B. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.... NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 180 ($000) 0 (PEOPLE) 8,190 N/A ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED provide services and materials to support the operations of a Marine Aircraft Wing, or units thereof, and other activities and units as designated by the Commandant of the Marine Corps in coordination with the Chief of Naval Operations. DD FORM 1390 SUPPLEMENTAL DATA FY 1983 MILITARY CONSTRUCTION PROGRAM NAVY COMPONENT MARINE CORPS AIR STATION, MARINE CORPS COMMAND ($000) A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981): 27,500 C. Outstanding Pollution and Safety (OSH) Deficiencies: New aircraft parking apron, concrete paving on prepared base, tie downs, aircraft service points, útilities; demolition of existing parking apron, removal and replacement of unsuitable subgrade material. 11. REQUIREMENT: 566,100 SY. ADEQUATE: 353,100 SY. SUBSTANDARD: 271,500 SY. PROJECT: Replaces deteriorated aircraft parking apron. REQUIREMENT: Adequate aircraft parking pavement to meet strength and functional requirements for modern jet aircraft. CURRENT SITUATION: Constructed during the 1940's, the existing aircraft parking apron is in an advanced state of deterioration because of heavier, high-performance jet aircraft wheel loadings. IMPACT IF NOT PROVIDED: Foreign object damage will be incurred by aircraft engines. Hazards to maintenance and flight personnel will continue. ADDITIONAL: An economic analysis has not been prepared as there is no alternative to meet the requirement. This project has been incremented to permit continuous aviation operations; this is increment five of six. DD. FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 57 1. COMPONENT 2. DATE FY 19 83 MILITARY CONSTRUCTION PROJECT DATA NAVY 3. INSTALLATION AND LOCATION MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA 4. PROJECT TITLE 5. PROJECT NUMBER AIRCRAFT PARKING APRON SUPPLEMENTAL DATA P-609 A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE DESIGN DATA (Estimated) 45 ($000) 0 (PEOPLE) 680 ($000) ($000) E. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED |