B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 13.3 ($000 F. (month and year) EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM 10. DESCRIPTION OF PROPOSED CONSTRUCTION !pgrade the electrical power distribution systems at various locations of the 2nd Infantry Division by installing new feeder lines, sectionalizers, reclosers, and switches, voltage regulators, transformers, primary and secondary distribution lines and metering devices. Ralance primary feeder loadings. Upgrade the electrical distribution systems at various locations of the Combined Field Army from 5.7 KVA with an 11.4/6.6 RV system 11. REQUIREMENT: PROJECT: Upgrading of electrical distribution system in various locations. REQUIREMENT: This project is required to provide adequate and reliable power systems for existing and planned facilities at Camps Hovey, Castle, Nimble, H220, Howze, Edwards, Stanton, Garry Owen, Giant, Pelham, Stanley, Essayons, Falling Water, Sears and Kyle. The CURRENT SITUATION: The existing 5,700 volt electric systems at these Army installations are low when compared to the minimum of 12,500volts in State-side Army installations. The voltages at installations included in this project are being converted to 11,400 volts. Electric line conductors are small and are being replaced with larger sizes. existing conductors are operating at their maximum capacity and cannot accept additional loads. Sectionalizers, reclosures, switches, voltage regulars, transformers and meters are old and obsolete and most of these facilities do not fit the proposed voltage system. The increase in FORM DRPE 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO 232 voltage and conductor sizes along with the replacement of old and obsolete electrical facilities will reduce voltage losses, improve facility operations and provide a more modern electrical system. IMPACT IF NOT PROVIDED The existing electrical distribution system will continue to be used, and the operating and maintenance problems will increase. The functioning capabilities of the Army, along with the morale of the troops will be reduced. MAY 90-267 0-82-32 B. C. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 146 ($000 0 (PEOPLE) 4.718 5.550 ($000 25 May 81 35 100 Aug 82 No X 217 ....... ...... 72 .......... 289 231 58 Apr 83 F. 4. (month and year) EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM 10. DESCRIPTION OF PROPOSED CONSTRUCTION Develop deep water wells with pumps. Construct water tanks, treatment facilities, distribution lines, fire hydrants and utilities. 11. REQUIREMENT: 7 EA Adequate: None Substandard: 7 EA PROJECT: Construction of a water supply and distribution system. REQUIREMENT: This project is required to provide water for personnel and fire protection at Camps Jackson, Falling Water, Kyle, Sears, LaGuardia, Stanton and Edward. CURRENT SITUATION: An adequate water supply is not available at these camps. Water is drawn from adjacent rivers and streams. During the dry season, there is insufficient flow to provide for the needs of the installations, The water is highly contaminated and requires extensive treatment. The existing distribution systems are badly corroded resulting in wasted water when proper pressure is maintained and infiltration of untreated ground water when the pressure is low. The water supply and distribution system is unable to provide for proper fire protection. IMPACT IF NOT PROVIDED: The existing water system will continue in use; unable to provide the required water for personnel use or fire protection. |