Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 100
Page
... payment retained percentages and the final settlement . In view of the complexities often involved , the existence of a specialized staff in the Branch of Design and Construction , the necessity for expeditious communication with ...
... payment retained percentages and the final settlement . In view of the complexities often involved , the existence of a specialized staff in the Branch of Design and Construction , the necessity for expeditious communication with ...
Page
... pay item number , if available . C. Column 2 , Location . --Indicate the area or structure in which the item described in Column 3 will be used or installed , unless the description in Column 3 is self - explanatory as to location . D ...
... pay item number , if available . C. Column 2 , Location . --Indicate the area or structure in which the item described in Column 3 will be used or installed , unless the description in Column 3 is self - explanatory as to location . D ...
Page 8
... pay item number , if available . C. Column 2 , Location . --Indicate the area or structure in which the item described in Column 3 will be used or installed , unless the description in Column 3 is self - explanatory as to location . D ...
... pay item number , if available . C. Column 2 , Location . --Indicate the area or structure in which the item described in Column 3 will be used or installed , unless the description in Column 3 is self - explanatory as to location . D ...
Page
... payment ; negotiations of prices for add tional work not covered by contract provision ; coordination between con- tracts ; review of contractor's plant , organization , and construction sched and preparation of reports and records of ...
... payment ; negotiations of prices for add tional work not covered by contract provision ; coordination between con- tracts ; review of contractor's plant , organization , and construction sched and preparation of reports and records of ...
Page
... payment to contractor ( usually monthly progress payments ) , name and address of bonding company , and amount of bond . The actual amounts of payments to contractors , and statements as to whether or not work and progress is ...
... payment to contractor ( usually monthly progress payments ) , name and address of bonding company , and amount of bond . The actual amounts of payments to contractors , and statements as to whether or not work and progress is ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design