Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 75
Page
... completion of the work . Special details of employees from the Branch of Design and Construction to Regions for work under the direction of field supervisors , require a prevalidation of funds to permit reimbursement on completion of ...
... completion of the work . Special details of employees from the Branch of Design and Construction to Regions for work under the direction of field supervisors , require a prevalidation of funds to permit reimbursement on completion of ...
Page
... completion date ; maintains file of specifications issued by field offices ; receives , maintains indexes of , and issues engineer- ing drawings prepared in the Branch of Design and Construction and in regional and operating offices ...
... completion date ; maintains file of specifications issued by field offices ; receives , maintains indexes of , and issues engineer- ing drawings prepared in the Branch of Design and Construction and in regional and operating offices ...
Page
... completion , if it becomes apparent that the original estimate of man - days required to perform the assign- ment was either too high or too low , the estimate should be revised so that the amount shown for the percentage of completion ...
... completion , if it becomes apparent that the original estimate of man - days required to perform the assign- ment was either too high or too low , the estimate should be revised so that the amount shown for the percentage of completion ...
Page
... Completion 28 32 37 41 46 Delegation includes : Total 612 Fig . 1 Par . 2.2.4 BUREAU OF RECLAMATION MANUAL Volume X Design and Construction Part. Region : Project : Columbia Basin Project Coulee Dam Division Feature : SUMMARY SHEET OF ...
... Completion 28 32 37 41 46 Delegation includes : Total 612 Fig . 1 Par . 2.2.4 BUREAU OF RECLAMATION MANUAL Volume X Design and Construction Part. Region : Project : Columbia Basin Project Coulee Dam Division Feature : SUMMARY SHEET OF ...
Page
... completion , if it becomes apparent that the original estimate of man - days required to perform the assignment was either too high or too low , the estimate should be revised so that the amount shown for the percentage of completion ...
... completion , if it becomes apparent that the original estimate of man - days required to perform the assignment was either too high or too low , the estimate should be revised so that the amount shown for the percentage of completion ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design