Page images
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

facility to include kitchen, dining, and food storage areas, utilities, communications and site improvement. Heating from an existing heating

plant

Substandard: None

The

11. REQUIREMENT: 1,364 PN Adequate: 650 PN PROJECT: Construction of a dining facility. REQUIREMENT: This project is needed to provide messing facility support for a Patriot battalion to be stationed on Rhine Ordnance Barracks. battalion will perform a 24 hour NATO integrated air defense mission from two peacetime tactical sites supported from the garrison area. CURRENT SITUATION: No facilities are currently available and none are expected to become available that can support the dining requirement of the Patriot battalion.

IMPACT IF NOT PROVIDED: The Patriot battalion activation cannot be
accomplished at Phine Ordnance Barracks.

NATO INFRASTRUCTURE CATEGORY: This project is not within an established
NATO Infrastructure Category (including the Reinforcement Support
Category) for common funding, nor is it expected to become eligible.
Related facilities (Minimum Military Requirements) are programmed in NATO
Slice 34.

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.........

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...............

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.......

[merged small][merged small][merged small][merged small][ocr errors][merged small]

43

($000)

32

(PEOPLE)

N/A
($000)

N/A
($000)

Aug 81

[blocks in formation]

January 1982..

37

c.

Percent Complete as of 1 October 1982
Data Design Completed.....

[blocks in formation]

2.

d.

BASIS

2. Standard or Definitive Design - Yes

b. Where Design Was Most Recently Used

COST (Total - $000)

Production of Plans and Specs (6% limit)........

3.

8.

b.

All other design costs.....

[blocks in formation]
[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM
OTHER APPROPRIATIONS:

[blocks in formation]
[blocks in formation]

Upgrade of existing Range 9. Work includes provision of a control tower with programmable control unit, target maintenance building, concrete target pits, stationary and moving targets, parking areas, latrine and messing facilities, tent pads, gravel roads, concrete turn pads, defilade firing positions and other miscellaneous troop support facilities: provision of commercial power and rectifiers. Not sited in a flood plain. Work to be accomplished by troop labor.

This range

11. REQUIREMENT: 1 FA Adequate: None Substandard: 1 FA PROJECT: Upgrade of Range at Wildflecken Training Area. REQUIREMENT: This project is required to provide a range to meet the standards necessary for qualification in the employment of Infantry Fighting Vehicles (IFV) and Cavalry Fighting Vehicles (CFV). will continue to be used by M60A1 and M60A3 tank units: however it must be modified and upgraded for use by units employing the M2 (an IFV) and M3 (a CFV) vehicle and associated weapons systems. The range will be used primarily to train 34 infantry battalions annually. Additionally, reconnaissance elements organic to all infantry battalions, armored cavalry elements and combat engineer units may use the range. This proiect must be accomplished in this program so as to be available for use upon introduction of the M2 and M3 in USAREUR.

CURRENT SITUATION: This range was developed to support training in the use of 50 caliber and 7.62 mm machine guns and does not have the capability of supporting training for the IFV and CFV and associated weapons systems.

DEC

MAY

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

IMPACT IF NOT PROVIDED: Units will not receive adequate training in the employment of the IFV and CFV thus jeopardizing their ability to accomplish their combat missions effectively.

NATO INFRASTRUCTURE CATEGORY: This project is not eligible for NATO Infrastructure funding. In response to Congressional Direction, action has been initiated to achieve NATO eligibility for this project. precautionary prefinancing statement will be submitted for this project.

Α

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE PROPOSED FACILITY..........

1 Feb 1982:

5. PROJECT NUMBER

113

B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY......

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...........

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.....

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]

($000)

(PEOPLE

N/A

($000)

N/A ($000)

Apr 81 35 100

.......

[ocr errors]

Oct 82

[blocks in formation]

F.

3.

COST (Total - $000)

a.

b.

All other design costs...........

c.

Total Cost = (a+b) = (d+e).....................

[blocks in formation]

152

153

[blocks in formation]

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM
OTHER APPROPRIATIONS:

Equipment

Nomenclature

Procuring
Appropriation

FY of Appropriation
Or Requested

Cost ($000)

« PreviousContinue »