Installed Equipment Other Appropriations 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a maintenance compound with 52,884 SF REQUIREMENT: This project is required to provide facilities for D CURRENT SITUATION: Ferris Barracks was constructed by the German Existing facilities will continue in use MAY 90-267 0-82-35 C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 14,876 F. 4. CONSTRUCTION START (Planned).............. (month and year) EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Construct an addition to a tactical equipment shop (Ruilding 68, Conn Barracks) to provide maintenance areas, bridge crane, storage and administrative areas, aprons and supporting facilities. Not sited in a flood plain. Heating from an existing plant. 11. REQUIREMENT: 195,288 SF Adequate: 77,043 SP Substandard: 73,676 SF PROJECT: Construction of an addition to a tactical equipment shop. REQUIREMENT: This project is required to provide adequate facilities for the 2/64 and 3/64 Armor Rattalion to perform maintenance on their tracked vehicles. CURRENT SITUATION: Building 68 is not large enough for these two battalions to maintain the 218 vehicles assigned to each hattalion. Additional space for maintenance, storage, administration and mechanical systems (exhaust and compressed air) is required. TMPACT IF NOT PROVIDED: Existing facilities will continue in use C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE N/A ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM 10. DESCRIPTION OF PROPOSED CONSTRUCTION Consolidate an existing heating plant, to include installing an automatic coal-fired boiler, distribution lines, coal bunkers, water treatment system, and supporting facilities. Five existing plants will be removed. New boiler will have a capacity of 23 Mega BTU. 11. REQUIREMENT: 68 MB Adequate: None Substandard: 77 MB PROJECT: Consolidate an existing heating plant. REQUIREMENT: This project is required to consolidate the existing heating systems at Rivers Barracks to reduce the high energy consumption and labor intensive existing plants. The automatic coal-fired plant will reduce annual energy consumption by 8,670 MBTU per year and result in the elimination of three existing oil-fired plants and two coal-fired plants. CURRENT SITUATION: The existing manually operated plants are inefficient and labor intensive. IMPACT IF NOT PROVIDED: The existing plants will remain in use resulting in increasing labor and energy costs. NATO INFRASTRUCTURE CATEGORY: This project is not within an established NATO Infrastructure Category (including the Reinforcement Support Category) for common funding, nor is it expected to become eligible. |