Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 86
Page
... Inspection and Tests Chapter 7.1 Field Inspection and Tests During Construction 7.2 Shop and Mill Inspection Part 8 Construction Cost Estimates Chapter 8.1 Definitions of Cost Estimates 8.2 Responsibilities for Cost Estimates 8.3 8.4 ...
... Inspection and Tests Chapter 7.1 Field Inspection and Tests During Construction 7.2 Shop and Mill Inspection Part 8 Construction Cost Estimates Chapter 8.1 Definitions of Cost Estimates 8.2 Responsibilities for Cost Estimates 8.3 8.4 ...
Page
... INSPECTION OF STRUCTURES AND FACILITIES Policy Scope of Inspection Program 1.1.18 1.1.19 1.1.20 1.1.21 1.1.22 Cross Reference Classes of Inspection Responsibility of Chief Engineer DESIGNER'S OPERATING INSTRUCTIONS 1.1.23 Responsibility ...
... INSPECTION OF STRUCTURES AND FACILITIES Policy Scope of Inspection Program 1.1.18 1.1.19 1.1.20 1.1.21 1.1.22 Cross Reference Classes of Inspection Responsibility of Chief Engineer DESIGNER'S OPERATING INSTRUCTIONS 1.1.23 Responsibility ...
Page
... inspection , repair , and maintenance of Bureau structures and facilities . The principal purposes of Bureau inspections are ( 1 ) to verify the safety of structures and facilities ; ( 2 ) to disclose conditions that might cause ...
... inspection , repair , and maintenance of Bureau structures and facilities . The principal purposes of Bureau inspections are ( 1 ) to verify the safety of structures and facilities ; ( 2 ) to disclose conditions that might cause ...
Page
... INSPECTION OF STRUCTURES AND FACILITIES ( Continued ) .19 The inspection program covers all structures and facilities for whose operating condition and maintenance the Bureau is responsible , including structures transferred to water ...
... INSPECTION OF STRUCTURES AND FACILITIES ( Continued ) .19 The inspection program covers all structures and facilities for whose operating condition and maintenance the Bureau is responsible , including structures transferred to water ...
Page
... inspection of Bureau structures and facilities ; and issues designer's instructions for proper operation and maintenance . .2 Under the technical supervision of the Office of Management Planning , the Office of Administrative Analysis ...
... inspection of Bureau structures and facilities ; and issues designer's instructions for proper operation and maintenance . .2 Under the technical supervision of the Office of Management Planning , the Office of Administrative Analysis ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design