Page images
PDF
EPUB

before a final determination on the violation is made by OFE. OFE may, in its discretion, also provide the violator an opportunity for a hearing pursuant to § 501.166(a)(1).

(c) Service. OFE will serve the notice of violation in accordance with provisions set forth in § 501.6.

(d) Rescission. If, after issuance of a notice of violation and any related investigation, OFE finds no basis for the belief that a violation has occurred, is continuing to occur, or is about to occur, OFE may rescind the notice of violation by giving written notice to that effect to the recipient.

§ 501.166 Hearings and conferences.

(a) When a civil penalty is proposed. (1) Hearing alternative in civil penalty assessment proceedings. Unless the recipient of a notice of violation elects in writing to have the provisions of paragraph (a)(2) of this section apply, OFE will commence a proceeding to assess a penalty and, prior to a final determination on the violation and assessment of a penalty, provide an opportunity for a hearing pursuant to 5 U.S.C. 554 before an Administrative Law Judge.

(2) Election alternative in civil penalty assessment proceedings. The recipient of a notice of violation in which a civil penalty assessment has been proposed may elect, in writing, within thirty (30) days of receipt of the notice, to waive the administrative proceedings described in paragraph (a)(1) of this section. OFE will make a determination on the proposed civil penalty assessment and issue a final order to that effect within forty-five (45) days after receiving notice of the exercise of this election.

(b) When a civil penalty is not proposed-opportunity to request a conference. If a person has received a notice of violation in which a civil penalty has not been proposed, he may, within thirty (30) days after receipt of the notice, request a conference with OFE to discuss the notice. In order to request a conference he must comply with the instructions set forth in the notice.

§ 501.167 Fuel use order.

(a) General. OFE will issue a Fuel Use Order if, after considering all the information received during the proceeding, OFE determines that a person has committed, is committing, or is about to commit a violation of FUA or of an order or rule thereunder.

(b) Contents. Any Fuel Use Order issued under this section shall set forth the relevant facts and legal basis for the order and where appropriate, the final penalty assessment and the basis therefor. When an administrative hearing is requested under

§ 501.166(a) of this part, the Fuel Use Order will include the recommended findings and conclusions of the Administrative Law Judge (ALJ) and the basis for the penalty assessment. OFE will make a final determination as to any penalty assessment or other appropriate remedy based upon the recommended findings and conclusions of the ALJ and other information in the record of the enforcement proceeding. The order will be effective upon service, unless otherwise provided therein, or stayed pursuant to § 501.120.

(c) Service. OFE will serve a copy of the Fuel Use Order upon any person who was served a copy of the notice of violation and upon all parties to any public proceeding on the notice of violation. OFE will place a copy of each final order on file in the Public Information Office described in § 501.12.

(d) Judicial review. Any person against whom a penalty is assessed pursuant to § 501.167(b) after a hearing before an ALJ may, within sixty (60) calendar days after the date of issuance of the order assessing such penalty, institute an action in the United States Court of Appeals for the appropriate judicial circuit for judicial review of such order in accordance with the provisions of Section 723 of FUA.

Subpart L-Investigations, Violations, Sanctions and Judicial Actions

§ 501.180 Investigations.

(a) General. Pursuant to Section 711 of FUA, the DEOA, and in accordance with the provisions of 10 CFR 205.201, OFE may initiate and conduct investi

gations relating to the scope, nature, and extent of compliance by any person with the rules, regulations, and orders issued by OFE under the authority of the Act, or any order or decree of court relating thereto, or any other agency action. When the circumstances warrant, OFE may issue subpoenas as provided in Subpart D of this part. OFE may also conduct investigative conferences in conjunction with any investigation.

(b) Any duly authorized representative of OFE has the authority to conduct an investigation and to take such action as he deems necessary and appropriate to the conduct of the investigation.

(c) Notification. If any person is required to furnish information or documentary evidence pursuant to a subpoena or special report order, OFE will, upon written request, inform that person as to the general purposes of the investigation.

(d) Confidentiality. OFE shall not disclose any information received during an investigation under this section, including the identities of the person investigated and any other person who provides information, to the extent it is exempt from public disclosure pursuant to 5 U.S.C. 552 and 10 CFR Part 1004.

[blocks in formation]

(a) General. (1) A violation of any provision of the Act (other than section 402 of FUA), or any rule or order thereunder shall be subject to the penalties and sanctions provided in Subtitle C of Title VII of FUA.

(2) Each day that any provision of the Act (other than section 402), or any rule or order thereunder is violated constitutes a separate violation within the meaning of the provisions of this section relating to civil penalties.

(b) Criminal penalties. Any person who willfully violates any provision of the Act (other than section 402), or any rule or order thereunder will be subject to a fine of not more than $50,000, or to imprisonment for not more than 1 year, or both, for each violation.

(c) Civil penalties. (1) Any person who violates any provisions of the Act

(other than section 402) or any rule or order thereunder will be subject to the following civil penalty, which may not exceed $25,000 for each violation: Any person who operates a powerplant or major fuel burning installation under an exemption, during any 12-calendarmonth period, in excess of that authorized in such exemption will be assessed a civil penalty of up to $3 for each MCF of natural gas or up to $10 for each barrel of oil used in excess of that authorized in the exemption.

(2) OFE may compromise and settle, and collect civil penalties whenever it considers it to be appropriate or advisable.

(d) Corporate personnel. (1) If a director, officer, or agent of a corporation willfully authorizes, orders, or performs any act or practice constituting in whole or in part a violation of the Act, or any rule or order thereunder, he will be subject to the penalties specified in paragraphs (b) and (c) of this section without regard to any penalties to which the corporation may be subject. He will not, however, be subject to imprisonment under paragraph (b) of this section unless he knew of noncompliance by the corporation, or had received from OFE notice of noncompliance by the corporation.

(2) Purposes of this paragraph:

(i) "Agent" includes any employee or other person acting on behalf of the corporation on either a temporary or permanent basis; and

(ii) "Notice of noncompliance" is a final Fuel Use Order issued under § 501.167 of this part.

§ 501.182 Injunctions.

Whenever it appears to OFE that any person has committed, is committing, or is about to commit a violation of any provision of the Act, or any rule or order thereunder, OFE may, in accordance with section 724 of FUA, bring a civil action in the appropriate United States District Court to enjoin such acts or practices. The relief sought may include a mandatory injunction commanding any person to comply with any provision of such provision, order or rule, the violation of which is prohibited by section 724 of

FUA and may also include interim equitable relief.

§ 501.183 Citizen suits.

(a) General. A person who believes he is aggrieved by the failure of OFE to perform any nondiscretionary act of duty under the Act may file a Petition for Action for OFE to take such action as he may feel to be proper. This petition must be filed at the address provided in § 501.11. The petition must specify the action requested and set forth the facts and legal arguments that constitute the basis for the request. The filing of a Petition for Action will serve as notice to OFE under FUA section 725(b) for purposes of any citizens suit that may be subsequently filed.

(b) OFE decision. Within sixty (60) days of receiving the Petition for Action, OFE will notify the person giving notice under this section that it has instituted the action requested or that other described action is being taken, or that other described action is being taken, or that no action is being taken and the reasons therefor.

Subpart M-Use of Natural Gas or Petroleum for Emergency and Unanticipated Equipment Outage Purposes

§ 501.190 Purpose and scope.

(a) If a person operates a powerplant covered by any of the prohibitions of Titles II, III, or IV of FUA, § 501.191 of this subpart establishes procedures to be followed for the use of minimum amounts of natural gas or petroleum under FUA section 103(a)(15)(B) in order to alleviate or prevent unanticipated equipment outages and emergencies directly affecting the public health, safety, or welfare that would result from electric power outages.

(b) Explanatory note: If a person operates a rental boiler as a powerplant covered by any of the prohibitions of Titles II, III, or IV of FUA, he may be able to use the provisions of this subpart for the emergency use of natural gas or petroleum.

[54 FR 52893, Dec. 22, 1989]

§ 501.191 Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies defined in section 103(a)(15)(B) of the act.

(a) In the event of the occurrence or imminent occurrence of an emergency, or of the occurrence or imminent occurrence of an unanticipated equipment outage in the unit, an owner or operator of a powerplant is automatically permitted to use minimum amounts of natural gas or petroleum in the unit or in a substitute unit to prevent or alleviate the outage or to prevent or alleviate the emergency if he complies with procedures contained in paragraph (b) of this section.

(b) If the use of minimum amounts of petroleum or natural gas is required for purposes specified in this section, the owner or operator must notify OFE of such use by telegram or telephone within 24 hours after the commencement of such use. Immediately thereafter a written confirmation must be submitted to OFE, describing, to the best estimate of the owner or operator, (1) the nature of the emergency and (2) how long petroleum or natural gas use is likely to be required. (c) For purposes of this section only: (1) An “emergency" is the occurrence or threat of imminent occurrence of a condition which results or would result from an electric power outage and directly effects or would directly effect the public health, safety or welfare;

equipment

(2) “Unanticipated outage" shall mean an unexpected outage due to equipment failure.

(3) "Minimum amounts required to alleviate or prevent" shall mean:

(i) For powerplants, the amounts of natural gas or petroleum required to prevent curtailment of electric supply where the operating utility has, to the maximum extent possible, utilized alternate fuel-fired capacity to prevent such curtailment. Note-A utility operating hydroelectric facilities may take into account seasonal fluctuations in storage capacity and shall be permitted to prevent depletion of stored power-producing capacity as deemed necessary by the utility; and

(ii) For installations, the amounts of natural gas or petroleum required to

[merged small][merged small][ocr errors]

where COST (ALTERNATE) and COST(OIL) are determined by:

[blocks in formation]

(4) The terms in Equations 2 and 3 are defined as follows:

i=Year. i is a specified year either before year 0 or after year 0. Year 0 is the year before the unit becomes operational. For example, in the third year before the unit becomes operational, i would equal -2, and in the third year following commencement of operations of the unit, i would equal +3. Years are represented by 52 week periods prior to or following the date on which the unit becomes operational. Outlays before the unit becomes operational are future valued to the year before the unit becomes operational (year 0), and outlays after the unit becomes operational are present valued to the year before the unit becomes operational. Year 0 must be the same for the units being compared.

g=The number of years prior to the year

before the unit becomes operational (year 0) that (1) a cash outlay is first made for capital investments, or (2) an investment tax credit is first usedwhichever occurs first. N=The useful life of the unit (see paragraph (d)(5) of this section). I=Yearly cash outlay (in dollars) from the year outlays first occur to the last year of the unit's useful life for capital investments. (See paragraph (d)(2) of this section for the items that must be included.)

IX

I¡-ITC¡-S¡ ̄t¡(DPR¡) (1)

(1+k) i

IX

OM1 = Annual cash outlay in year i (in dollars) for all operations and maintenance expenses except fuel (i.e., all non-capital and non-fuel cash outlays caused by putting the capital investments (I) into service). This may include labor, materials, insurance, taxes (except income taxes), etc. (See paragraph (d)(3) of this section.)

S=Salvage value of capital investment (in dollars) in year i.

FL Annual cash outlay for delivered fuel expenses (in dollars) in year i. (See paragraph (d)(3) of this section for FL, calculation instructions and Appendix II of these regulations for the procedures to determine fuel price.)

k=The discount rate expressed as a fraction (see paragraph (d)(4) of this section). ITC, Federal investment tax credit used in year i resulting from capital investments (see paragraph (d)(6) of this section). DPR1 = Depreciation in year i resulting from capital investments (see paragraph (d)(6) of this section). t1=Marginal income tax rate in year i (see paragraph (d)(6) of this section).

IX1 = Inflation index value for year i (see Appendix II to Part 504 for method of computation).

IX.=Inflation index value for the year e, the year before the asset is placed in service.

(5) The step-by-step procedure that follows shows the comparison that the petitioner must make.

(i) Compute the cost of using an alternate fuel (COST(ALTERNATE)) unit throughout the useful life of the unit using Equations 2 and 3.

(ii) Compute the cost of using oil or natural gas (COST(OIL)) throughout the useful life of the unit using Equations 2 and 3.

(iii) Using Equation 1, compute the difference (DELTA) between COST (ALTERNATE) and COST (OIL). If the difference (DELTA) is less than or equal to zero, a petitioner is not eligible for a permanent or temporary exemption using the general cost test and need not complete the remainder of the general cost test calculation. However, he still may be eligible for a temporary exemption using the special cost test (paragraph (c) of this section). If the difference (DELTA) is greater than zero and if the best practicable cost estimates will not materially change during the first ten years of operation (given the best information available at the time the petition is filed), the petitioner has completed the test and is eligible for a permanent exemption. However, if the best practicable cost estimate will materially change during the first ten years, the petitioner must complete the remainder of the general cost test-the delayed use calculations which follow.

(iv) Recompute COST (ALTERNATE) with Equations 2 and 3, assuming that an alternate fuel is not used as the primary energy source until the start of the second year of operation and that imported petroleum or natural gas is used for the first year of operation. All cash outlays should reflect postponed use of alternate fuel.

(v) Successively recompute COST (ALTERNATE) with Equations 2 and 3, assuming that the alternate fuel use is postponed until the start of the third year, fourth year, and so on, through the beginning of the eleventh

year of operation (with imported petroleum or natural gas used in the years preceding alternate fuel use). (vi) Compute the difference (DELTA) between each of the ten COST(ALTERNATE)s calculated in paragraph (b)(5) (iv) and (v) of this section and the COST(OIL) calculated in paragraph (b)(5)(ii) of this section.

(vii) If all the DELTAS computed in paragraph (b)(5) (iii) and (vi) of this section are greater than zero, the petitioner is eligible for a permanent exemption. If one or more of the DELTAS is less than or equal to zero, he is eligible for a temporary exemption for the period beginning at the start of the first year of operation and terminating at the beginning of the first year in which a DELTA is zero or less.

(c) Cost calculations-special cost test. (1) A petitioner may be eligible for a temporary exemption if he demonstrates that the cost of using an alternate fuel will substantially exceed the cost of using imported petroleum or (natural gas) over the period of the proposed exemption. The period of the proposed temporary exemption may not exceed ten years.

The petitioner must demonstrate that the cost of using an alternate fuel substantially exceeds the cost of using imported petroleum for the first year of operation, the first two years of operation, and so forth, through the period of the proposed exemption. OFE will limit the duration of a temporary exemption to the shortest time possible.

(2) To conduct the test, calculate the difference (DELTA) between the cost of using an alternate fuel (COST (ALTERNATE)) and the cost of using imported petroleum (COST (OIL)) using Equations 4 and 5 below, Equation 3 (paragraph (b)(3) of this section), and the comparison procedures in paragraph (c)(4) of this section.

« PreviousContinue »