amended at 62 FR 40467, July 29, 1997]

711.002-71 Solicitation provisions and contract clauses.

The contracting officer shall insert the clause at 752.211-70 in all USAID-direct solicitations and contracts.

[57 FR 23321, June 3, 1992. Redesignated and amended at 61 FR 39091, July 26, 1996]

[blocks in formation]
[blocks in formation]

(b) Technical evaluation procedures. (1) The contracting officer will receive all proposals and provide to the chair a listing and copies of the technical proposals and instructions for conducting the evaluation.

(2) The chair will promptly call a meeting of the committee to evaluate the proposals received. The evaluation shall be based on the evaluation factors set forth in the solicitation document.

(3) The chair shall prepare and provide to the Contracting Officer written documentation summarizing the results of the evaluation of each proposal, including an assessment of past performance information in accordance with FAR 15.305(a)(2). The documentation shall include narrative justification of the evaluation results.

(4) The contracting officer is responsible for reviewing the documentation justifying the evaluation results to determine that it is adequate and complete. The contracting officer shall return a justification determined to be inadequate to the chair for revision.

(5) No member of the USAID evaluation committee shall hold discussions with any offeror before or during the USAID evaluation committee's proceedings, nor shall any information about the proposals be provided to anyone not on the committee without first obtaining the contracting officer's consent.

[61 FR 39091, July 26, 1996. Redesignated and amended at 64 FR 16648, Apr. 6, 1999]

715.305 Proposal evaluation. (a)(1) [Reserved]

(2) USAID shall use the information on offerors made available from the NIH Contractor Performance System to evaluate past performance. (Access to the system by USAID contracting office personnel is authorized by the USAID Past Performance Coordinator, E-mail address: AIDNET: Past Per

formance@op.spu@aidw/Internet: pastperformance@usaid.gov.)

(b) A justification is to be written by the Contracting Officer and placed in the official file to support the decision to reject all proposals and to cancel the procurement.

(c) The Contracting Officer may authorize release of proposals outside the Government for evaluation—

(1) When an Evaluation Assistance Contract (EAC) is required to provide technical advisory or other services relating to the evaluation of proposals;

or

(2) When an individual other than a government employee, known as a Non-Government Evaluator (NGE), is selected to serve as a member of a USAID technical evaluation committee, the Contracting Officer shall obtain a signed and dated certification and agreement from each NGE and EAC that they will safeguard the proposals and information therein and that they perceive no actual or potential conflict of interests. (An acceptable certification appears under ADS Chapter 302).

[64 FR 16648, Apr. 6, 1999; 64 FR 25405, May 11, 1999, as amended at 65 FR 36642, June 9, 2000]

[blocks in formation]

The following selection procedures may be used, when appropriate, for activities covered under Title XII of the Foreign Assistance Act of 1961, as amended.

[64 FR 16649, Apr. 6, 1999]

715.370-1 Title XII selection procedure general.

(a) General. The Deputy Administrator has determined, as provided in AIDAR 706.302–70(b)(3)(ii) that use of this Title XII source selection procedure is necessary so as not to impair or affect USAID's ability to administer Title XII of the Foreign Assistance

Act. This determination is reflected in AIDAR 706.302–70(b)(4). This constitutes authority for other than full and open competition when selecting Title XII institutions to perform Title XII projects.

(b) Scope of subsection. This subsection prescribes policies and procedures for the selection of institutions eligible under Title XII of the Foreign Assistance Act of 1961, as amended, to perform activities authorized under Title XII.

(c) Applicability. The provisions of this subsection are applicable when the project office certifies that the activity is authorized under Title XII, and determines that use of the Title XII selection procedure is appropriate.

(d) Solicitation, evaluation, and selection procedures. (1) Competition shall be sought among eligible Title XII institutions to the maximum practicable extent; this requirement shall be deemed satisfied when a contractor is selected under the procedures of this subsection.

(2) The project office shall

(i) Prepare selection criteria for evaluation of eligible institutions for use in preparing the source list, determining predominantly qualified sources, and selecting the contractor;

(ii) Prepare an initial list of eligible institutions considered qualified to perform the proposed activity;

(iii) Provide a statement describing qualifications and areas of expertise considered essential, a statement of work, estimate of personnel requirements, special requirements (logistic support, government furnished property, and so forth) for the contracting officer's use in preparing the request for technical proposal (RFTP).

(iv) Send a memorandum incorporating the certification and determination required by paragraph (c) of this section, together with the information required by paragraphs (d)(2) (i) through (iii) of this section, with the "Action" copy of the PIO/T to the contracting officer, requesting him/her to prepare and distribute the RFTP.

(3) Upon receipt and acceptance of the project officer's request, the contracting officer shall prepare the RFTP. The RFTP shall contain sufficient information to enable an offeror

to submit a responsive and complete technical proposal. This includes a definitive statement of work, an estimate of the personnel required, and special provisions (such as logistic support, government furnished equipment, and so forth), a proposed contract format, and evaluation criteria. No cost or pricing data will be requested or required by the RFTP. The RFTP will be distributed to the eligible institutions recommended by the project office. The RFTP will be synopsized, as required by FAR 5.201, and will normally allow a minimum of 60 days for preparation and submission of a proposal.

(4) Upon receipt of responses to the RFTP by the contracting officer, an evaluation committee will be established as provided for in 715.608 of this subpart.

(5) The evaluation committee will evaluate all proposals in accordance with the criteria set forth in the RFTP, and will prepare a selection memorandum which shall:

(i) State the evaluation criteria; (ii) List all of the eligible institutions whose proposals were reviewed;

(iii) Report on the ranking and rationale therefor for all proposals;

(iv) Indicate the eligible institution or institutions considered best qualified.

(6) The evaluation committee will submit the selection memorandum to the contracting officer for review and approval.

(7) The contracting officer will either approve the selection memorandum, or return it to the evaluation committee for reconsideration for specified rea

sons.

(8) If the selection memorandum is approved, the contracting officer shall obtain cost, pricing, and other necessary data from the recommended institution or institutions and shall conduct negotiations. If a satisfactory contract cannot be obtained, the contracting officer will so advise the evaluation committee. The evaluation committee may then recommend an alternate institution or institutions.

[52 FR 6158, Mar. 2, 1987, as amended at 54 FR 28069, July 5, 1989; 55 FR 6802, Feb. 27, 1990. Redesignated at 64 FR 16648, Apr. 6, 1999]

715.370-2 Title XII selection procedure collaborative assistance.

(a) General. (48 CFR) AIDAR 706.30270(b)(4) provides authority for other than full and open competition when selecting Title XII institutions to perform Title XII activities.

(b) Scope of subsection. This subsection prescribes policies and procedures for the selection of institutions eligible under Title XII of the Foreign Assistance Act of 1961, as amended, to perform activities authorized under Title XII, where USAID has determined, in accordance with paragraph (c) of this subsection, that use of the collaborative assistance contracting system is appropriate. See AIDR Appendix F (of this chapter)-Use of Collaborative Assistance Method for Title XII Activities for a more complete definition and discussion of the collaborative assistance method.

(c) Determinations. The following findings and determinations must be made prior to initiating any contract actions under the collaborative assistance method:

(1) The cognizant technical office makes a preliminary finding that an activity:

(i) Is authorized by Title XII; and

(ii) Should be classed as collaborative assistance because a continuing collaborative relationship between USAID, the host country, and the contractor is required from design through completion of the activity, and USAID, host country, and contractor participation in a continuing review and evaluation of the activity is essential for its proper execution.

(2) Based upon this preliminary finding, the cognizant technical office shall establish an evaluation panel consisting of a representative of the cognizant technical office as chairman, a representative of the contracting officer, and any other representatives considered appropriate by the chairman to review the proposed activity for its appropriateness under the collaborative assistance method.

(3) If supported by the panel's findings, the chairman will make a formal written determination that the collaborative assistance method is the appropriate contracting method for the Title XII activity in question.

(d) Evaluation and selection. (1) Competition shall be sought among eligible Title XII institutions to the maximum practicable extent; this requirement shall be deemed satisfied when a contractor is selected under the procedures of this section.

(2) The evaluation panel shall:

(i) Prepare evaluation and selection criteria;

(ii) Prepare an initial source list of eligible institutions considered qualified to perform the proposed project; and

(iii) Evaluate the list, using the evaluation criteria previously determined, for the purpose of making a written determination of the sources considered most capable of performing the project.

(3) The chairman of the evaluation panel will prepare a memorandum requesting the contracting officer to prepare a request for expressions of interest from qualified sources and setting forth:

(i) The formal determinations required by paragraph (c) of this section; (ii) The evaluation criteria which have been determined; and

(iii) The recommended source list and the rationale therefor.

(4) The contracting officer will prepare a request for an expression of interest (REI), containing sufficient information to permit an offeror to determine its interest in the project, and to discuss the project with USAID representatives, if appropriate. The REI should include a concise statement of the purpose of the activity, any special conditions or qualifications considered important, a brief description of the selection procedure and evaluation criteria which will be used, the proposed contract format, and any other information considered appropriate. The REI will be issued to the sources recommended by the panel, and to others, as appropriate; it will be synopsized, as required by FAR 5.201, and it will normally allow a minimum of 60 days for preparation of an expression of interest. Guidelines for preparation of expressions of interest are contained in attachment 1 to AIDAR appendix F.

(5) The contracting officer will transmit all expressions of interest to the evaluation panel for evaluation and selection recommendation. The panel