facility to include kitchen, dining, and food storage areas, utilities, communications and site improvement. Heating from an existing heating plant Substandard: None The 11. REQUIREMENT: 1,364 PN Adequate: 650 PN PROJECT: Construction of a dining facility. REQUIREMENT: This project is needed to provide messing facility support for a Patriot battalion to be stationed on Rhine Ordnance Barracks. battalion will perform a 24 hour NATO integrated air defense mission from two peacetime tactical sites supported from the garrison area. CURRENT SITUATION: No facilities are currently available and none are expected to become available that can support the dining requirement of the Patriot battalion. IMPACT IF NOT PROVIDED: The Patriot battalion activation cannot be NATO INFRASTRUCTURE CATEGORY: This project is not within an established B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 43 ($000) 32 (PEOPLE) N/A N/A Aug 81 January 1982.. 37 c. Percent Complete as of 1 October 1982 2. d. BASIS 2. Standard or Definitive Design - Yes b. Where Design Was Most Recently Used COST (Total - $000) Production of Plans and Specs (6% limit)........ 3. 8. b. All other design costs..... F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Upgrade of existing Range 9. Work includes provision of a control tower with programmable control unit, target maintenance building, concrete target pits, stationary and moving targets, parking areas, latrine and messing facilities, tent pads, gravel roads, concrete turn pads, defilade firing positions and other miscellaneous troop support facilities: provision of commercial power and rectifiers. Not sited in a flood plain. Work to be accomplished by troop labor. This range 11. REQUIREMENT: 1 FA Adequate: None Substandard: 1 FA PROJECT: Upgrade of Range at Wildflecken Training Area. REQUIREMENT: This project is required to provide a range to meet the standards necessary for qualification in the employment of Infantry Fighting Vehicles (IFV) and Cavalry Fighting Vehicles (CFV). will continue to be used by M60A1 and M60A3 tank units: however it must be modified and upgraded for use by units employing the M2 (an IFV) and M3 (a CFV) vehicle and associated weapons systems. The range will be used primarily to train 34 infantry battalions annually. Additionally, reconnaissance elements organic to all infantry battalions, armored cavalry elements and combat engineer units may use the range. This proiect must be accomplished in this program so as to be available for use upon introduction of the M2 and M3 in USAREUR. CURRENT SITUATION: This range was developed to support training in the use of 50 caliber and 7.62 mm machine guns and does not have the capability of supporting training for the IFV and CFV and associated weapons systems. DEC MAY IMPACT IF NOT PROVIDED: Units will not receive adequate training in the employment of the IFV and CFV thus jeopardizing their ability to accomplish their combat missions effectively. NATO INFRASTRUCTURE CATEGORY: This project is not eligible for NATO Infrastructure funding. In response to Congressional Direction, action has been initiated to achieve NATO eligibility for this project. precautionary prefinancing statement will be submitted for this project. Α MAY A. ESTIMATED ANNUAL COST TO OPERATE PROPOSED FACILITY.......... 1 Feb 1982: 5. PROJECT NUMBER 113 B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE ($000) (PEOPLE N/A ($000) N/A ($000) Apr 81 35 100 ....... Oct 82 F. 3. COST (Total - $000) a. b. All other design costs........... c. Total Cost = (a+b) = (d+e)..................... 152 153 EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Equipment Nomenclature Procuring FY of Appropriation Cost ($000) |