Page images
PDF
EPUB

1. COMPONENT

NAVY

2. DATE

FY 19 83MILITARY CONSTRUCTION PROJECT DATA

3. INSTALLATION AND LOCATION

MARINE CORPS DEVELOPMENT AND EDUCATION COMMAND, QUANTICO, VIRGINIA

4. PROJECT TITLE

5. PROJECT NUMBER

COLD STORAGE WAREHOUSE

SUPPLEMENTAL DATA

P-116

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

110

($000)

0

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

2,700
($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

2,880
(8000)

[blocks in formation]

F.

[blocks in formation]

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED
FROM OTHER APPROPRIATIONS:

[blocks in formation]
[blocks in formation]

Pollution control including electrostatic precipitators; building alterations and modernization; upgrade coal handling equipment and cold storage facilities; new steam distribution lines; utility upgrade.

11. REQUIREMENT: VARIES.

PROJECT: Converts central heating plant to coal firing capability. Provides pollution abatement equipment to allow coal burning ecologically. Constructs steam distribution lines to the airfield and medical clinic. REQUIREMENT: Comply with national policy to convert to mcre readily available coal fuel and reduce dependency on oil.

CURRENT SITUATION: The existing steam plant originally had the capability of burning oil or coal. However, the plant lacks pollution abatement facilities to burn coal ecologically. The condition of coal handling and burning equipment has deteriorated because of being dormant.

IMPACT IF NOT PROVIDED: During periods of oil shortages and high cost the government will continue to burn expensive oil when lower cost, more plentiful coal is available.

ADDITIONAL: An economic analysis has not been prepared as there is no alternative for compliance with national policy.

[blocks in formation]

90-267 0-82--58

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO

75

1. COMPONENT

NAVY

2. DATE

FY 19_83 MILITARY CONSTRUCTION PROJECT DATA

3. INSTALLATION AND LOCATION

MARINE CORPS DEVELOPMENT AND EDUCATION COMMAND, QUANTICO, VIRGINIA 4. PROJECT TITLE

5. PROJECT NUMBER

STEAM PLANT MODIFICATIONS

SUPPLEMENTAL DATA

P-189

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.....

3,720
($000)

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

6

[ocr errors]

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

71,680

($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

N/A

($000)

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

10. Mission or Major Functions: Provide for reception and recruit training of enlisted personnel upon their entry into the Marine Corps. Conducts schools to train enlisted men for duty with ships detachments, as drill instructors, and field musics. Conducts such other schools as directed.

[blocks in formation]

NAVY COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

MARINE CORPS RECRUIT DEPOT,
SAN DIEGO, CALIFORNIA

INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

B. Similar Unused Space:

MARINE CORPS COMMAND

($000)

4,040

Permanent Facilities
Temporary Facilities (

4,030

10 )

[blocks in formation]

C. Outstanding Pollution and Safety (OSH) Deficiencies:

[blocks in formation]

($000)

0

1,000

2,980

« PreviousContinue »