10. DESCRIPTION OF PROPOSED CONSTRUCTION Construction of a barracks with administrative space, laundry rooms, storage and dayrooms. Heating from a self-contained plant. Not sited in a flood plain. 11. REQUIREMENT: 5,210 PN Adequate: 4,600 PN Substandard: 244 PN PROJECT: Construction of a barracks for 83 persons with a maximum capacity of 90. REQUIREMENT: This project is required to provide barracks for of a Multiple Launch Rocket System (MLRS) battery being deployed in Bamberg. CURRENT SITUATION: Adequate barrack space is not available to accommodate the MLRS battery; which must be stationed in Bamberg to accomplish its mission. IMPACT IF NOT PROVIDED: Activation of the MLRS system will be delayed. NATO INFRASTRUCTURE CATEGORY: This project is not within an established NATO Infrastructure Category (including the Reinforcement Support Category) for common funding, nor is it expected to become eligible. C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE F. 2. 3. 4. STATUS ($000 9 (PEOPLE) (month and year) EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Equipment Nomenclature Procuring FY of Appropriation Cost ($000) MAY Installed Equipment - Other Appropriations 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct two barracks buildings to include administrative area, laundry rooms, personnel storage area, latrines, billet rooms, dayrooms, utilities, parking, and site improvement. Heating provided from heat plant provided in basement of Battalion Headquarters facility, to be built in this FY program (MCA Project 119). Not sited in a flood plain. Mechanical ventilation 150,000 CFM 11. REQUIREMENT: 1,286 PN Adequate: 790 PN Substandard: 89 PN PROJECT: Construct two barracks buildings, each for 289 enlisted personnel with a maximum capacity of 318. REQUIREMENT: This project is needed to provide billet facilities for the deployment of a Multiple Launch Rocket System (MLRS) at Peden Barracks. The barracks provided by this project are essential to provide the living accommodations needed by the increased personnel who will be located at this site in support of VII Corps. This project also provides administrative and storage space for four batteries. CURRENT SITUATION: Existing barracks are at capacity. There are no existing facilities that can be used to billet the new personnel who will be stationed at Peden Barracks as part of the MLRS. The local economy cannot billet the MLRS battalion. in high demand by families. Apartments are scarce, expensive, and IMPACT IF NOT PROVIDED: Deployment of the MLRS will be delayed. MAY Construction of a 26,312 SF Tactical Equipment Shop which is jointly funded by NATO and MCA. 22,668 SF funded by NATO, 3,644 SF funded by MCA. Construction includes compressed air supply, overhead crane and POL Waste tank. Required supporting facilities have been prorated for joint funding. Not sited in a flood plain. Heating from a self-contained plant. 11. REQUIREMENT: 37,598 SF Adequate: None Substandard: 5,021 SF PROJECT: Construction of a NATO and MCA jointly funded tactical equipment shop at Anderson Rarracks, Dexheim, Germany. REQUIREMENT: This project is required to provide maintenance facilities for the 210 wheeled vehicles, and 151 trailers assigned to the PATRIOT Headquarters Rattery and four firing batteries to be stationed at Anderson Barracks. CURRENT SITUATION: Existing facilities are over-utilized by existing equipment and cannot be used to support deployment of the PATRIOT system. IMPACT IF NOT PROVIDED: Adequate maintenance facilities will not be available, adversely affecting equipment performance and combat readiness. NATO INFRASTRUCTURE CATEGORY: This project is not within an established NATO Infrastructure category for commond funding, nor is it expected to become eligible. A portion of the facility is within NATO criteria (Minimum Military Requirements) and is programmed in Slice 33. A. ESTIMATED ANNUAL COST TO OPERATE PROPOSED FACILITY............. C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 12 ($000) 6 (PEOPLE) N/A ($000) N/A ($000 Aug 81 37 65 Jan 83 No X e. In-house.... 4. CONSTRUCTION START (Planned).. 39 ... 32 72 47 25 June 83 (month and year) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Equipment Nomenclature Procuring FY of Appropriation Cost ($000) 90-267 O-82-37 |