Page images
PDF
EPUB

Enter an alphabetic "O" for Other if the point of acceptance is not specified in the contract.

Block 9.-Prime contractor. Enter the address.

Block 10.-Administered by. Enter the address of the Procurement Office cited in the contract.

Block 11.-Shipped from/f.o.b.

(a) Enter the code and address of the "Shipped From" location. If identical to Block 9, enter "See Block 9."

(b) Enter on the same line and to the right of "FOB" and "S" for Origin or "D" for Destination as specified in the contract. Enter an alphabetic "O" if the "FOB" point cited in the contract is other than origin or destination.

Block 12.-Payment will be made by. Enter the address of the payment office cited in the contract.

Block 13.-Shipped to. Enter the address of the consignee as contained in the contract or shipping instructions.

Block 14.-Marked for. Enter the "Mark For" address and/or other designation as contained in the contract or shipping instructions.

Block 15.-Item Number. Enter the contrast line item, subline line, exhibit line or exhibit subline identification as set forth in the contract. If four or less digits are used, they will be positioned to the left of the vertical dashed line. Where a six digit identification is used, enter the last two digits to the right of the vertical dashed line.

Block 16.-Stock/part number/Description. (a) Enter, as applicable, for each line item, using single spacing between each line item:

(1) The Federal Stock Number (FSN) or noncatalog number and, if applicable, prefix or suffix; when a number is not provided or it is necessary to supplement the number, include other identification, e.g., manufacturer's name or Federal Supply Code, as published in Cataloging Handbook H4-1, and part number; additional part numbers may be shown in parentheses; the descriptive noun of the item nomenclature and, if provided, the Government assigned management/material control code.

The following technique may be used in the case of equal kind supply items: The first entry shall be the description without regard to kind. For example: "Resistor," "Vacuum Tube," etc. Below this description, enter the contract line item number in Block 15 and stock/part number followed by the size or type in Block 16.

(2) On the next printing line; the make, model, series number, lot, batch, hazard indicator and/or similar description.

(3) On the next printing line; the FED STRIP requisition number(s) when provided in the contract or shipping instructions.

(b) In addition to entries required above, enter on the next line the following as appropriate. Where applicable to all line item numbers identified in the MIRR, enter such

data only once after the last line item entry. Entries may be extended through Block 20.

(1) Enter in capital letters any special handling instructions/limits for material environmental control, e.g., temperature, humidity, aging, freezing, shock, etc.

(2) When an FSN is required by but not cited in a contract and has not been furnished by the Government, shipment may be made without such FSN at the direction of the contracting officer. Enter the authority for such shipment.

(3) When Government furnished property (GFP) is included with or incorporated into the line item, enter the letters "GFP".

(4) When shipment consists of replacements for supplies previously furnished, enter in capital letters "Replacement Shipment." (See 1.301, Block 17 for replacement indicators.)

(5) For items shipped with missing components, enter and complete the following: "Item(s) shipped short of the following component(s): FSN or comparable Identification Estimated Value

Quantity Authority

---)

[blocks in formation]

(7) When shipments involve drums, cylinders, reels, containers, skids, etc., designated as returnable under contract provisions, enter and complete the following: "Return to -, QuanOwnership

tity

Item (Government/contractor).”

(8) Enter shipping container number(s), the type, and the total number of the shipping container(s) included in the shipment.

(9) The MIRR shall be used to record and report the waivers and deviations from contract specifications, including the source and authority for the waiver or deviation. For example, the procuring installation authorizing the waiver or deviation and the identification of the authorizing document.

(10) For shipments involving discount terms, enter "Discount expedite" in at least 1-inch outline type style letters.

(11) When test/evaluation results are a condition of acceptance and are not available prior to shipment, the following note shall be entered if the shipment is approved by the contracting officer: "NOTE: Acceptance and payment are contingent upon receipt of approved test/evaluation results". The contracting officer shall advise (a) the consignee of the results (approval/disapproval) and (b) the contractor to withhold invoicing pending attachment to his invoice of the approved test/evaluation results.

(12) The copy of the DD Form 250 required to support payment for destination acceptance (top copy of the four with shipment) or ARP origin acceptance (additional copy furnished to the QAR) shall be identified as follows: enter "Payment Copy" in

approximately 12-inch outline type style letters with "Forward to Block 12 address" in approximately 4-inch letters immediately below. Do not obliterate any other entries.

(13) A double line shall be drawn completely across the form following the last entry.

Block 17.-Quantity shipped/received

(a) Enter the quantity shipped, using the unit of measure indicated in the contract. When a second unit of measure is used, enter the appropriate quantity directly below in parenthesis.

(b) Enter a "Z" below the first digit of the quantity when:

(1) The total quantity of the line item is delivered, including variations within

contract terms.

(2) All shortages on items previously shipped short are delivered.

(c) If a replacement shipment is involved, enter below the first digit of the quantity, the letter "A" to designate first replacement, "B" for second replacement, etc. The final shipment indicator "Z" shall not be used when a final line item shipment is replaced.

Block 18.-Unit. Enter the abbreviation of the unit of measure as indicated in the contract. Where a second unit of measure is indicated in the contract or used for shipping purposes, enter the second unit of measure directly below in parenthesis.

Block 19.-Unit price. The contractor may, at his option, enter unit prices on all MIRR copies when the MIRR is used as an invoice. Block 20.-Amount. Enter the extended amount when the unit price is entered in Block 19.

Block 21.-PROCUREMENT QUALITY ASSURANCE. The words "conform to contract" contained in the printed statements in Blocks A and B related to contract obligations pertaining to quality, and to the quantity of the items on the report. The statements shall not be modified. Notes taking exception shall be entered in Block 16 or on attached supporting documents with appropriate block cross-reference.

"A. Origin."

(1) The authorized Government representative shall:

a. Place an "X" when applicable in the appropriate PQA and/or Acceptance box(es) to evidence origin Procurement Quality Assurance and/or Acceptance. When the contract requires PQA at destination in addition to origin PQA, an asterisk will be entered at the end of the statement and an explanatory note entered in Block 16;

b. Enter the date of signature;

c. Sign; and

d. Enter the typed, stamped, or printed name of the signer and office code.

"B. Destination."

(1) When acceptance at origin is indicated in Block 21A, no entries shall be made in Block 21B.

99-191-69--50

(2) When PQA and Acceptance or Acceptance is at destination, the authorized Government representative shall:

(a) Place an "X" in the appropriate box(es);

(b) Enter the date of signature; (c) Sign; and

(d) Enter typed, stamped, or printed name and title.

Block 22.-Receiver's use. This block is provided for the use of the receiving activity (Government or contractor) to denote receipt, quantity and condition.

Block 23.-Contractor use only. This block is provided and reserved for Contractor use. 1.302 [Reserved]

[blocks in formation]

1.305 Correction instructions. When, because of errors or omissions, it is necessary to correct the MIRR after distribution has been made, a revised MIRR shall be effected by correcting the original master and distributing the corrected form. The corrections shall be made as follows:

(i) Circle the error and place the corrected information in the same block; if space is limited, enter the corrected information in Block 16 referencing the error page and block.

(ii) The words "Corrections Have Been Verified" shall be entered on page 1. The authorized Government representative shall place the date and sign immediately below the statement.

(iii) MIRRs shall not be corrected for Blocks 19 and 20 entries.

(iv) Pages of the MIRR requiring correction shall be clearly marked "Corrected Copy", avoiding obliteration of any other entries. Where corrections are made only on continuation sheets, page No. 1 shall also be marked "Corrected Copy."

(v) Page 1 and only those continuation pages marked "Corrected Copy" shall be distributed to the initial distribution. A complete MIRR with corrections shall be distributed to new addressee (s) created by error corrections.

1.306 Invoice instructions. Contractors are encouraged to use copies of the MIRR as an invoice, in lieu of a commercial form, but are not required to do so. When used as an invoice, four copies shall be prepared and forwarded to the payment office as follows: (i) Complete Blocks 5, 6, 19, and 20.

(ii) Mark in letters approximately one inch high, first copy: "Original Invoice"; three copies: "Invoice Copy".

(iii) Forward the four copies to the payment office (Block 12 address).

1.307 Packing list instructions. Copies of the MIRR may be used as a packing list. When they are used, the packing list copies shall be in addition to the copies of the MIRR required for distribution (I.401) and shall be marked "Packing List".

1.308 Receiving instructions. When the MIRR is used for receiving purposes, procedures shall be as prescribed by local directives. If PQA and Acceptance or Acceptance of supplies is required upon arrival at destination, see Block 21B for instructions.

[blocks in formation]

FINDING AIDS

A list of current CFR volumes, a list of superseded CFR volumes, and a list of CFR titles, subtitles, chapters, subchapters and parts are included in the subject index volume to the Code of Federal Regulations which is published separately and revised annually.

Table of CFR Titles and Chapters

Alphabetical List of CFR Subtitles and Chapters
List of Sections Affected

Chap.

Table of CFR Titles and Chapters

Title 1-General Provisions

I Administrative Committee of the Federal Register

I

II

III

Appendix A Guide to record retention requirements

Appendix B-List of acts requiring publication in the Federal
Register

Appendix C-Guide to Federal Register Finding Aids

Title 2-The Congress

Chapter I-Parallel Tables of Statutory Authorities and Rules

Proclamations

Title 3-The President

Executive Orders

Presidential Documents other than Proclamations and Executive
Orders

IV Codified Text of Selected Presidential Documents

V Executive Office of the President

Title 4-Accounts

I General Accounting Office

II Federal Claims Collection Standards (General Accounting Of

fice-Department of Justice)

III Standards for Waiver of Claims for Erroneous Payment of Pay (General Accounting Office)

[blocks in formation]

IV Civil Service Commission (Equal Employment Opportunity)

V International Organizations Employees Loyalty Board

VI Department of Defense

VII Advisory Commission on Intergovernmental Relations

VIII National Capital Transportation Agency

IX Appalachian Regional Commission

X National Capital Housing Authority

XI United States Soldiers' Home

XII District of Columbia Redevelopment Land Agency

Title 6-[Reserved]

« PreviousContinue »