Construct a barracks building billet rooms, to include laundry rooms, storage areas, day rooms, latrines, utilities, communications, parking and site improvement. Heating by an oil-fired furnace. Not sited in a flood plain. REQUIREMENT: 486 PN Adequate: 285 PN Substandard: None PROJECT: Construct barracks for 170 persons with a maximum capacity of 179. REQUIREMENT: This project is needed to provide adequate on-post housing for an ammunition company scheduled to be stationed at Kriegsfeld in support of the Multiple Launch Rocket System (MLRS). Additionally, the project will provide on-post housing to some of the 65-70 personnel who are required to live on the economy at scattered locations. The unit will provide ammunition support to missile systems. The on-post housing is needed so that adequate, centrally located, and affordable housing will be available for the currently assigned personnel and the MLRS ammunition company to be stationed at Kriegsfeld. CURRENT SITUATION: Present facilities are utilized to the maximum, and 65-70 personnel live on the economy in rented or leased apartments. The off-post apartments are scattered, expensive, difficult to find, and do not provide flexibility due to the rent or lease arrangements. There are no facilities on-post capable of being utilized as billets for the newly assigned troops in the MLRS ammunition company. MAY IMPACT IF NOT PROVIDED. The currently assigned personnel will continue to utilize all on-post billets and to enter into local economy rental agreements. The personnel to be assigned due to deployment of the MLRS will be required to seek limited housing available on the economy, if possible. Operational control will be extremely difficult; the soldier will be required to bear an expensive housing, food and transportation burden. Deployment of the MLRS will be jeopardized. NATO INFRASTRUCTURE CATEGORY: This project is not within an established NATO Infrastructure Category (including the Reinforcement Support Category) for common funding, nor is it expected to become eligible. MAY B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 105 ($000 7. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: Equipment Nomenclature Procuring FY of Appropriation Cost ($000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a storage and maintenance building with loading dock, pavement, oil storage and supporting facilities. Not sited in a flood plain. 11. REQUIREMENT: 15,000 SF Adequate: None Substandard: None PROJECT: Construct a maintenance and support facility at Hohenfels Training Area, Hohenfels, Germany. REQUIREMENT: This proiect is required to provide a facility to store and maintain 25,000 pieces of Multiple Integrated Laser Fngagement System (MILES) equipment. This equipment consists of training aids which are sensitive electronic equipment requiring a storage facility for protection from the elements and a heated area where maintenance, repair and inventory can be accomplished. This project supports the Army's modernization program in Furope. CURRENT SITUATION: There are no facilities to store, repair, maintain and inventory MILES equipment at Hohenfels Training Area. The sensitive electronic equipment is stored in whatever space is available in several different buildings. Some equipment is stored outdoors. IMPACT IF NOT PROVIDED: Adequate facilities are not available to store, maintain, repair or inventory MILES equipment, adversely affecting troop training using this training system. NATO INFRASTRUCTURE CATEGORY: This project is not within an established NATO Infrastructure Category (including the Reinforcement Support Category), for common funding nor is it expected to become eligible. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 25 ($000) 4 (PEOPLE) N/A ($000) N/A ($000 Jul 81 51 100 Sep 82 No X 56 55 111 64 47 Apr 83 (month and year) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Equipment Nomenclature Procuring FY of Appropriation Cost ($000) |