Page images
PDF
EPUB
[blocks in formation]

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY................................

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.....

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

103.5 ($000)

50 (PEOPLE)

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F.

(month and year)

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM
OTHER APPROPRIATIONS:

Equipment Nomenclature

Procuring
Appropriation

FY of Appropriation
Or Requested

Cost ($000)

[blocks in formation]

10. MISSION OR MAJOR FUNCTIONS: Provides facilities and support for the Army Aviation Center and School whose mission is to provide individual pilot training for all fixed wing and rotary wing aircraft and advanced doctrines and technique.

MAY

[blocks in formation]

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

8,135

Permanent Facilities
Temporary Facilities

B. Similar Unused Space:

Real Property Categories

Quantity/Unit of
Measure

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]
[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION Construction of a 792 enlisted personnel barracks to include billet rooms, dayrooms, laundry rooms, latrines, communications, utilities, and parking. Twenty-four buildings totaling 97,088 SF will be demolished as a result of this project. sited in a flood plain. Heating from a central heat plant. Air Conditioning

384 Tons

Not

Substandard: 3,003 PN

11. REQUIREMENT: 3,149 PN Adequate: 1,747 PN PROJECT: Construct a barracks for 792 enlisted personnel. REQUIREMENT: This proiect is needed to provide adequate billets for enlisted personnel of the 41st, 43rd and 60th Companies and the 4th Rattalion. Up-to-date, adequate, on-post barracks are needed to provide centrally located facilities, to assure available billet space, and to maintain operational control for personnel who are training at Fort Rucker.

CURRENT SITUATION: Twenty-seven World War II temporary type mobilization buildings, built in 1942, are now fully occupied to house troops. These troops are in training courses on-post. The structures are bevond their economic and expected life, require continued maintenance and are highly inefficient energy-wise. Off-post housing does not offer lease flexibility for short term students, nor central locations for commuting. IMPACT IF NOT APPROVED: Use of existing structures will continue, along with the associated adverse impact on troop morale and high maintenance

costs

[blocks in formation]

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY......

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

[blocks in formation]

12,672
($000)

15,227

........

($000)

30 Sep 81 35

[blocks in formation]
[merged small][merged small][merged small][ocr errors][merged small][merged small]

F.

4.

In-house......

CONSTRUCTION START (Planned)..

Apr 83 (month and year.

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM
OTHER APPROPRIATIONS:

Equipment

Nomenclature

Procuring
Appropriation

FY of Appropriation
Or Requested

Cost ($000)

« PreviousContinue »