CHAP. XVII.]

PILE-DRIVING BY STEAM.

435

velocity being in excess and the mass deficient, and calculated, like the momentum of a cannon-ball, rather for destructive than impulsive action. In the case of the steam pile-driver, on the contrary, the whole weight of a heavy mass is delivered rapidly upon a driving-block of several tons weight placed directly over the head of the pile, the weight never ceasing, and the blows being repeated at the rate of a blow a second, until the pile is driven home. It is a curious fact, that the rapid strokes of the steamhammer evolved so much heat, that on many occasions the pilehead burst into flame during the process of driving. The elastic force of steam is the power that lifts the ram, the escape permitting its entire force to fall upon the head of the driving-block; while the steam above the piston on the upper part of the cylinder, acting as a buffer or recoil-spring, materially enhances the effect of the downward blow. As soon as one pile was driven, the traveler, hovering overhead, presented another, and down it went into the solid bed of the river with almost as much ease as a lady sticks pins into a cushion. By the aid of this formidable machine, what before was among the most costly and tedious of engineering operations was rendered simple, easy, and economical.

When the piles had been driven and the coffer-dams formed and puddled, the water within the inclosed spaces was pumped out by the aid of powerful engines, so as to lay bare the bed of the river. Considerable difficulty was experienced in getting in the foundations of the middle pier, in consequence of the water forcing itself through the quicksand beneath as fast as it was removed. This fruitless labor went on for months, and many expedients were tried. Chalk was thrown in in large quantities outside the piling, but without effect. Cement concrete was at last put within the coffer-dam until it set, and the bottom was then found to be secure. A bed of concrete was laid up to the level of the heads of the piles, the foundation course of stone blocks being commenced about two feet below low water, and the building proceeded without farther difficulty. It may serve to give an idea of the magnitude of the work when we state that 400,000 cubic feet of ashlar, rubble, and concrete were worked up in the piers, and 450,000 cubic feet in the land-arches and approaches.

The most novel feature of the structure is the use of cast and wrought iron in forming the double bridge, which admirably com

EE

bines the two principles of the arch and suspension, the railway being carried over the back of the ribbed arches in the usual manner, while the carriage-road and footpaths, forming a long gallery or aisle, are suspended from these arches by wrought-iron vertical rods, with horizontal tie-bars to resist the thrust. The suspension-bolts are inclosed within spandril pillars of cast iron, which give great stiffness to the superstructure. This system of longitudinal and vertical bracing has been much admired, for it not only accomplishes the primary object of securing rigidity in the roadway, but at the same time, by its graceful arrangement, heightens the beauty of the structure. The arches consist of four main ribs, disposed in pairs, with a clear distance between the two inner arches of 20 feet 4 inches, forming the carriage-road, while between each of the inner and outer ribs there is a space of 6 feet 2 inches, constituting the footpaths. Each arch is cast in five separate lengths or segments, strongly bolted together. The ribs spring from horizontal plates of cast iron, bedded and secured on the stone piers. All the abutting joints were carefully executed by machinery, the fitting being of the most perfect kind. In order to provide for the expansion and contraction of the iron arching, and to preserve the equilibrium of the piers without disturbance or racking of the other parts of the bridge, it was arranged that the ribs of every two adjoining arches resting on the same pier should be secured to the springing-plates by keys and joggles; while on the next piers, on either side, the ribs remained free, and were at liberty to expand or contract according to tem

[graphic]
[ocr errors]

HIGH-LEVEL BRIDGE-ELEVATION OF ONE ARCH.

[graphic]
[ocr errors]

PLAN OF ONE ARCH.

CHAP. XVII.] THE "LAST ACT OF THE UNION."

437

perature-a space being left for the purpose. Hence each arch is complete and independent in itself, the piers having simply to sustain their vertical pressure. The arches are six in number, of 125 feet span each, the two approaches to the bridge being formed of cast-iron pillars and bearers in keeping with the arches.

The result is a bridge that for massive solidity may be pronounced unrivaled. It is one of the most magnificent and striking of the bridges to which railways have given birth, and has been worthily styled "the King of railway structures." It is a monument of the highest engineering skill of our time, with the impress of power grandly stamped upon it. It will also be observed from the drawing placed as the frontispiece to this Life, that the High-Level Bridge forms a very fine object in a picture of great interest, full of striking architectural variety and beauty. The bridge was opened on the 15th of August, 1849. A few days after, the royal train passed over it, halting for a few minutes to enable her majesty to survey the wonderful scene below. In the course of the following year the queen opened the extensive stone viaduct across the Tweed above described, by which the last link was completed of the continuous line of railway between London and Edinburg. Over the entrance to the Berwick station, occupying the site of the once redoubtable Border fortress, so often the deadly battle-ground of the ancient Scots and English, was erected an arch under which the royal train passed, bearing in large letters of gold the appropriate words, “The last act of the Union."

The warders at Berwick no longer look out from the castle walls to descry the glitter of Southron spears. The bell-tower, from which the alarm was sounded of old, though still standing, is deserted; the only bell heard within the precincts of the old castle being the railway porter's bell announcing the arrival and departure of trains. You see the Scotch Express pass along the bridge and speed southward on the wings of steam. But no alarm spreads along the Border now. Northumbrian beeves are safe. Chevy Chase and Otterburn are quiet sheep-pastures. The only men-at-arms on the battlements of Alnwick Castle are of stone. Bamborough Castle has become an asylum for shipwrecked mariners, and the Norman Keep at Newcastle has been converted into a Museum of Antiquities. The railway has indeed consummated the Union.

CHAPTER XVIII.

CHESTER AND HOLYHEAD RAILWAY-MENAI AND CONWAY BRIDGES.

We have now to describe briefly another great undertaking, begun by George Stephenson, and taken up and completed by his son, in the course of which the latter carried out some of his greatest works-we mean the Chester and Holyhead Railway, completing the railway connection with Dublin, as the Newcastle and Berwick line completed the connection with Edinburg. It will thus be seen how closely Telford was followed by the Stephensons in perfecting the highways of their respective epochs; the former by means of turnpike roads, and the latter by means of railways.

George Stephenson surveyed a line from Chester to Holyhead in 1838, and at the same time reported on the line through North Wales to Port Dynallen, as proposed by the Irish Railway Commissioners. His advice was strongly in favor of adopting the line to Holyhead, as less costly and presenting better gradients. A public meeting was held at Chester in January, 1839, in support of the latter measure, at which he was present to give explanations. Mr. Uniacke, the mayor, in opening the proceedings, observed that it clearly appeared that the rival line through Shrewsbury was quite impracticable. Mr. Stephenson, he added, was present in the room, ready to answer any questions which might be put to him on the subject; and "it would be better that he should be asked questions than required to make a speech; for, though a very good engineer, he was a bad speaker."

One of the questions then put to Mr. Stephenson related to the mode by which he proposed to haul the passenger-carriages over the Menai Suspension Bridge by horse-power; and he was asked whether he knew the pressure the bridge was capable of sustaining. His answer was that "he had not yet made any calculations, but he proposed getting data which would enable him to arrive at an accurate calculation of the actual strain upon the bridge during the late gale. He had, however, no hesitation in

[ocr errors]

CHAP. XVIII.]

MENAI SUSPENSION BRIDGE.

439

saying that it was more than twenty times as much as the strain of a train of carriages and a locomotive engine. The only reason why he proposed to convey the carriages over by horses was in order that he might, by distributing the weight, not increase the wavy motion. All the train would be on at once, but distributed. This he thought better than passing them linked together, by a locomotive engine." It will thus be observed that the practicability of throwing a rigid railroad bridge across the Straits had not yet been completed.

The Dublin Chamber of Commerce passed resolutions in favor of Stephenson's line after hearing his explanations of its essential features. The project, after undergoing much discussion, was at length embodied in an act passed in 1844, and the work was brought to a successful completion by his son, with several important modifications, including the grand original feature of the tubular bridges across the Menai Straits and the estuary of the Conway. Excepting these great works, the construction of this line presented no unusual features, though the remarkable terrace cut for the accommodation of the railway under the steep slope of Penmaen Mawr is worthy of a passing notice.

About midway between Conway and Bangor, Penmaen Mawr forms a bold and almost precipitous headland, at the base of which, in rough weather, the ocean dashes with great fury. There was not space enough between the mountain and the strand for the passage of the railway; hence in some places the rock had to be blasted to form a terrace, and in others sea walls had to be built up to the proper level, on which to form an embankment of sufficient width to enable the road to be laid. A tunnel of 10% chains in length was cut through the headland itself; and on its east and west sides the line was formed by a terrace cut out of the cliff, and by embankments protected by sea walls, the terrace being three times interrupted by embankments in its course of about a mile and a quarter. The road lies so close under the steep mountain face that it was even found necessary at certain places to protect it against possible accidents from falling stones, by means of a covered way. The terrace on the east side of the headland was, however, in some measure, protected against the roll of the sea by the mass of stone run out from the tunnel, which formed a deep shingle-bank in front of the wall.