a. Included in following program (FY 84). b. Major planned next three years. None None Naval Air Test Center is the principal test and evaluation site for the most advanced naval aviation weapons systems known. DD. FORM 1 DEC 76 1390 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. A-16 Units are existing Wherry Housing proposed for acquisition. Units are presently two story brick and frame multiplex buildings. Following acquisition conversion and modernization to meet existing space standards will be accomplished. General nature of reconfiguration involves combining two small twobedrooms into one criteria three-bedroom unit with two full baths. Existing oil fired boiler/hot water heating system and individual window A/C units will be replaced with unit heatpump heating and cooling. Walls, roof and crawlspace to be insulated; replacement of existing windows with double glazing, insulated metal front and rear doors, and new roofs, gutters and downspouts are planned. DD, FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. A-17 Line 4: Located in St. Mary's County which is the southernmost tip of the State of Maryland. The area is rural in nature; most of the inhabitants live on farms. Line 8A(1) & (5) cols. a, b, c, d, e & f difference due to conversion of assets to accomplish proposed project. 10. SCOPE 200 $ 113,100 $ 210 $ 25,403 COST (8000) DESIGN STATUS START COMPLETE $ 25,403 Turnkey a. Included in following program (FY 84). b. None Mission or Major Functions Provide logistic and underwater training support to the DD FORM 1 DEC 76 1390 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. A-19 Family housing units will be two-story apartment flats, townhouses and duplexes (FGO units) configurations. Construction will be of reinforced concrete or unit masonry due to the projects location in the hurricane area. Interior finish includes gypsum board walls/ceilings, vinyl asbestos floors and carpeting of second floor flats. Scope includes carports, patios, privacy screening and exterior storage. Basketball, handball and tennis courts are provided in addition to tot lots for recreational support within the housing area. The use of solar energy is planned to provide 45% of the domestic hot water if cost effective. Any air and water emissions resulting from the project will meet applicable Federal standards. An Environmental Assessment is not planned due to the projects location in Cuba. A grey water system is planned for sanitary flushing. 1 DEC 78 1391 DD. FORM PREVIOUS EDITIONS MAY BE USED INTERNALLY Page No. A-20 |