Page images
PDF
EPUB

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

NAVY COMPONENT

NAVAL WEAPONS STATION,

CHARLESTON, SOUTH CAROLINA
INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

CHIEF OF NAVAL

MATERIAL
COMMAND

($000)

B. Similar Unused Space:

Real Property Categories

1,685

[blocks in formation]
[blocks in formation]
[merged small][merged small][merged small][ocr errors]

C. Outstanding Pollution and Safety (OSH) Deficiencies:

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Masonry building on concrete floor and grade beams on piling adjoining Pier "C"; two steam boilers with piping and appurtenances; fuel oil storage, utility connections.

ADEQUATE : 0 MB.

SUBSTANDARD: 0 MB.

11. REQUIREMENT: 28 MB. PROJECT: Provides steam plant. REQUIREMENT: Adequate source of shore steam service for homeported submarine tender at Pier "C" which will be berthed in a "cold iron" situation. Provision of steam from shore is more economical and has the added advantage of allowing shipboard equipment shutdown for maintenance and repair.

CURRENT SITUATION: Pier "C", which is actually a stern mooring platform with access trestle, does not have shore steam service. The normal method for providing service is to operate ship's boilers. However, the tender has a large boiler which is difficult and uneconomical to operate for the relatively small amount of steam required. The tender does not have a small auxiliary boiler. A mobile steam plant will be used on a temporary basis. However, this mobile plant is intended for short-term requirements under emergency conditions until normal sources are restored or provided. IMPACT IF NOT PROVIDED: Continue to use mobile steam plant or tender's uneconomical boilers.

ADDITIONAL: An economic analysis has been prepared comparing the requested project with operation of the tender's boilers. The payback period is one year.

FORM

DD1 DEC 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO 180

[blocks in formation]

NAVAL WEAPONS STATION, CHARLESTON, SOUTH CAROLINA 4. PROJECT TITLE

5. PROJECT NUMBER

STEAM PLANT

P-185

SUPPLEMENTAL DATA

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.....

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

730 ($000)

5

(PEOPLE)

N/A

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

N/A ($000)

[blocks in formation]
[blocks in formation]

10. Mission or Major Functions: Perform a complete range of depot level rework operations on designated weapon systems, accessories, and equipment; provide engineering service in development of changes in hardware design; furnish technical services on aircraft maintenance and logistics problems; perform, upon specific request or assignement, other aircraft maintenance.

[blocks in formation]
[blocks in formation]

A.

Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

3,180

[blocks in formation]

C. Outstanding Pollution and Safety (OSH) Deficiencies:

[blocks in formation]
« PreviousContinue »