ARMY COMPONENT DD Form 1390 Supplemental Data Ras Banas INSTALLATION/LOCATION A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981): Permanent Facilities B. Similar Unused Space: Real Property Categories 1 Feb 82 Quantity/Unit of C. Outstanding Pollution and Safety (OSHA) Deficiencies: FORSCOM ($000) ($000) 0 0 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construction of an intermediate staging base with headquarters, supply and maintenance facilities. Work includes provision for improving port facilities REQUIREMENT PROJECT Construction of the second increment of an Army base camp in the Indian Ocean area. REQUIREMENT: This project is required to provide essential support facilities which may be necessary to support contingency operations in this area of the world. CURRENT SITUATION: There are insufficient facilities available in the area to satisfy the requirements for support of U. S. Forces. IMPACT IF NOT PROVIDED: Should contingency operations become necessary, the capability to sustain any operation in this area will be seriously jeopardized if the requested facilities are not available for use when required. MAY B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE ($000) F. 2. STATUS 3. 8. b. c. d. e. Production of Plans and Specs (6% limit). All other design costs... Total Cost = (a+b) = (d+e).. Contract...... In-house....... 4. CONSTRUCTION START (Planned)....... EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Equipment Nomenclature Procuring FY of Appropriation Cost ($000) |