Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities, Volumes 1-2U.S. Government Printing Office, 1954 - Civil engineering |
From inside the book
Results 1-5 of 100
Page 6
... dams and bridges is limited to activities necessary to meet cur- rent needs of commercial navigation . The operation of locks ... lock and dam on the Yamhill River , Oreg . , was discontinued . Also , a bridge no longer used by general ...
... dams and bridges is limited to activities necessary to meet cur- rent needs of commercial navigation . The operation of locks ... lock and dam on the Yamhill River , Oreg . , was discontinued . Also , a bridge no longer used by general ...
Page 7
... locks and dams . 1 lock and dam . 2 locks and dams ( Nos . 5 and 6. ) 34 locks and other structures . 5 locks and dams . 11 locks and dams . 1 lock and dam . 1 lock and dam . 9 locks , 7 dams . 3 locks and dams . 1 lock and dam ...
... locks and dams . 1 lock and dam . 2 locks and dams ( Nos . 5 and 6. ) 34 locks and other structures . 5 locks and dams . 11 locks and dams . 1 lock and dam . 1 lock and dam . 9 locks , 7 dams . 3 locks and dams . 1 lock and dam ...
Page 308
... locks and dams and by dredging river shoals between Navassa and Fayetteville . Data regarding locks and dams are as follows : No. 1 . No. 2 . No. 3 . Lock and dam Location Distance from Wil- mington Distance Maximum above mouth ...
... locks and dams and by dredging river shoals between Navassa and Fayetteville . Data regarding locks and dams are as follows : No. 1 . No. 2 . No. 3 . Lock and dam Location Distance from Wil- mington Distance Maximum above mouth ...
Page 309
... locks and dams . The existing project was authorized by the following River and Harbor Acts : Acts Work authorized June 25 , 1910 The 8 - foot channel and construction of 2 locks and dams . July 3 , 1930 June 26 , 19341 Aug 30 , 19352 ...
... locks and dams . The existing project was authorized by the following River and Harbor Acts : Acts Work authorized June 25 , 1910 The 8 - foot channel and construction of 2 locks and dams . July 3 , 1930 June 26 , 19341 Aug 30 , 19352 ...
Page 310
United States. Army. Corps of Engineers. pleted . The construction of locks and dams 1 and 2 , and dredging of river shoals , were commenced in August 1912 and completed in July 1917. The construction of lock and dam 3 and repairs and ...
United States. Army. Corps of Engineers. pleted . The construction of locks and dams 1 and 2 , and dredging of river shoals , were commenced in August 1912 and completed in July 1917. The construction of lock and dam 3 and repairs and ...
Other editions - View all
Common terms and phrases
100 feet wide 1st sess 2d sess 30 feet 76th Congress acre-feet additional amount needed Annual Report Appropriated Arkansas River available for succeeding Bayou bridge Canal channel Chief of Engineers Condition at end Cong construction contract contributed funds Control Act approved cooperation Cost and financial Creek cubic yards district drainage dredging end of fiscal ending June 30 Estimated additional amount existing project feet deep feet long financial summary Fiscal Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor includ jetty July July 24 June 28 Lake latest published map levee Location locks and dams mean low water miles Mississippi River Missouri River mouth navigation Operations and results percent complete Port previous projects project dimensions project was authorized provides Reservoir results during fiscal River and Harbor River Basin spillway succeeding fiscal Terminal facilities thence tion total cost Total to June turning basin United wharves width
Popular passages
Page 433 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 560 - Avenue to the navigation turning basin ; all generally in accordance with the plans of the district engineer, and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Page 90 - ... feet; and for partially closing Plum Island Basin by a timber dike about 800 feet long and 5.5 feet above mean low water; the object being to create at the outer bar a permanent channel 1,000 feet wide and at least 17 feet deep at mean low water, to enable vessels of such draft as can proceed at high tide to the wharves at Newburyport to enter the river at mean low water. The mean range of tide is 7.9 feet at the bar and 7.8 feet at Newburyport.
Page 443 - Congress, 1st session, local interests are required to furnish assurances satisfactory to the Secretary of the Army that they will (a) furnish, free of cost to the United States, all lands, easements, and...
Page 375 - Key improvement is subject to the conditions that local interests give assurances satisfactory to the Secretary of War that they will provide...
Page 755 - June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Upper Mississippi River Basin described in Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 740 - ... provide necessary mooring facilities and utilities, including a public landing with suitable supply facilities...
Page 861 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 101 - ... hold and save the United States free from claims for damages resulting from the improvement.
Page 420 - Local cooperation. — This provides that local interests agree to furnish, free of cost to the United States, all lands, easements, rights-of-way, and spoil-disposal areas...