Page images
PDF
EPUB
[blocks in formation]

MAY

ARMY COMPONENT

DD Form 1390 Supplemental Data
FY 83 Military Construction Program

Ras Banas

INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

Permanent Facilities
Temporary Facilities

B. Similar Unused Space:

Real Property Categories

1 Feb 82

Quantity/Unit of
Measure

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

FORSCOM
COMMAND

($000)

($000)

0

0

[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION Construction of an intermediate staging base with headquarters, supply and maintenance facilities. Work includes provision for improving port facilities

REQUIREMENT

PROJECT Construction of the second increment of an Army base camp in the Indian Ocean area.

REQUIREMENT: This project is required to provide essential support facilities which may be necessary to support contingency operations in this area of the world.

CURRENT SITUATION: There are insufficient facilities available in the area to satisfy the requirements for support of U. S. Forces. IMPACT IF NOT PROVIDED: Should contingency operations become necessary, the capability to sustain any operation in this area will be seriously jeopardized if the requested facilities are not available for use when required.

MAY

[blocks in formation]

MAY

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.........................

($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

($000)

[blocks in formation]

F.

2.

STATUS

[blocks in formation]

3.

8.

b.

c.

d.

e.

Production of Plans and Specs (6% limit).

All other design costs...

Total Cost = (a+b) = (d+e)..

Contract......

In-house.......

4. CONSTRUCTION START (Planned).......

[blocks in formation]

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM
OTHER APPROPRIATIONS:

Equipment Nomenclature

Procuring
Appropriation

FY of Appropriation
Or Requested

Cost ($000)

« PreviousContinue »