Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities, Volumes 1-2U.S. Government Printing Office, 1954 - Civil engineering |
From inside the book
Results 1-5 of 100
Page 54
... port Local terri- Lakes Total from Total Coastal Lakes tory to ports from ports Canada over- seas to Canada over- seas 1947 . ( 1 ) 766,816,730 62,162,169 57,365,892 4,773 , 223 23,054 126,093,946 101,995,508 24,054,718 43,720 ...
... port Local terri- Lakes Total from Total Coastal Lakes tory to ports from ports Canada over- seas to Canada over- seas 1947 . ( 1 ) 766,816,730 62,162,169 57,365,892 4,773 , 223 23,054 126,093,946 101,995,508 24,054,718 43,720 ...
Page 69
... Port Everglades Harbor , Fla . 2,471,191 206,976 71,380 1,669,494 138,462 5,445 238,854 951 139,629 Miami Harbor , Fla .. Key West Harbor , Fla . Footnotes at end of table . 253,040 604 652,477 64 46,103 1,986,510 10 12,093 25,699 ...
... Port Everglades Harbor , Fla . 2,471,191 206,976 71,380 1,669,494 138,462 5,445 238,854 951 139,629 Miami Harbor , Fla .. Key West Harbor , Fla . Footnotes at end of table . 253,040 604 652,477 64 46,103 1,986,510 10 12,093 25,699 ...
Page 71
... Port Arthur , Tex .. 22,309,765 14,232 1,498,209 492,969 2,197,675 13,465 182,573 17,954 Tex . ) .. 5,112,576 348,449 2,347,250 57,005 1,430,026 Freeport , Tex . 4,402,113 2,812 678,322 2,625 Port Aransas , Tex .. 10,022,693 1,319 ...
... Port Arthur , Tex .. 22,309,765 14,232 1,498,209 492,969 2,197,675 13,465 182,573 17,954 Tex . ) .. 5,112,576 348,449 2,347,250 57,005 1,430,026 Freeport , Tex . 4,402,113 2,812 678,322 2,625 Port Aransas , Tex .. 10,022,693 1,319 ...
Page 73
... Port Allen Harbor , Kauai , T. H. 132,925 5,909 675 50,296 55,063 Nawiliwili Harbor , Kauai , T. H. 395,509 11,306 2,839 45,278 293,792 1,685 378,937 311,320 1,150 71,635 76 59,433 34,034 8 34,095 161,080 53 16,382 5,147 339 30,928 ...
... Port Allen Harbor , Kauai , T. H. 132,925 5,909 675 50,296 55,063 Nawiliwili Harbor , Kauai , T. H. 395,509 11,306 2,839 45,278 293,792 1,685 378,937 311,320 1,150 71,635 76 59,433 34,034 8 34,095 161,080 53 16,382 5,147 339 30,928 ...
Page 75
... Port Wing Harbor , Wis .. 178 Cornucopia , Wis . 731 Bayfield Harbor , Wis . 3,995 Ashland Harbor , Wis .. 4,129,068 40,093 136,636 390,200 3,562,139 Ontonagon Harbor , Mich .. 50 Lac La Belle Harbor , Mich.2 . 24 Grand Traverse Bay ...
... Port Wing Harbor , Wis .. 178 Cornucopia , Wis . 731 Bayfield Harbor , Wis . 3,995 Ashland Harbor , Wis .. 4,129,068 40,093 136,636 390,200 3,562,139 Ontonagon Harbor , Mich .. 50 Lac La Belle Harbor , Mich.2 . 24 Grand Traverse Bay ...
Other editions - View all
Common terms and phrases
100 feet wide 1st sess 2d sess 30 feet 76th Congress acre-feet additional amount needed Annual Report Appropriated Arkansas River available for succeeding Bayou bridge Canal channel Chief of Engineers Condition at end Cong construction contract contributed funds Control Act approved cooperation Cost and financial Creek cubic yards district drainage dredging end of fiscal ending June 30 Estimated additional amount existing project feet deep feet long financial summary Fiscal Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor includ jetty July July 24 June 28 Lake latest published map levee Location locks and dams mean low water miles Mississippi River Missouri River mouth navigation Operations and results percent complete Port previous projects project dimensions project was authorized provides Reservoir results during fiscal River and Harbor River Basin spillway succeeding fiscal Terminal facilities thence tion total cost Total to June turning basin United wharves width
Popular passages
Page 433 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 560 - Avenue to the navigation turning basin ; all generally in accordance with the plans of the district engineer, and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Page 90 - ... feet; and for partially closing Plum Island Basin by a timber dike about 800 feet long and 5.5 feet above mean low water; the object being to create at the outer bar a permanent channel 1,000 feet wide and at least 17 feet deep at mean low water, to enable vessels of such draft as can proceed at high tide to the wharves at Newburyport to enter the river at mean low water. The mean range of tide is 7.9 feet at the bar and 7.8 feet at Newburyport.
Page 443 - Congress, 1st session, local interests are required to furnish assurances satisfactory to the Secretary of the Army that they will (a) furnish, free of cost to the United States, all lands, easements, and...
Page 375 - Key improvement is subject to the conditions that local interests give assurances satisfactory to the Secretary of War that they will provide...
Page 755 - June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Upper Mississippi River Basin described in Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 740 - ... provide necessary mooring facilities and utilities, including a public landing with suitable supply facilities...
Page 861 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 101 - ... hold and save the United States free from claims for damages resulting from the improvement.
Page 420 - Local cooperation. — This provides that local interests agree to furnish, free of cost to the United States, all lands, easements, rights-of-way, and spoil-disposal areas...