CHAP. 2.8 SCHEDULE OF MATERIALS AND EQUIPMENT DESIGN ACTIONS Fig. 3 Par. 2.8.

[blocks in formation]

The consolidated Schedule of Materials and Equipment Design Actions identified above is revised as follows:

[blocks in formation]

Instructions: Identify each change by page, line and column numbers of the current
consolidated schedule of materials and equipment design actions. Describe each
change accurately. Include narrative explanation as required.