Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 46
Page
... signing drawings is shown in Paragraph 2.5.4 of Volume X. Duplicate prints of all drawings prepared or revised by operating offices should be forwarded to the Chief Engineer . It is important that the design drawings be revised to show ...
... signing drawings is shown in Paragraph 2.5.4 of Volume X. Duplicate prints of all drawings prepared or revised by operating offices should be forwarded to the Chief Engineer . It is important that the design drawings be revised to show ...
Page
... signing drawings is shown in Paragraph 2.5.4 of Volume X. Duplicate prints of all drawings prepared or revised by operating offices should be forwarded to the Chief Engineer . It is important that the design drawings be revised to show ...
... signing drawings is shown in Paragraph 2.5.4 of Volume X. Duplicate prints of all drawings prepared or revised by operating offices should be forwarded to the Chief Engineer . It is important that the design drawings be revised to show ...
Page
... signed as indicated in the tabulation under Paragraph 2.5.4 . C. Record drawings shall be signed as submitted by the Construction Engineer , as recommended by the Chief Construction Engineer , and as approved by the Chief Engineer . D ...
... signed as indicated in the tabulation under Paragraph 2.5.4 . C. Record drawings shall be signed as submitted by the Construction Engineer , as recommended by the Chief Construction Engineer , and as approved by the Chief Engineer . D ...
Page
... signed as reviewed and approved by Regional , District , or project offices ( as shown above ) . Drawings for inclusion in specifications issued by the Chief Engineer , even though technical review has been waived , shall be signed as ...
... signed as reviewed and approved by Regional , District , or project offices ( as shown above ) . Drawings for inclusion in specifications issued by the Chief Engineer , even though technical review has been waived , shall be signed as ...
Page
... signed the drawing as " Submitted . " In the Branch of Design and Construction , unless there is some imperative reason to the con- trary , all revisions to approved drawings should be made in the division that originated the drawing ...
... signed the drawing as " Submitted . " In the Branch of Design and Construction , unless there is some imperative reason to the con- trary , all revisions to approved drawings should be made in the division that originated the drawing ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design