Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 100
Page
... submitted by the Chief Engineer to the Regional Director as early as possible in the design process for comments and ... submitted to him by the Chief Engineer . Review by the Regional Engineer and other staff advisors to the Regional ...
... submitted by the Chief Engineer to the Regional Director as early as possible in the design process for comments and ... submitted to him by the Chief Engineer . Review by the Regional Engineer and other staff advisors to the Regional ...
Page
... submitted by the various divisions ; compiles data for and prepares special purpose maps ; and performs other types of drafting work as required . The Head of the Research and Geology Division is the principal staff officer of the Chief ...
... submitted by the various divisions ; compiles data for and prepares special purpose maps ; and performs other types of drafting work as required . The Head of the Research and Geology Division is the principal staff officer of the Chief ...
Page
... submitted in draft form by field offices or design sections ; supervising specialized grouting operations ; obtaining wage rates from the Department of Labor to be included in construction contracts for which the Chief Engineer is ...
... submitted in draft form by field offices or design sections ; supervising specialized grouting operations ; obtaining wage rates from the Department of Labor to be included in construction contracts for which the Chief Engineer is ...
Page
... submitted to reach the Chief Engineer by the fifth day of the month following that for which the report is made . Transmittals should be marked : " Attention : 220B . " CROSS .5 References to other parts of the Manual are as follows ...
... submitted to reach the Chief Engineer by the fifth day of the month following that for which the report is made . Transmittals should be marked : " Attention : 220B . " CROSS .5 References to other parts of the Manual are as follows ...
Page
... submitted to reach the Chief Engineer by the fifth day of the month following that for which the report is made . Transmittals should be marked : " Attention : 220B . ' CROSS .5 References to other parts of the Manual are as follows ...
... submitted to reach the Chief Engineer by the fifth day of the month following that for which the report is made . Transmittals should be marked : " Attention : 220B . ' CROSS .5 References to other parts of the Manual are as follows ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design