the State health authority, charged with responsibility for enforcing State laws relating to the abatement of water pollution, it means such other State agency;

or

(2) For air pollution control facilities, the air pollution control agency designated pursuant to section 302(b)(1) of the Act; or

(3) For both air and water pollution control facilities, any interstate agency authorized to act in place of the certifying agency of a State.

(c) "Applicant" means any person who files an application with the Administrator for certification that a facility is in compliance with the applicable regulations of Federal agencies and in furtherance of the general policies of the United States for cooperation with the States in the prevention and abatement of water or air pollution under the Act. (d) "Administrator" means the Administrator, Environmental Protection Agency.

(e) "Regional Administrator" means the Regional designee appointed by the Administrator to certify facilities under this part.

(f) "Facility" means property comprising any new identifiable treatment facility which removes, alters, disposes of or stores pollutants, contaminants, wastes, or heat.

(g) "State" means the States, the District of Columbia, the Commonwealth of Puerto Rico, the Canal Zone, Guam, American Samoa, the Virgin Islands, and the Trust Territory of the Pacific Islands. § 20.3

General provisions.

(a) An applicant shall file an application in accordance with this part for each separate facility for which certification is sought; Provided, That one application shall suffice in the case of substantially identical facilities which the applicant has installed or plans to install in connection with substantially identical properties; Provided further, That an application may incorporate by reference material contained in an application previously submitted by the applicant under this part and pertaining to substantially identical facilities.

(b) The applicant shall, at the time of application to the State certifying authority, submit an application in the form prescribed by the Administrator to the Regional Administrator for the region in which the facility is located.

(c) Applications will be considered complete and will be processed when the Regional Administrator receives the completed State certification.

(d) Applications may be filed prior or subsequent to the commencement of construction, acquisition, installation, or operation of the facility.

(e) An amendment to an application shall be submitted in the same manner as the original application and shall be considered a part of the original application.

(f) If the facility is certified by the Regional Administrator, notice of certification will be issued to the Secretary of the Treasury or his delegate, and a copy of the notice shall be forwarded to the applicant and to the State certifying authority. If the facility is denied certification, the Regional Administrator will advise the applicant and State certifying authority in writing of the reasons therefor.

(g) No certification will be made by the Regional Administrator for any facility prior to the time it is placed in operation and the application, or amended application, in connection with such facility so states.

(h) An applicant may appeal any decision of the Regional Administrator which:

(1) Denies certification;

(2) Disapproves the applicant's suggested method of allocating costs pursuant to § 20.8(e); or

(3) Revokes a certification pursuant to § 20.10.

Any such appeal may be taken by filling with the Administrator within 30 days from the date of the decision of the Regional Administrator a written statement of objections to the decision appealed from. Within 60 days, the Administrator shall affirm, modify, or revoke the decision of the Regional Administrator, stating in writing his reasons therefor. § 20.4 Notice of intent to certify.

(a) On the basis of applications submitted prior to the construction, reconstruction, erection, acquisition, or operation of a facility, the Regional Administrator may notify applicants that such facility will be certified if:

(1) The Regional Administrator determines that such facility, if constructed, reconstructed, erected, acquired, installed, and operated in accordance with such application will be

in compliance with requirements identified in § 20.8; and if

(2) The application is accompanied by a statement from the State certifying authority that such facility, if constructed, reconstructed, acquired, erected, installed, and operated in accordance with such application, will be in conformity with the State program or requirements for abatement or control of water or air pollution.

(b) Notice of actions taken under this section will be given to the appropriate State certifying authority.

§ 20.5 Applications.

Applications for certification under this part shall be submitted in such manner as the Administrator may prescribe, shall be signed by the applicant or agent thereof, and shall include the following information:

(a) Name, address, and Internal Revenue Service identifying number of the applicant;

(b) Type and narrative description of the new identifiable facility for which certification is (or will be) sought, including a copy of schematic or engineering drawings, and a description of the function and operation of such facility;

(c) Address (or proposed address) of facility location;

(d) A general description of the operation in connection with which such facility is (or will be) used and a description of the specific process or processes resulting in discharges or emissions which are (or will be) controlled by the facility;

(e) If the facility is (or will be) used in connection with more than one plant or other property, one or more of which were not in operation prior to January 1, 1969, a description of the operations of the facility in respect to each plant or other property, including a reasonable allocation of the costs of the facility among the plants being serviced, and a description of the reasoning and accounting method or methods used to arrive at such allocation;

(f) Description of the effect of such facility in terms of type and quantity of pollutants, contaminants, wastes or heat, removed, altered, stored, or disposed of by such facility;

(g) If the faciilty performs a function other than removal, alteration, storage, or disposal of pollutants, contaminants, wastes or heat, a description of all functions performed by the facility, includ

ing a reasonable identification of the costs of the facility allocable to removal, alteration, storage, or disposal of pollutants, contaminants, wastes or heat, and a description of the reasoning and the accounting method or methods used to arrive at such allocation;

(h) Date when such construction, reconstruction, or erection will be completed or when such facility was (or will be) acquired;

(i) Date when such facility is placed (or is intended to be placed) in operation;

(j) Identification of the applicable State and local water or air pollution control requirements and standards, if any;

(k) Expected useful life of facility;

(1) Cost of construction, acquisition, installation, operation, and maintenance of the facility;

(m) Estimated profits reasonably expected to be derived through the recovery of wastes or otherwise in the operation of the facility over the period referred to in paragraph (a) (6) of 26 CFR 1.169-2;

for

(n) Such other information as the Administrator deems necessary certification.

§ 20.6 State certification.

The State certification shall be by the State certifying authority having jurisdiction with respect to the facility in accordance with 26 U.S.C. 169 (d) (1) (A) and (d) (2). The certification shall state that the facility described in the application has been constructed, reconstructed, erected, or acquired in conformity with the State program or requirements for abatement or control of water or air pollution. It shall be executed by an agent or officer authorized to act on behalf of the State certifying authority.

[blocks in formation]

(b) The general policy of the United States for cooperation with the States in the prevention and abatement of air pollution is to cooperate with and to assist the States and local governments in protecting and enhancing the quality of the Nation's air resources by the prevention and abatement of conditions which cause or contribute to air pollution which endangers the public health or welfare. § 20.8 Requirements for certification.

(a) Subject to § 20.9, the Regional Administrator will certify a facility if he makes the following determinations:

(1) It has been certified by the State certifying authority.

(2) It removes, alters, disposes of, or stores pollutants, contaminants, wastes or heat, which, but for the facility, would be released into the environment.

(3) The applicant is in compliance with all regulations of Federal agencies applicable to use of the facility, including conditions specified in any permit issued to the applicant under section 13 of the Rivers and Harbors Act of 1899, as amended.

(4) The facility furthers the general policies of the United States and the States in the prevention and abatement of pollution.

(5) The applicant has complied with all the other requirements of this part and has submitted all requested information.

(b) In determining whether use of a facility furthers the general policies of the United States and the States in the prevention and abatement of water pollution, the Regional Administrator shall consider whether such facility is consistent with the following, insofar as they are applicable to the waters which will be affected by the facility:

(1) All applicable water quality standards, including water quality criteria and plans of implementation and enforcement established pursuant to section 10 (c) of the Act or State laws or regulations;

(2) Recommendations issued pursuant to section 10 (e) and (f) of the Act;

(3) Water pollution control programs established pursuant to section 3 or 7 of the Act.

(c) In determining whether use of a facility furthers the general policies of the United States and the States in the prevention and abatement of air pollution, the Regional Administrator shall consider whether such facility is consist

ent with and meets the following requirements, insofar as they are applicable to the air which will be affected by the facility;

(1) Plans for the implementation, maintenance, and enforcement of ambient air quality standards adopted or promulgated pursuant to section 110 of the Act;

(2) Recommendations issued pursuant to sections 103 (e) and 115 of the Act which are applicable to facilities of the same type and located in the area to which the recommendations are directed;

(3) Local government requirements for control of air pollution, including emission standards;

(4) Standards promulgated by the Administrator pursuant to the Act.

(d) A facility which removes elements or compounds from fuels which would be released as pollutants when such fuels are burned may not be certified whether or not such facility is used in connection with the applicant's plant or property where such fuels are burned.

(e) Where a facility is used in connection with more than one plant or other property, one or more of which were not in operation prior to January 1, 1969, or where a facility will perform a function other than the removal, alteration, storage or disposal of pollutants, contaminants, wastes, or heat, the Regional Administrator will so indicate on the notice of certification and will approve or disapprove the applicant's suggested method of allocation of costs. If the Regional Administrator disapproves the applicant's suggested method, he shall identify the proportion of costs allocable to each such plant, or to the removal, alteration, storage or disposal of pollutants, contaminants, wastes, or heat.

§ 20.9 Cost recovery.

Where it appears that, by reason of estimated profits to be derived through the recovery of wastes, through separate charges for use of the facility in question, or otherwise in the operation of such facility, all or a portion of its costs may be recovered over the period referred to in paragraph (a)(6) of 26 CFR 1.169-2, the Regional Administrator shall so signify in the notice of certification. Determinations as to the meaning of the term "estimated profits" and as to the percentage of the cost of a certified facility which will be recovered over such period shall be made by the Secretary of the Treasury, or his delegate: Provided, That in no event shall estimated profits be deemed to arise from the use or reuse by the applicant of recovered waste.

§ 20.10 Revocation.

Certification hereunder may be revoked by the Regional Administrator on 30 days written notice to the applicant, served by certified mail, whenever the Regional Administrator shall determine that the facility in question is no longer being operated consistent with the § 20.8 (b) and (c) criteria in effect at the time the facility was placed in service. Within such 30-day period, the applicant may submit to the Regional Administrator such evidence, data or other written materials as the applicant may deem appropriate to show why the certification hereunder should not be revoked. Notification of a revocation under this section shall be given to the Secretary of the Treasury or his delegate. See 26 CFR 1.169-4(b) (1).

SUBCHAPTER B-GRANTS

NOTE: Previously published EPA grant regulations were revoked, 36 F.R. 22369, Nov. 25, 1971, but were maintained as uncodified regulations. Such uncodified grant regulations will continue as uncodified regulations, to the extent not inconsistent with the regulations promulgated pending publication of appropriate additional final or interim regulations. (See 36 F.R. 22716-22728, Nov. 27, 1971)