Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 100
Page
... Construction in Denver , or in the field with the assistance of specialized personnel from the Chief Engineer's staff and the staffs of other offices . .15 The Chief Engineer is authorized to review and approve proposals for the ...
... Construction in Denver , or in the field with the assistance of specialized personnel from the Chief Engineer's staff and the staffs of other offices . .15 The Chief Engineer is authorized to review and approve proposals for the ...
Page
... construction contracts for which the Chief Engineer is contracting officer ; reviewing and determining adequacy of safety measures incorporated in specifications and during construction ; assembling and main- taining records of ...
... construction contracts for which the Chief Engineer is contracting officer ; reviewing and determining adequacy of safety measures incorporated in specifications and during construction ; assembling and main- taining records of ...
Page
... construction , so that the drawings will be an accurate record of the features as built . Final computations and drawings prepared by operating offices should be forwarded to the Chief Engineer for permanent record after they have ...
... construction , so that the drawings will be an accurate record of the features as built . Final computations and drawings prepared by operating offices should be forwarded to the Chief Engineer for permanent record after they have ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design