Health Safety in the Coal Mines: Hearings Before the Subcommittee on Labor...91-2, June 26, August 6, 7, and 14, and 17, 19701971 - 814 pages |
From inside the book
Results 1-5 of 63
Page vii
... production and distribution , summary of reports 709 784 239 679 678 672-675 242 676 677 Schedule for walk - in examinations of personnel seeking mine - inspection jobs and location___ . 765 Unobligated funds appropriated to the Bureau ...
... production and distribution , summary of reports 709 784 239 679 678 672-675 242 676 677 Schedule for walk - in examinations of personnel seeking mine - inspection jobs and location___ . 765 Unobligated funds appropriated to the Bureau ...
Page 2
... produce coal but they produce hazards with it . Dust , for one thing . In our mine we have around 21 miles of belt . We have no cars . We have an all - belt system in our mine and dust problems are hazardous . I would like for you ...
... produce coal but they produce hazards with it . Dust , for one thing . In our mine we have around 21 miles of belt . We have no cars . We have an all - belt system in our mine and dust problems are hazardous . I would like for you ...
Page 5
... production was 8,500 tons of coal . Roof bolts were used for roof support and were installed by roof- bolting equipment provided on the continuous - mining machine . The maximum width of the No. 1 entry was 18 feet . The mine is classed ...
... production was 8,500 tons of coal . Roof bolts were used for roof support and were installed by roof- bolting equipment provided on the continuous - mining machine . The maximum width of the No. 1 entry was 18 feet . The mine is classed ...
Page 11
... production was 8,500 tons of coal . A block system of mining was practiced . Four entries were being devel- oped in 7 butt 3 face toward virgin territory . Entries and crosscuts were on 85 - foot centers . The No. 1 entry was about 17 ...
... production was 8,500 tons of coal . A block system of mining was practiced . Four entries were being devel- oped in 7 butt 3 face toward virgin territory . Entries and crosscuts were on 85 - foot centers . The No. 1 entry was about 17 ...
Page 13
... production of coal was delayed while roof bolts were installed to support the roof area of the last portion mined ( about 16 feet ) in the crosscut . The assistant mine foreman examined the face regions of 7 butt section , including No ...
... production of coal was delayed while roof bolts were installed to support the roof area of the last portion mined ( about 16 feet ) in the crosscut . The assistant mine foreman examined the face regions of 7 butt section , including No ...
Common terms and phrases
abated accident anemometer approved Band 3rd Crosscut Band 6th Crosscut belt black lung box cut Bureau of Mines circuit circuit breakers Clarksville Coal Company Coal Mine Health Coal Mine Inspector Coal Mine Safety Congress contract Contractor Department devices DOLE electric face equipment enforcement entry examinations explosion Federal Coal GERSHUNY going grievance haulage hazards Health and Safety hearing Homer City ignition industry injury installed Interior investigation issued KILCULLEN line brattice line canvas located machine Maple Creek March 30 miners Notice OZONISH penalty Pennsylvania percent person pneumoconiosis problem record regulations roof bolts roof control Safety Act safety committee Safety District safety lamp SAMPLES Secretary Senator RANDOLPH Senator SCHWEIKER Senator WILLIAMS spot inspections Statutory Provisions subcommittee Subpart surface SURVEY SAMPLES tests for methane tion trailing cables U.S. attorney underground United Mine Workers ventilation violation West Virginia WESTFIELD YABLONSKI
Popular passages
Page 716 - Contractor for adjustment under this clause must be asserted within 30 days from the date of receipt by the Contractor of the notification of change : Provided, however, That the Contracting Officer, if he decides that the facts justify such action, may receive and act upon any such claim asserted at any time prior to final Payment under this contract. Failure to agree to any adjustment shall be a dispute concerning a question of fact within the meaning of the clause of this contract entitled "Disputes.
Page 710 - Government on account of any alleged patent or copyright infringement arising out of the performance of this contract or out of the use of any supplies furnished or work or services performed hereunder, the Contractor shall furnish to the Government, when requested by the Contracting Officer, all evidence and information in possession of the Contractor pertaining to such suit or claim.
Page 710 - The rights and remedies of the Government provided in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law or under this contract.
Page 716 - Any claim by the Contractor for adjustment under this clause must be asserted within thirty (30) days from the date of receipt by the Contractor of the notification of change ; provided, however, that the Contracting Officer, if he decides that the facts justify such action, may receive and act upon any such claim asserted at any time prior to final payment under this contract. Failure to agree to any adjustment sbn4 be a dispute concerning a question of fact within the moaning of the oķanse of...
Page 712 - Opportunity clause. (b) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, creed, color, or national origin. (c) The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency Contracting Officer,...
Page 707 - In case any supplies or lots of supplies are defective in material or workmanship or otherwise not in conformity with the requirements of this contract, the Government shall have the right either to reject them (with or without instructions as to their disposition) or to require their correction.
Page 711 - ... employee for his unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or...
Page 706 - Contracting Officer" means the person executing this contract on behalf of the Government, and any other officer or civilian employee who is a properly designated Contracting Officer; and the term includes, except as otherwise provided in this contract, the authorized representative • of a Contracting Officer acting within the limits of his authority. (c) Except as otherwise provided in this contract, the term "subcontracts" includes purchase orders under this contract.
Page 713 - ... the Contractor for the purpose of securing business. For breach or violation of this warranty the Government shall have the right to annul this contract without liability or in its discretion to deduct from the contract price or consideration the full amount of such commission, percentage, brokerage, or contingent fee.
Page 708 - In no event shall copies of this contract or of any plans, specifications, or other similar documents relating to work under this contract, if marked "Top Secret," "Secret,