Reclamation Manual: Design and construction, pt. 2. Engineering design: Design supplement no. 2: Treatise on dams; Design supplement no. 3: Canals and related structures; Design supplement no. 4: Power systems; Design supplement no. 5: Field installation procedures; Design supplement no. 7: Valves, gates, and steel conduits; Design supplement no. 8: Miscellaneous mechanical equipment and facilities; Design supplement no. 9: Buildings; Design supplement no. 10: Transmission structures; Design supplement no. 11: Railroads, highways, and camp facilities, Volume 10 |
From inside the book
Results 1-5 of 82
Page
... approval of contract adjustments , provision of technical information on design , and approval of disbursement of partial payment retained percentages and the final settlement . In view of the complexities often involved , the existence ...
... approval of contract adjustments , provision of technical information on design , and approval of disbursement of partial payment retained percentages and the final settlement . In view of the complexities often involved , the existence ...
Page
... approval and promulgation by the Regional Director statements of procedure , consistent with policies and procedures of the Commissioner , for the guidance of employees in the region in the performance of activities relating to ...
... approval and promulgation by the Regional Director statements of procedure , consistent with policies and procedures of the Commissioner , for the guidance of employees in the region in the performance of activities relating to ...
Page
... approval , providing they conform to authorized procedures and standards ; but the Chief Engineer in all cases is authorized to review and advise on field programs and shall be furnished copies of reports , data , and findings for ...
... approval , providing they conform to authorized procedures and standards ; but the Chief Engineer in all cases is authorized to review and advise on field programs and shall be furnished copies of reports , data , and findings for ...
Page
... approve proposals for the establishment , discontinuance , or modification of field control laboratories so that these laboratories may be located most strategically throughout the Bureau territory and so that the proposed installation ...
... approve proposals for the establishment , discontinuance , or modification of field control laboratories so that these laboratories may be located most strategically throughout the Bureau territory and so that the proposed installation ...
Page
... approval by the Chief Engineer , extra work orders , orders for changes , and findings of fact on construction and long - form supply con- tracts submitted in draft form by field offices or design sections ; supervising specialized ...
... approval by the Chief Engineer , extra work orders , orders for changes , and findings of fact on construction and long - form supply con- tracts submitted in draft form by field offices or design sections ; supervising specialized ...
Other editions - View all
Common terms and phrases
5.2 SPECIFICATIONS aggregate amount approval authorized representative bid opening bidder bond borrow pit Branch of Design BUREAU OF RECLAMATION canal cement central Bureau laboratories CHAP Chapter Chief Engineer Commissioner completion concrete construction contracts Construction Engineer construction materials construction specifications Construction Through Award Cont contracting officer contractor copy cost estimates Design and Construction DESIGN DATA REQUIREMENTS DESIGNS AND ESTIMATES designs and specifications determine drawings embankment equipment Excavation extra work order facilities field furnished geologic Government grouting holes hydraulic inspector Installing instructions investigations Labor liquidated damages MANUAL Volume X maps operating office order for changes Paragraph pay items payment performance bond performed PIEZOMETER plant pozzolan prepared procedures PROPERTY CLASS RECLAMATION MANUAL Volume Regional Director request responsible revised riprap samples Secretary of Labor Sheet SPECIFICATIONS AND CONTRACT spillway structures subcontractor submitted supervision surety technical TION transmission lines transmitted United Volume X Design