Page images
PDF
EPUB
[blocks in formation]

§ 1-8.803-6 Format 803-6, Inventory Schedule C-Continuation Sheet (Work in Process).

INVENTORY SCHEDULE C-CONTINUATION SHEET (WORK IN PROCESS)

[merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small]

SPECIMEN

[blocks in formation]
[graphic][subsumed]

§ 1-8.803-7

Format 803–7, Inventory Schedule D (Dies, Jigs, Fixtures, etc., and Special Tools).

(a) Page 1 of Format 803-7.

[ocr errors]
[ocr errors]
[blocks in formation]

b. Use a new form for each such general classification. Insert the name of the classification in the designated block in the upper right-hand corner of the form and list the items falling under that classification in sequence. For example, on the sheet used to list Dies, group separately all Extruding Dies, all Forging Dies, all Forming Dies, etc. On the sheet used for Gauges, group separately all Thread Gauges, all Radius Gauges, all Depth Gauges, etc. Whenever possible, listing of Special Tools should identify the names and numbers of the parts for which the tools are used, using the Goverment part number where assigned.

[blocks in formation]

D. COSTS (Columns ● and f).—Any generally recognized basis for costing inventory may be used, provided it has been regularly used by the contrac for and properly reflects his costs.

E. COMMON ITEMS.—Any items of inventory reasonably usable, without loss to the contractor on his other work, because they are materials, parts, or components, common in nature to both the terminated contract and other work of the contractor, are not to be listed except for items the delivery of which has been required by the Government and except for Governmentfurnished property. (See Inventory Schedule Certificate.)

F. PROCEEDS OF AUTHORIZED SALE (Column g).—Insert the letter "A" after the amount if the sale (or credit for acquisition) has been authorized or approved by the contracting officer or customer. Insert the letter "C" if the amount represents your offer to acquire or sell. In either case, quanfity should also be shown (on a second line) if less than the full quantity shown in Column d.

G. GOVERNMENT-OWNED PROPERTY

(a) Government-furnished property should be listed on separate sheem, marked to show that the items are Government-furnished.

(b) Where tid materials purchased by the contractor is vested in the Government, such materials should be listed and cost data supplied. MISCELLANEOUS

kale Sangdules. —If the space provided for any information is sumcient, attach separate supporting schedules. Continuation Sheets.-Use Format 803-8 whenever more than one ge is required.

SPECIN

(c) Number of Copies.-The number of sets of inventory schedules re quired will be indicated by the contracting officer or the customer from whom the notice of termination is received.

Schedule

[blocks in formation]

§ 1-8.803-8 Format 803–8, Inventory Schedule D -Continuation Sheet (Dies, Jigs, Fixtures, etc., and

Special Tools).

INVENTORY SCHEDULE D-CONTINUATION SHEET (DIES, JIGS, FIXTURES, ETC., AND SPECIAL TOOLS)

[blocks in formation]

$ 1-8.803-9

Only).

Format 803-9, Termination Inventory Schedule E (Short Form for Use with Format 802-3 (a) Page 1 of Format 803-9.

[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]
« PreviousContinue »