Page images
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

10. Mission or Major Functions:

11,000SF 1,350

LS

330

Provide ship-to-shore tactical communi

cations, monitor transmission procedures, and research into electronic phenomena.

DD.

FORM

1 DEC 76 1390

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO. 260

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

NAVY COMPONENT

NAVAL SECURITY GROUP ACTIVITY,
EDZELL, SCOTLAND

INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

B. Similar Unused Space:

NAVAL SECURITY
GROUP COMMAND

COMMAND

($000)

Permanent Facilities
Temporary Facilities

[merged small][ocr errors]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small]

C. Outstanding Pollution and Safety (OSH) Deficiencies:

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Two-story concrete frame and masonry building addition; building alterations; raised flooring; new emergency generator in power building; air conditioning, utility connections.

SUBSTANDARD: 0 SF.

11. REQUIREMENT: 68,000 SF. ADEQUATE: 51,100 SF. PROJECT: Constructs addition to operations building. REQUIREMENT: Modernization of high-frequency systems requires increased floor space for electronic equipment; additional support equipment area. CURRENT SITUATION: Present operations building is completely utilized. space exists for new equipment and improvements.

IMPACT IF NOT PROVIDED: High-frequency systems modernization will be hampered.

No

ADDITIONAL: An economic analysis has not been prepared as there is no alternative to meet the requirement. Prefinancing under NATO procedures is not planned for this project as it is not within an established NATO infrastructure category for common funding, nor is it expected to become eligible.

[blocks in formation]
[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY......

100 ($000)

0

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

N/A

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

N/A

($000)

[blocks in formation]

F.

(month and year)

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED
FROM OTHER APPROPRIATIONS:

[blocks in formation]
[blocks in formation]

Two-story masonry building addition to match existing, fire protection system, utilities; 44 bedrooms with private bathrooms, lounges, laundry, storage, vending, mechanical equipment; demolition of one building. Grade mix: 15 E1-E4, 32 E5-E6, 23 E7-E9. Total: 70.

11. REQUIREMENT: 372 PN. ADEQUATE: 273 PN. SUBSTANDARD: 0 PN. PROJECT: Provides adequate billeting for 70 unaccompanied enlisted personnel.

REQUIREMENT: Adequate housing for unaccompanied enlisted personnl. CURRENT SITUATION: A deficiency of 99 adequate billeting spaces causes overcrowding with some personnel having only about half the space needed for adequate billeting. Many personnel are required to live in substandard facilities because of insufficient adequate billeting on station or ashore. IMPACT IF NOT PROVIDED: Degrade safety, productivity, morale, health of personnel, and Navy's career retention efforts.

ADDITIONAL: An economic analysis has not been prepared as there is no feasible alternatives to satisfy the requirement. Prefinancing under NATO procedures is not planned for this project as it is not within an established NATO infrastructure category for common funding nor is it expected to become eligible.

FORM

DD1 DEC 76 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO. 262

« PreviousContinue »