A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

[blocks in formation]

($000)

210

[merged small][merged small][merged small][ocr errors][merged small]

Real Property Categories

Measure

[blocks in formation]

C. Outstanding Pollution and Safety (OSH) Deficiencies:

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

One-story building, concrete foundation and floor, precast concrete tilt-up wall panels, built-up roof on steel decking, fire protection system, air conditioning, utilities; demolition of one structure.

11.

REQUIREMENT: 103,700 SF. ADEQUATE: 84,700 SF. SUBSTANDARD: 0 SF. PROJECT: Provides an aircraft maintenance training building. REQUIREMENT: Additional training spaces are required for teaching maintenance of new avionics systems and acoustic processors used on-board the P-3 anti-submarine patrol aircraft.

CURRENT SITUATION: New training devices are being procured for the P-3 avionics systems, including on-board acoustic processors. There are no existing spaces to house this trainer. New turbo-prop engine maintenance trainers are also being purchased and will be installed in the existing maintenance training building to facilitate training. The ordnance system trainers now there will be relocated.

IMPACT IF NOT PROVIDED: Quality of maintenance training will suffer; trainer will be stored pending provision of satisfactory facilities. ADDITIONAL: An economic analysis has not been prepared as there is no alternative to satisfy the deficiency and meet the training requirement.

[blocks in formation]
[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY......

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

[blocks in formation]

45

($000)

0

(PEOPLE)

N/A ($000)

N/A ($000)

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][subsumed][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][subsumed][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Reinforced concrete frame building, concrete foundations and floor, masonry walls, built-up roof, fire protection system, utilities; 132 bedrooms with private bathrooms, lounges, laundry, storage, vending, mechanical equipment Grade mix: 396 E1-E4. Total: 396. (NAVY*)

11. REQUIREMENT: 2,360 PN.

ADEQUATE : 1,317 PN. SUBSTANDARD: 0 PN.

PROJECT: Provides adequate billeting for 396 unaccompanied enlisted personnel.

REQUIREMENT: Adequate housing for unaccompanied enlisted personnel. CURRENT SITUATION: A deficiency of 1,043 adequate billeting spaces causes overcrowding with some personnel having only about half the space needed for adequate billeting. Many personnel are required to live in substandard facilities because of insufficient adequate billeting on station or ashore. IMPACT IF NOT PROVIDED: Degrade safety, training, morale, health of personnel, and Navy's career retention efforts.

ADDITIONAL: An economic analysis has not been prepared as there is no alternative to satisfy the deficiency. The surrounding community has insufficient housing and cannot satisfy the station's berthing requirement.

* Navy portion only. Air Force has companion project.

DD.

FORM 1 DEC 76

1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO. 138

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

0

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

N/A

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT......

N/A ($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F.

4.

CONSTRUCTION START.

(month and year)

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED
FROM OTHER APPROPRIATIONS:

[blocks in formation]