10. Mission or Major Functions: US European Command is responsible for command and control of US Forces in support of the North Atlantic MAY (U) Modify existing underground building, approximately 20,050 sq ft, to accommodate a war headquarters for HQ US European Command (USEUCOM). Upgrade and rehabilitate support facilities and improve physical security. (U) Project - Provides for modification and upgrade of buildings, includ ing: demolition of existing temporary interior partitions and inadequate mechanical and electrical systems; install new interior partitions and flooring (raised in communications area); replace electrical system to include new back-up power, uninterrupted power supply and frequency converter; air handling and cooling system; provide electromagnetic protection and chemical, biological and radiological protection and improve fire protection systems; rehabilitate storage facility, relocated telephone equipment, install security fencing; install cable entry; and harden utility vaults. (U) Current Situation HQ USEUCOM currently occupies soft, above-ground facilities. They are malpositioned, extremely vulnerable and completely unsuitable for a wartime headquarters. (U) Impact If Not Provided If this facility is not provided HQ USEUCOM will not have a survivable facility from which to conduct its wartime mission. C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 560 ($000) 24 (PEOPLE) N/A 700 80 780 To be determined F. MAR 83 (month and year) EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM |