This project is needed to provide administrative and office space for personnel assigned to a new installation mission, the new MLRS weapons system. Additionally, the project is needed to consolidate personnel, presently located at several locations. Administrative space is currently provided in several locations, within buildings designated primarily as There is no NCO Open Mess, supply and storage, arms, etc. location available to consolidate existing administrative functions. Present locations cannot accommodate increased administrative functions or personnel that are needed to support the MLRS. Without this project, current administrative functions will not be consolidated and administrative personnel associated with the MLRS cannot be accommodated, impacting the entire MLRS mission. This project is not within an established NATO Infra- structure Category (including the Reinforcement Support Category). for common funding, nor is it expected to become eligible.
This project is required to provide hardstand for the 66 wheeled vehicles, 1 engineer vehicle, 22 trailers and 1 generator trailer assigned to an Ammunition Company to be stationed at Kriegsfeld Ammunition Dept in support of the Multiple Launch Rocket System. Since paved parking areas are not available, vehicles are forced to park in grassed areas, on roadsides and outside the depot. This results in traffic congestion, damage to vehicles and adversely affects combat readiness.
This project is required to provide maintenance facilities for the 210 wheeled vehicles and 151 trailers assigned to the Headquarters Battery and six firing batteries of a PATRIOT battalion to be stationed at Rhine Ordnance Barracks. The project includes a 26,312 SF Tactical Equipment Shop which is jointly funded by NATO and MCA; 22,668 SF is to be funded by NATO and the remaining 3,644 SF to be funded by MCA; required supporting facilities have been prorated for joint funding. No facilities exist at Rhine Ordnance Barracks which meet the mission requirements of these units. The PATRIOT Battalion will be unable to maintain its vehicles to standards required for combat effectiveness with the resulting detriment to its mission accomplishment. This project is beyond the scope of an established NATO Infra- structure Category and is not eligible for common funding. A portion of the facility is within NATO criteria (minimum military requirements) and is funded in Slice 34.
This project is required to conserve fuel oil by installation of exhaust air waste heat recovery systems in 9 messhalls at Smith Barracks. The exhaust wasted heat will be recovered by installation of heat exchanger units complete with controls, fans, motors and necessary electrical modifications. The estimated first year savings is $251,000. The amortization period is 1.8 years. The estimated MBTU energy savings per year per thousand dollars project cost ratio is 50.
This project is required to conserve coal by installation of automatic heating controls in the Abrams Building in the head- quarters area. The installation will be complete with sensors, motorized valves and wiring, outdoor weatherstats, time clocks for night and weekend temperature set back, and individual thermostatic radiator valves or zone controls as applicable. The estimated first year savings is $200,000. The amortization period is 1.5 years. The estimated MBT energy savings per year per thousand dollars project cost ratio is 113.
This project is required to conserve coal and fuel oil by converting heating systems in 12 buildings from steam to hot water and providing time clock temperature control in 27 chapel and administrative buildings at Cooke Barracks. These buildings require full heating only 8 to 10 hours per day. To provide a system which can be properly controlled, steam radiators and piping will be removed from the 12 buildings. Hot water systems will be installed including hot water heat exchangers, convertors, piping and insulation, pumps, valves and flow controllers. The time clock controlled set back systems will also control the building distribution systems return water temperature in response to outdoor air temperature and desired space temperatures. The estimated first year savings is $126,000. The amortization period is 3.5 years. The estimated MBTU energy savings per year per thousand dollars project cost ratio is 43.
This project is required to increase the potential production of potable water at the depot by 38 KG to satisfy the needs of an increased depot population resulting from the future assignment of an ammunition company with 191 personnel associated with the Multiple Launch Rocket System. Three other proposed restationing moves assigning 134 personnel will raise the depot population to approximately 900. Additional potable water storage capacity of 30,000 gallons is also required. Three existing wells at the depot have a capacity of 76 KG. Potable water storage capacity is one 29,000 gallon tank. There are two storage tanks of 30,000 and 26,000 gallons for fire protection. The water supply system is operating close to maximum output. Upon assignment of additional personnel to the depot, the deficiency of potable water will seriously impair installation operations and depress the morale and threaten the health of assigned personnel. This project is not within an established NATO Infrastructure Category (including the Reinforcement Support Category) for common funding, nor is it expected to become eligible.
This project is required to conserve coal and fuel oil by installation of temperature setback controls in 64 buildings at Gablingen Kaserne, Elak Kaserne and the Quarter Master Supply Center. The installation will include unoccupied period setback controls complete with control panel, outside weatherstat sensors, inside thermostats, valves, clocks and electrical wiring to provide a complete system. The estimated first year savings is $79,000. The amortization period is 2.0 years. The estimated MRT! energy savings per year per thousand dollars project cost ratio is 131.
This project is required to conserve fuel oil by installing a waste oil collection and processing system at Smith Barracks. The system located adjacent to Heating Plant 8655 will consist of a concrete catch basin, overhead storage tanks, piping, filters, pumps and electrical wiring. After proper filtering, the waste oil will be mixed with new fuel oil and burned in the central heating plant boilers. The estimated first year savings is $99,000. The amortization period is 1.2 years. The estimated MBTJ energy savings per year per thousand dollars project cost ratio is 92.
Expansion of the 2/27 Field Artillery Battalion of the 3rd Armored Division requires additional space in which to maintain their field artillery guns, prime movers and related equipment assigned to the unit. This artillery unit is located at an overcrowded installation which has insufficient space to adequately maintain its equipment. Existing adequate and substandard facilities are occupied by currently deployed units. No other facilities are available to satisfy the needs of this unit. Without this project, facilities will not be available to accommmodate the additional equipment, adversely affecting equipment condition and unit readiness. This project is not within an established NATO Infrastructure Category (including the Reinforcement Support Category) for common funding, nor is it expected to become eligible.