(a) The Contracting Officer may at any time, by a written order, and without notice to the sureties, if any, make changes, within the general scope of this contract, in any one or more of the following: (1) Drawings, designs, or specifications, where supplies to be furnished are to be specially manufactured for the Government in accordance therewith; (2) method of shipment or packing; and (3) place of delivery.

(b) If any such change causes an increase or decrease in the estimated cost of, or the time required for, the performance of any part of the work under this contract, whether changed or not changed by any such order, or otherwise affects any other provision of this contract, an equitable adjustment shall be made: (1) In the estimated cost or delivery schedule, or both; (2) in the amount of any fixed-fee to be paid to the contractor; and (3) in such other provisions of the contract as may be affected, and the contract shall be modified in writing accordingly. Any claim by the Contractor for adjustment under this clause must be asserted within 30 days from the date of receipt by the Contractor of the notification of change: Provided, however, That the Contracting Officer, if he decides that the facts justify such action, may receive and act upon any such claim asserted at any time prior to final payment under this contract. Failure to agree to any adjustment shall be a dispute concerning a question of fact within the meaning of the clause of this contract entitled "Disputes." However, except as provided in paragraph (c), below, nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.

(c) Notwithstanding the provisions of paragraphs (a) and (b), above, the estimated cost of this contract and, if this contract is

343

incrementally funded, the funds allotted for the performance thereof, shall not be increased or deemed to be increased except by specific written modification of the contract indicating the new contract estimated cost and, if this contract is incrementally funded, the new amount allotted to the contract. Until such modification is made, the Contractor shall not be obligated to continue performance or incur costs beyond the point established in the clause of this contract entitled "Limitation of Cost" or "Limitation or Funds."

§ 1-7.202-3 Limitation of cost or funds. (a) Insert the following clause in all fully funded cost-reimbursement type supply contracts:

LIMITATION OF COST

(a) It is estimated that the total cost to the Government for the performance of this contract, exclusive of any fee, will not exceed the estimated cost set forth in the Schedule, and the Contractor agrees to use his best efforts to perform the work specified in the Schedule and all obligations under this contract within such estimated cost. If, st any time, the Contractor has reason to believe that the costs which he expects to incur in the performance of this contract in the next succeeding 60 days, when added to all costs previously incurred, will exceed 75 percent of the estimated cost then set forth in the Schedule, or if, at any time, the Contractor has reason to believe that the total cost to the Government for the performance of this contract, exclusive of any fee, will be greater or substantially less than the then estimated cost hereof, the Contractor shall notify the Contracting Officer in writing to that effect, giving the revised estimate of such total cost for the performance of this contract.

(b) Except as required by other provisions of this contract specifically citing and stated to be an exception from this clause, the Government shall not be obligated to reimburse the Contractor for costs incurred in excess of the estimated cost set forth in the Schedule, and the Contractor shall not be obligated to continue performance under the contract (including actions under the Termination clause) or otherwise to incur costs in excess of the estimated cost set forth in the Schedule, unless and until the Contracting Officer shall have notified the Contractor in writing that such estimated cost has been increased and shall have specified in such notice a revised estimated cost which shall thereupon constitute the estimated cost of performance of this contract. No notice, communication, or representation in any other form or from any person other than the Contracting Officer shall affect the estimated cost of this contract. In the absence of the specified notice, the Government shall not be obligated to reimburse the Contractor for any costs in excess of the estimated cost set forth in the Schedule, whether those excess costs

were incurred during the course of the contract or as a result of termination. When and to the extent that the estimated cost set forth in the Schedule has been increased, any costs incurred by the Contractor in excess of the estimated cost prior to such increase shall be allowable to the same extent as ir such costs had been incurred after the increase; unless the Contracting Officer issues a termination or other notice and directs that the increase is solely for the purpose of covering termination or other specified expenses.

(c) Change orders issued pursuant to the Changes clause of this contract shall not be considered an authorization to the Contractor to exceed the estimated cost set forth in the Schedule in the absence of a statement in the change order, or other contract modification, increasing the estimated cost.

(d) In the event that this contract is terminated or the estimated cost not increased, the Government and the Contractor shall negotiate an equitable distribution of all property produced or purchased under the contract based upon the share of costs incurred by each.

(b) Insert the following clause in all cost-reimbursement type supply contracts which are to be incrementally funded:

LIMITATION OF FUNDS

(a) It is estimated that the cost to the Government for the performance of this con. tract will not exceed the estimated cost set forth in the Schedule, and the Contractor agrees to use his best efforts to perform the work specified in the Schedule and all obligations under this contract within such estimated cost.

(b) The amount presently available for payment and allotted to this contract, the items covered thereby, the period of performance which it is estimated the allotted amount will cover, are specified in the Schedule. It is contemplated that from time to time additional funds will be allotted to this contract up to the full estimated cost set forth in the Schedule, exclusive of any fee. The Contractor agrees to perform or have performed work on this contract up to the point at which the total amount paid and payable by the Government pursuant to the terms of this contract approximates but does not exceed the total amount actually allotted to the contract.

(c) If at any time the Contractor has reason to believe that the costs which he expects to incur in the performance of this contract In the next succeeding 60 days, when added to all costs previously incurred, will exceed 75 percent of the total amount then allotted to the contract, the Contractor shall notify the Contracting Officer in writing to that effect. The notice shall state the estimated amount of additional funds required to continue performance for the period set forth In the Schedule. Sixty days prior to the end

of the period specified in the Schedule the Contractor will advise the Contracting Offcer in writing as to the estimated amount of additional funds, if any, that will be required for the timely performance of the work under the contract or for such further period as may be specified in the Schedule or otherwise agreed to by the parties. If, after such notification, additional funds are not allotted by the end of the period set forth in the Schedule or an agreed date substituted therefor, the Contracting Officer will, upon written request by the Contractor, terminate this contract pursuant to the provisions of the Termination clause on such date. If the Contractor, in the exercise of his reasonable judgment, estimates that the funds available will allow him to continue to discharge his obligations hereunder for a period extending beyond such date, he shall specify the later date in his request and the Contracting Officer, in his discretion, may terminate this contract on that later date.

(d) Except as required by other provisions of this contract specifically citing and stated to be an exception from this clause, the Government shall not be obligated to reimburse the Contractor for costs incurred in excess of the total amount from time to time allotted to the contract, and the Contractor shall not be obligated to continue performance under the contract (including actions under the Termination clause) or otherwise to incur costs in excess of the amount allotted to the contract, unless and until the Contracting Officer has notified the Contractor in writing that such allotted amount has been increased and has specified in such notice an increased amount constituting the total amount then allotted to the contract. To the extent the amount allotted exceeds the estimated cost set forth in the Schedule, such estimated cost shall be correspondingly increased. No notice, communication, or representation in any other form or from any person other than the Contracting Officer shall affect the amount allotted to this contract. In the absence of the specified notice, the Government shall not be obligated to reimburse the Contractor for any costs in excess of the total amount then allotted to the contract, whether those excess costs were incurred during the course of the contract or as a result of termination. When and to the extent that the amount allotted to the contract has been increased, any costs incurred by the Contractor in excess of the amount previously allotted shall be allowable to the same extent as if such costs had been incurred after such increase in the amount allotted; unless the Contracting Officer issues a termination or other notice and directs that the increase is solely for the purpose of covering termination or other specified expenses.

(e) Change orders issued pursuant to the Changes clause of this contract shall not be considered an authorization to the Contractor to exceed the amount allotted in the Schedule in the absence of a statement in the

change order, or other contract modification, increasing the amount allotted.

(f) Nothing in this clause shall affect the right of the Government to terminate this contract. In the event this contract is terminated, the Government and the Contractor shall negotiate an equitable distribution of all property produced or purchased under the contract based upon the share of costs incurred by each.

(g) In the event that sufficient funds are not allotted to this contract to allow completion of the work contemplated by this contract, the Contractor shall be entitled to that percentage of the fee set forth in the Schedule equivalent to the percentage of completion of the work contemplated by this contract.

(c) In the foregoing clauses set forth in paragraphs (a) and (b) of this § 1-7.202-3, the period of "60 days" and the percentage of "75 percent" may be varied from 30 days to 90 days and 75 percent to 85 percent.

§ 1-7.202-4 Allowable cost, fee, and payment.

Insert the following clause in all costreimbursement type supply contracts which provide for the payment of a fixed-fee:

ALLOWABLE COST, FIXED-FEE, AND PAYMENT

(a) For the performance of this contract, the Government shall pay to the Contractor:

(1) The cost thereof (hereinafter referred to as "allowable cost") determined by the Contracting Officer to be allowable in accordance with:

(1) Subpart 1-15.2 of the Federal Procurement Regulations (41 CFR 1-15.2), as in effect on the date of this contract; and

(11) The terms of this contract; and (2) Such fixed-fee, if any, as may be provided for in the Schedule.

(b) Payments shall be made to the Contractor when requested as work progresses, but not more frequently than bi-weekly, in amounts approved by the Contracting Officer. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as such representative may require, an invoice or public voucher supported by a statement of cost for the performance of this contract and claimed to constitute allowable cost. For this purpose, except as provided herein with respect to pension contributions, the term "costs" shall include only those recorded costs which result, at the time of the request for reimbursement, from payment by cash, check, or other form of actual payment for items or services purchased directly for the contract, together with (when the Contractor is not delinquent in payment of costs of contract performance in the ordinary course of business) costs incurred, but not necessarily paid, for materials which have

been issued from the Contractor's stores inventory and placed in the production process for use on the contract, for direct labor, for direct travel, for other direct inhouse costs, and for properly allocable and allowable indirect costs, as is shown by records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts plus the amount of progress payments which have been paid to the Contractor's subcontractors under similar cost standards. In addition, when pension contributions are paid by the Contractor to the retirement fund less frequently than quarterly, accrued costs therefor shall be excluded from indirect costs for payment purposes until such costs are paid. If pension contributions are paid on a quarterly or more frequent basis, accruals therefor may be included in indirect costs for payment purposes provided that they are paid to the fund within 30 days after the close of the period covered. If payments are not made to the fund within such 30-day period, pension contribution costs shall be excluded from indirect cost for payment purposes until payinent has been made. The restriction on payment more frequently than bi-weekly and the requirement of prior payment for items or services purchased directly for the contract shall not apply when the Contractor is a small business concern.

(c) Promptly after receipt of each invoice or voucher and statement of cost, the Government shall, except as otherwise provided in this contract subject to the provisions of (d), below, make payment thereon as approved by the Contracting Officer. Payment of the fixed-fee, if any, shall be made to the Contractor as specified in the Schedule: Provided, however, That after payment of 85 percent of the fixed-fee set forth in the Schedule, the Contracting Officer may withhold further payment of fee until a reserve shall have been set aside in an amount which he considers necessary to protect the interests of the Government, but such reserve shall not exceed 15 percent of the total fixedfee, or $100,000, whichever is less.

(d) At any time or times prior to final payment under this contract the Contracting Officer may have the invoices or vouchers and statements of cost audited. Each payment theretofore made shall be subject to reduction for amounts included in the related invoice or voucher which are found by the Contracting Officer, on the basis of such audit, not to constitute allowable cost. Any payment may be reduced for overpayments, or increased for underpayments, on preceding invoices or vouchers.

(e) On receipt and approval of the invoice or voucher designated by the Contractor as the "completion invoice" or "completion voucher" and upon compliance by the Contractor with all the provisions of this contract (including, without limitation, the provisions relating to patents and the provisions of (f), below), the Government shall promptly pay to the Contractor any balance

of allowable cost, and any part of the fixedfee, which has been withheld pursuant to (c), above, or otherwise not paid to the Contractor. The completion invoice or voucher shall be submitted by the Contractor promptly following completion of the work under this contract but in no event later than 1 year (or such longer period as the Contracting Officer may in his discretion approve in writing) from the date of such completion.

(f) The Contractor agrees that any refunds, rebates, credits, or other amounts (including any interest thereon) accruing to or received by the Contractor or any assignee under this contract shall be paid by the Contractor to the Government, to the extent that they are properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract. Reasonable expenses incurred by the Contractor for the purpose of securing such refunds, rebates, credits, or other amounts shall be allowable costs hereunder when approved by the Contracting Officer. Prior to final payment under this contract, the Contractor and each assignee under this contract whose assignment is in effect at the time of final payment under this contract shall execute and deliver:

(1) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including any interest thereon) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and

(2) A release discharing the Government its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions:

(1) Special claims in stated amounts cr in estimated amounts where the amounts are not susceptible of exact statement by the Contractor;

(11) Claims, together with reasonable expenses incidental thereto, based upon liabilities of the Contractor to third parties arising out of the performance of this contract: Provided, however, That such claims are not known to the Contractor on the date of the execution of the release; and provided further, that the Contractor gives notice of such claims in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier; and

(iii) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable expenses incidental thereto, incurred by the Contractor under the provisions of this contract relating to patents.

(g) Any cost incurred by the Contractor under the terms of this contract which would constitute allowable cost under the

provisions of this clause shall be included in determining the amount payable under this contract, notwithstanding any provisions contained in the specifications or other documents incorporated in this contract by reference, designating services to be performed or materials to be furnished by the Contractor at his expense or without cost to the Government.

[29 FR 10192, July 24, 1964 as amended at 40 FR 14913, Apr. 3, 1975; 40 FR 18996, May 1, 1975]

§ 1-7.202-5 Inspection of supplies and correction of defects.

INSPECTION OF SUPPLIES AND CORRECTION OF DEFECTS

(a) All supplies (which term throughout this clause includes without limitation raw materials, components, intermediate assemblies, and end products) shall be subject to inspection and test by the Government, to the extent practicable at all times and places including the period of manufacture, and in any event prior to acceptance. The Contractor shall provide and maintain an Inspection system acceptable to the Government covering the supplies, fabricating methods, and special tooling hereunder. The Government, through any authorized representative, may inspect the plant or plants of the Contractor or any of his subcontractors engaged in the performance of this contract. If any inspection or test is made by the Government on the premises of the Contractor or a subcontractor, the Contractor shall provide and shall require subcontractors to provide all reasonable facilities and assistance for the safety and convenience of the Government inspectors in the performance of their duties. All inspections and tests by the Government shall be performed in such a manner as will not unduly delay the work. Except as otherwise provided in this contract, acceptance of any supplies or lots of supplies shall be made as promptly as practicable after delivery thereof and shall be deemed to have been made no later than 60 days after the date of such delivery, if acceptance has not been made earlier within such period.

(b) At any time during performance of this contract, but not later than 6 months (or such other period as may be provided in the Schedule) after acceptance of the supplies or lots of supplies last delivered in accordance with the requirements of this contract, the Government may require the Contractor to remedy by correction or replacement, as directed by the Contracting Officer, any supplies or lots of supplies which at the time of delivery thereof are defective in material or workmanship or otherwise not in conformity with the requirements of this contract. Except as otherwise provided in paragraph (c) hereof, the cost of any such replacement or correction shall be included in allowable cost determined as provided in the clause of this contract entitled “Allowable Cost, Fixed

Fee, and Payment," but no additional fee shall be payable with respect thereto. Such supplies or lots of supplies shall not be tendered thereafter for acceptance unless the former requirement of correction is disclosed. If the Contractor fails to proceed with reasonable promptness to replace or correct such supplies or lots of supplies, the Government (1) may by contract or otherwise replace or correct such supplies and charge to the Contractor any increased cost occasioned the Government thereby, or may reduce any fixed fee payable under this contract (or require repayment of any fixed fee theretofore paid) in such amount as may be equitable under the circumstances, or (2) in the case of supplies not delivered, may require the delivery of such supplies, and shall have the right to reduce any fixed fee theretofore paid) in such amount as may be equitable under the circumstances, or (3) may terminate this contract for default as provided in the clause of this contract entitled "Termination for Default or Convenience of the Government." Failure to agree to the amount of any such increased cost to be charged to the Contractor or to such reduction in, or repayment of, the fixed fee shall be a dispute concerning a question of fact within the meaning of the clause of this contract entitled "Disputes."

(c) Notwithstanding the provisions of paragraph (b) hereof, the Government may at any time require the correction or replacement by the Contractor, without cost to the Government, of supplies or lots of supplies which are defective in material or workmanship, or otherwise not in conformity with the requirements of this contract, if such defects or failures are due to fraud, lack of good faith, or willful misconduct on the part of any of the Contractor's directors or officers, or on the part of any of his managers, superintendents, or other equivalent representatives, who has supervision or direction of (1) all or substantially all of the Contractor's business, or (2) all or substantially all of the Contractor's operations at any one plant or separate location in which this contract is being performed, or (3) a separate and complete major industrial operation in connection with the performance of this contract. The Government may at any time also require correction or replacement by the Contractor, without cost to the Government, of any such defective supplies or lots of supplies if the defects or failures are caused by one or more individual employees selected or retained by the Contractor after any such supervisory personnel has reasonable grounds to believe that such employee is habitually careless or otherwise unqualified.

(d) Corrected supplies or replaced supplies shall be subject to the provisions of this clause in the same manner and to the same extent as supplies originally delivered under this contract.

(e) The Contractor shall make his records of all inspection work available to the Government during the performance of this con

tract and for such longer period as may be specified in this contract.

(f) Except as provided in this clause and as may be provided in the Schedule, the Contractor shall have no obligation or liability to correct or replace supplies or lots of supplies which at the time of delivery are defective in material or workmanship or otherwise not in conformity with the requirements of this contract.

(g) Except as otherwise provided in the Schedule, the Contractor's obligation to correct or replace Government-furnished property (which is property in the possession of or acquired directly by the Government and delivered or otherwise made available to the Contractor) shall be governed by the provisions of the clause of this contract entitled "Government Property."

[blocks in formation]

(a) The Contractor shall notify the Contracting Officer reasonably in advance of entering into any subcontract which (1) is cost-reimbursement type, time and materials, or labor-hour, or (2) is fixed-price type and exceeds in dollar amount either $25,000 or 5% of the total estimated cost of this contract, or (3) provides for the fabrication, purchase, rental, installation, or other acquisition of special test equipment having a value in excess of $1,000 or of any items of industrial facilities.

(b) In the case of a proposed subcontract which (1) is cost-reimbursement type, time and materials, or labor-hour, and would involve an estimated amount in excess of $10,000, including any fee, or (2) is proposed to exceed $100,000, or (3) is one of a number of subcontracts under this contract with a single subcontractor for the same or related supplies or services which, in the aggregate are expected to exceed $100,000, the advance notification required by (a), above, shall include:

(1) A description of the supplies or services to be called for by the subcontract;

(2) Identification of the proposed subcontractor and an explanation of why and how the proposed subcontractor was selected, including the degree of competition obtained;

(3) The proposed subcontract price, together with the Contractor's cost or price analysis thereof;