APPROPRIATION TITLE:

Construction, General

Reservoirs (Flood Control)

PROJECT: Ray Roberts Lake, Texas (Continuing)

LOCATION: Ray Roberts Lake will be located at river mile 60.0 on the Elm Fork of the Trinity River, in northeast Denton
County, Texas, between the towns of Sanger and Aubrey and 30 miles upstream from the existing Lewisville Dam.
AUTHORIZATION: River and Harbor Act of 1965

BENEFIT-COST RATIO: The remaining benefit-remaining cost ratio is 3.8 to 1 at 314 percent. The benefit-cost ratio for
the fiscal year for which Congress appropriated initial construction funds (FY 1975) was 2.4 to 1. The benefit-cost
ratio is based on the project's fair share of system benefits in the Trinity River System.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

1/ Reflects $4,000,000 reduction assigned as savings and slippage and $8,000,000 transfer from project.

[blocks in formation]
[blocks in formation]

Uncontrolled Broadcrested

Spillway:
Type
Length
Design Capacity
(Max Pool)

100 feet

FISCAL YEAR 1986:

[ocr errors]
[blocks in formation]

Water Supply Recreation

Total

260,800 acre-feet 749,200 acre-feet 54,600 acre-feet 1,064,600 acre-feet

Relocations

42.5 miles ($42,946,000) Roads 2.7 miles ($8,502,000) Railroads Utilities, Cemeteries › and Structures - ($6,349,000)

14,500 cubic feet per second

The flood

The project is an authorized element in the plan of improvement of the Trinity River Basin.
control storage in Ray Roberts Lake will allow reallocation of storage in the lake behind Lewisville Dam downstream to
The project will provide 74.3 million gallons per day for municipal and
JUSTIFICATION:
industrial water supply and satisfy recreation needs of 6,000,000 user days annually (includes increases due to
increase storage allocated to water supply.
Estimated average annual benefits are as follows:
Lewisville Modification).

Benefits

The requested amount will be applied as follows: Continue Land Acquisition

Continue Relocations

Amounts

(1 October 1984) $15,089,000 6,243,000 $21,332,000

Continue Boundary Monumentation, Initiate Fencing Part IV &

Revegetation Pt I and complete Clearing Part II Complete Ray Roberts Dam and Lewisville Dam Riprap Initiate Recreation Facilities

[merged small][merged small][merged small][ocr errors][merged small]

$19,049,000 23,804,000 2,075,000

4,069,000

200,000

200,000

180,000

350,000

Complete Cultural Resource Preservation

Initiate Permanent Operating Equipment
Engineering and Design

Supervision and Administration

Total

The funds requested above are required to continue construction and meet the scheduled completion dates.

4 FEB 1985

2,073,000

$52,000,000

Ray Roberts Lake, Texas

142

NON-FEDERAL COST: Local interests are required to reimburse the Federal Government for costs allocated to water supply storage and one-half of the separable costs allocated to recreation and fish and wildlife enhancement. This non-Federal reimbursement is presently estimated at $180,508,000 which includes $161,556,000 for water supply storage. The recreation and fish and wildlife reimbursement is estimated at $18,952,000 exclusive of interest and future recreation facilities and will be furnished by local interests subsequent to the completion of the project. The annual cost to local interests for maintenance, operation, and replacements is $250,000 for water supply and $1,108,000 for recreation for a total of $1,358,000.

STATUS OF LOCAL COOPERATION: The cities of Dallas and Denton, Texas, were designated as co-sponsors of the project by the Texas Water Rights Commission on 4 June 1969. Both cities have signed formal assurances, Dallas on 6 January 1975 and Denton on 18 September 1974, that they would provide the items required by local interests. Updated resolutions were passed by the cities of Dallas and Denton on 30 January 1980 and 22 January 1980, respectively. Water supply and recreation contracts with the cities of Dallas and Denton were approved by the Assistant Secretary of the Army on 16 September 1980.

COMPARISON OF FEDERAL COST ESTIMATES: The current cost estimate of $280,000,000 is the same as the last estimate submitted to Congress. The cost estimate reflects increases of $5,498,000 based on more detailed design of construction and relocations and $993,000 for Engineering and Design and Supervision and Administration based on reanalysis of requirements. These increases were offset by net decreases of $2,078,000 for favorable bids and $1,102,000 for estimated final cost of contracts, $104,000 based on reanalysis of remaining cost for lands, and $3,207,000 for adjustment in estimated inflation allowance through the construction period.

STATUS OF ENVIRONMENTAL IMPACT STATEMENT AND COMPLIANCE WITH CLEAN WATER ACT: The final Environmental Impact Statement was filed with the Council on Environmental Quality on 4 March 1974. An updated supplement was filed on 18 September

1975.

The provisions of Section 404 of the Clean Water Act have been met by a Section 404(b)(1) Evaluation Report signed by
the District Engineer on 12 September 1980 and a Water Quality Certificate has been received from the State.

OTHER INFORMATION: Funds to initiate preconstruction planning were appropriated in FY 1970 and for initiation of construction in FY 1975. Land acquisition was initiated in September 1980 and construction was initiated in September 1981. The State of Texas is currently negotiating with the Corps of Engineers for a recreation contract which will assume a portion of the recreation responsibilities for the cities of Dallas and Denton.

4 FEB 1985

Ray Roberts Lake, Texas 143

[blocks in formation]

f.

8.

h.

Price Escalation

Design Changes

Additional Function Added Under

General Authorization
Authorized Modification

Post-Contract Award and Other

Estimating Adjustments

Schedule Changes

Sundry

Real Estate

Original
Baseline

(1)

110,000 (Jul 73)

Project:

Ray Roberts Lake, Texas

Estimates Presented to Congress ($1,000)
Cumulative

Incremental

Changes

Change
(4)

[blocks in formation]

-46,973

0

582

115,838

Last
(3)

280,000 2/

(0) 1/

4 FEB 1985

[blocks in formation]

Current

(5)

280,000 1/2/

Includes a decrease of $3,207 for adjustments in the estimated inflation allowance through the construction period. 2/ Includes an allowance for estimated inflation through construction period.

1/

3/ Includes increases of $5,498 for refinement of design and $993 for reanalysis of Engineering and Design and Supervision and Administration; offset by decreases of $2,078 for favorable bids, $1,102 for estimated final costs of contracts, and $104 based on reanalysis of remaining cost for lands and damages.

Ray Roberts Lake, Texas 144