Page images
PDF
EPUB

2. DATE

1. COMPONENT

DEFENSE FY 1983 MILITARY CONSTRUCTION PROJECT DATA

Various 3. INSTALLATION AND LOCATION

1 JAN 82

[blocks in formation]

DD, DEC 76

13910

PREVIOUS EDITIONS MAY DE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO. 102

1. COMPONENT

2. DATE
FY 19 83 MILITARY CONSTRUCTION PROGRAM
OSD

1 Jan 82 I. INSTALLATION AND LOCATION

4. COMMAND

S. AREA CONSTA Various Locations

Office of the

COST INOEX CONUS and Overseas

Secretary of Defense.

N/A 6. PERSONNEL

PERMANENT
STUOENTS

SUPPORTED
STRENGTH:

TOTAL

[blocks in formation]
[ocr errors]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

10 DESCRIPTION OF PROPOSED CONSTRUCTION Funds are to be utilized for advance planning and preparation of Moal plans and specifications for construction requirements of the Defense Agencies and Secretary of Defease Activities lacluding, when required, land appraisals, overall engineering Lovestigations and feasibility studies.

u. REQUIREMENT

The estimated costs for projects do not laclode any amounts for reusibility studies, preliminary engineering or soal plans and specifications. The accomplishment of the planning and design effort required to develop and execute the construction program for the Defense Agencies and Secretary of Defense Activities is dependent on the provision of funds proposed by this item.

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]
« PreviousContinue »