Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 100
Page
... Responsibility and Authority of the Chief Engineer TABLE OF CONTENTS Paragraph 1.1.1 1.1.2 General Statement Work ... Responsibility and Authority for Design Planning Design Work Withdrawals of Design Work Cross Reference Design Work ...
... Responsibility and Authority of the Chief Engineer TABLE OF CONTENTS Paragraph 1.1.1 1.1.2 General Statement Work ... Responsibility and Authority for Design Planning Design Work Withdrawals of Design Work Cross Reference Design Work ...
Page
... responsibility , and organizational relationships of the Bureau are prescribed in Volume I. The Branch of Design and Construction , as a principal staff office of the Commissioner , is responsible for the development of policies ...
... responsibility , and organizational relationships of the Bureau are prescribed in Volume I. The Branch of Design and Construction , as a principal staff office of the Commissioner , is responsible for the development of policies ...
Page
... responsible for the accomplish- ment of this work within the Bureau program . Basic design requirements and the total estimated cost will be submitted by the Chief Engineer to the Regional Director as early as possible in the design ...
... responsible for the accomplish- ment of this work within the Bureau program . Basic design requirements and the total estimated cost will be submitted by the Chief Engineer to the Regional Director as early as possible in the design ...
Page
... RESPONSIBILITY AND AUTHORITY OF THE CHIEF ENGINEER CONSTRUCTION ( Continued ) their services in the best interests of the Bureau ; reviewing and recommending action to be taken by the Commissioner on proposed organizational arrangements ...
... RESPONSIBILITY AND AUTHORITY OF THE CHIEF ENGINEER CONSTRUCTION ( Continued ) their services in the best interests of the Bureau ; reviewing and recommending action to be taken by the Commissioner on proposed organizational arrangements ...
Page
... Responsibility of the Regional Director of the Branch of Design & Construction CHAP . 1.1 RESPONSIBILITY AND AUTHORITY OF THE CHIEF ENGINEER CONSTRUCTION ( Continued ) Likewise , the authorized representative of the contracting officer ...
... Responsibility of the Regional Director of the Branch of Design & Construction CHAP . 1.1 RESPONSIBILITY AND AUTHORITY OF THE CHIEF ENGINEER CONSTRUCTION ( Continued ) Likewise , the authorized representative of the contracting officer ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design