Page images
PDF
EPUB

nated in an active participant of the employer's pension plan.

(55) Pricing. The process of establishing the amount or amounts to be paid in return for goods or services.

(56) Production unit. A grouping of activities which either uses homogeneous inputs of direct material and direct labor or yields homogeneous outputs such that costs or statistics related to these homogeneous inputs or outputs are appropriate as bases for allocating variances.

(57) Projected average loss. The estimated long-term average loss per period for periods of comparable exposure to risk of loss.

(58) Projected benefit cost method. Any of the several actuarial cost methods which distribute the estimated total cost of all of the employee's prospective benefits over a period of years, usually their working careers.

(59) Proposal. Any offer or other submission used as a basis for pricing a contract, contract modification, or termination settlement, or for securing payments thereunder.

(60) Repairs and maintenance. Maintenance is the regularly recurring activity of keeping assets in normal or expected operating condition. Repair is the activity of putting them back into normal or expected operating condition. The total endeavor to obtain the expected service during the life of tangible capital assets is generally called repairs and maintenance.

(61) Reporting costs. Provision of cost information to others. The reporting of costs involves selecting relevant cost data and presenting it in an intelligible manner for use by the recipient.

(62) Residual value. The proceeds, less removal and disposal costs, if any, realized upon disposition of a tangible capital assets. It usually is measured by the net proceeds from the sale or other disposition of the asset, or its fair value if the asset is traded in on another asset. The estimated residual value is a current forecast of the residual value.

(63) Segment. One of two or more divisions, product departments, plants, or other subdivisions of an organization reporting directly to a home office, usually identified with responsi

bility for profit and/or producing a product or service. The term includes Government-owned contractor-operated (GOCO) facilities, and joint ventures and subsidiaries (domestic and foreign) in which the organization has a majority ownership. The term also includes those joint ventures and subsidiaries (domestic and foreign) in which the organization has less than a majority of ownership, but over which it exercises control.

(64) Self-insurance. The assumption or retention of the risk of loss by the contractor, whether voluntarily or involuntarily. Self-insurance includes the deductible portion of purchased insurance.

(65) Self-insurance charge. A cost which represents the projected average loss under a self-insurance plan.

(66) Service life. The period of usefulness of a tangible capital asset (or group of assets) to its current owner. The period may be expressed in units of time or output. The estimated service life of a tangible capital asset (or group of assets) is a current forecast of its service life and is the period over which depreciation cost is to be assigned.

[blocks in formation]

(69) Tangible capital asset. An asset that has physical substance, more than minimal value, and is expected to be held by an enterprise for continued use or possession beyond the current accounting period for the services it yields.

(70) Termination gain or loss. An actuarial gain or loss resulting from the difference between the assumed and actual rates at which plan participants separate from employment for reasons other than retirement, disability, or death.

(71) Unallowable cost. Any cost which, under the provisions of any pertinent law, regulation, or contract, cannot be included in prices, cost reim

13-131 0-83--19

bursements, or settlements under a Government contract to which it is allocable.

(72) Variance. The difference between a preestablished measure and an actual measure.

(73) Weighted average cost. An inventory costing method under which an average unit cost is computed periodically by dividing the sum of the cost of beginning inventory plus the cost of acquisitions, by the total number of units included in these two categories.

[46 FR 61852, Dec. 21, 1981]

§ 1-3.1220-1 Consistency in estimating, accumulating and reporting costs.

PART 401-COST ACCOUNTING STANDARDCONSISTENCY IN ESTIMATING, ACCUMULATING AND REPORTING COSTS

[blocks in formation]

401.40 Fundamental requirement. 401.50 Techniques for application.

401.60 Illustrations.

401.70 Exemptions. 401.80 Effective date.

APPENDIX-INTERPRETATION NO. 1.

AUTHORITY: Sec. 103, 84 Stat. 796; 50 U.S.C. App. 2168.

SOURCE: 37 FR 4172, February 29, 1972, unless otherwise noted.

§ 401.10 General applicability.

General applicability of this cost accounting standard is established by § 331.30 of the Board's regulations on applicability, exemption, and waiver of the requirement to include the cost accounting standards contract clause in negotiated defense prime contracts and subcontracts (§ 331.30 of this chapter).

(43 FR 24819, June 8, 1978)

§ 401.20 Purpose.

The purpose of this Cost Accounting Standard is to ensure that each contractor's practices used in estimating costs for a proposal are consistent with cost accounting practices used by him in accumulating and reporting costs. Consistency in the application of cost accounting practices is necessary to enhance the likelihood that comparable transactions are treated alike. With respect to individual contracts, the consistent application of cost accounting practices will facilitate the preparation of reliable cost estimates used in pricing a proposal and their comparison with the costs of perform

ance of the resulting contract. Such comparisons provide one important basis for financial control over costs during contract performance and aid in establishing accountability for costs in the manner agreed to by both parties at the time of contracting. The comparisons also provide an improved basis for evaluating estimating capabilities.

§ 401.30 Definitions.

(a) The following definitions of terms which are prominent in this standard are reprinted from Part 400 of this chapter for convenience. Other terms which are used in this standard and are defined in Part 400 of this chapter have the meanings ascribed to them in that part unless the text demands a different definition or the definition is modified in subparagraph (b) of this paragraph.

(1) Accumulating costs. The collecting of cost data in an organized manner, such as through a system of accounts.

(2) Actual cost. An amount determined on the basis of cost incurred as distinguished from forecasted cost. Includes standard cost properly adjusted for applicable variance. (38 FR 30730, November 7, 1973)

(3) Estimating costs. The process of forecasting a future result in terms of cost, based upon information available at the time.

(4) Indirect cost pool. A grouping of incurred costs identified with two or more objectives but not identified specifically with any final cost objective. (38 FR 30730, Nov. 7, 1973)

(5) Pricing. The process of establishing the amount or amounts to be paid in return for goods or services.

(6) Proposal. Any offer or other submission used as a basis for pricing a contract, contract modification or termination settlement or for securing payments thereunder. (7) Reporting costs. Provision of cost information to others.

The reporting of costs involves selecting relevant cost data and presenting it in an intelligible manner for use by the recipient.

(b) The following modification of definitions set forth in Part 400 of this chapter are applicable to this standard:

None.

(37 FR 4172, February 29, 1972, as amended at 38 FR 30730, November 7, 1973)

§ 401.40 Fundamental requirement.

(a) A contractor's practices used in estimating costs in pricing a proposal shall be consistent with his cost accounting practices used in accumulating and reporting costs.

(b) A contractor's cost accounting practices used in accumulating and reporting actual costs for a contract shall be consist

H

3

4

Z

ent with his practices used in estimating costs in pricing the related proposal.

(c) The grouping of homogeneous costs in estimates prepared for proposal purposes shall not per se be deemed an inconsistent application of cost accounting practices under paragraphs (a) and (b) of this section when such costs are accumulated and reported in greated detail on an actual cost basis during contract performance.

§ 401.50 Techniques for application.

(a) The standard allows grouping of homogeneous costs in order to cover those cases where it is not practicable to estimate contract costs by individual cost element or function. However, costs estimated for proposal purposes shall be presented in such a manner and in such detail that any significant cost can be compared with the actual cost accumulated and reported therefor. In any event the cost accounting practices used in estimating costs in pricing a proposal and in accumulating and reporting costs on the

Practices used in estimating costs for proposals

resulting contract shall be consistent with respect to: (1) The classification of elements or functions of cost as direct or indirect; (2) the indirect cost pools to which each element or function of cost is charged or proposed to be charged; and (3) the methods of allocating indirect costs to the contract.

(b) Adherence to the requirement of § 401.40(a) of this standard shall be determined as of the date of award of the contract, unless the contractor has submitted cost or pricing data pursuant to Public Law 87-653, in which case adherence to the requirement of § 401.40(a) shall be determined as of the date of final agreement on price, as shown on the signed certificate of current cost or pricing data. Notwithstanding § 401.40(b), changes in established cost accounting practices during contract performance may be made when authorized by standards, rules, and regulations issued by the Cost Accounting Standards Board.

§ 401.60 Illustrations.

Practices used in accumulating and reporting costs of contract performance

(a) The following examples are illustrative of applications of cost accounting practices which are deemed to be consistent.

1. Contractor estimates an average direct labor rate for manufacturing direct labor by labor category or function.

2. Contractor estimates an average cost for minor standard hardware items, including nuts, bolts, washers, etc.

3. Contractor uses an estimated rate for manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his estimate of manufacturing overhead and provides supporting data for the estimated direct labor base.

1. Contractor records manufacturing direct labor based on actual cost for each individual and collects such costs by labor category or function.

2. Contractor records actual cost for minor standard hardware items based upon invoices or material transfer slips.

3. Contractor accounts for manufacturing overhead by individual items of cost which are accumulated in a cost pool allocated to final cost objectives on a direct labor base.

(b) The following examples are illustrative of application of cost accounting practices which are deemed not to be consistent

[blocks in formation]

ess, or destroyed in testing and qualification processes. The cost of some or all of such additional direct material requirements is often estimated by the application of one or more percentage factors to the total cost of basic direct material requirements or to some other base.

Questions have arisen as to whether the accumulation of direct material costs in an undifferentiated account where a contractor estimates a significant part of such costs by means of percentage factors is in compliance with Part 401. The most serious questions pertain to such percentage factors which are not supported by the contractor with accounting, statistical, or other relevant data from past experience, nor by a program to accumulate actual costs for comparison with such percentage estimates. In the opinion of the Board, the accumulation of direct costs in an undifferentiated account in this circumstance is a cost accounting practice which is not consistent with the practice of estimating a significant part of costs by means of percentage factors. This situation is virtually identical with that described in Illustration 401.60(b)(5), which deals with labor.

Part 401 does not, however, prescribe the amount of detail required in accumulating and reporting costs. The Board recognizes that the amount of detail required may vary considerably depending on the percentage factors used, the data presented in justification or lack thereof, and the significance of each situation. Accordingly, the Board is of the view that it is neither appropriate nor practical for the Board to prescribe a single set of accounting practices which would be consistent in all situations with the practices of estimating direct material costs by percentage factors. The Board considers, therefore, that the amount of accounting and statistical detail to be required and maintained in accounting for this portion of direct material costs has been and continues to be a matter to be decided by Government procurement authorities on the basis of the individual facts and circumstances. (41 FR 52427, Nov. 30, 1976)

[39 FR 43058, Dec. 10, 1974, as amended at 46 FR 61855, Dec. 21, 1981]

[blocks in formation]

Sec.

402.60 Illustrations. 402.70 Exemptions. 402.80 Effective date.

APPENDIX-INTERPRETATION NO. 1.

AUTHORITY: Sec. 103, 84 Stat. 796; 50 U.S.C. App. 2168.

SOURCE: 37 FR 4173, February 29, 1972 unless otherwise noted.

§ 402.10 General applicability.

General applicability of this cost accounting standard is established by § 331.30 of the Board's regulations on applicability, exemption, and waiver of the requirement to include the cost accounting standards contract clause in negotiated defense prime contracts and subcontracts (§ 331.30 of this chapter).

(43 FR 24819, June 8, 1978)

§ 402.20 Purpose.

The purpose of this standard is to require that each type of cost is allocated only once and on only one basis to any contract or other cost objective. The criteria for determining the allocation of costs to a product, contract, or other cost objective should be the same for all similar objectives. Adherence to these cost accounting concepts is necessary to guard against the overcharging of some cost objectives and to prevent double counting. Double counting occurs most commonly when cost items are allocated directly to a cost objective without eliminating like cost items from indirect cost pools which are allocated to that cost objective.

§ 402.30 Definitions.

(a) The following definitions of terms which are prominant in this standard are reprinted from Part 400 of this chapter for convenience. Other terms which are used in this standard and are defined in Part 400 of this chapter have the meanings ascribed to them in that part unless the text demands a different definition or the definition is modified in paragraph (b) of this section.

(1) Allocate. To assign an item of cost or a group of items of cost, to one or more cost objectives. This term includes both direct assignment of cost and the reassignment of a share from an indirect cost pool.

(2) Cost objective. A function, organizational subdivision, contract or other work unit for which cost data are desired and for which provision is made to accumulate and measure the cost to processes, products, jobs, capitalized projects, etc. (38 FR 30730, November 7, 1973)

(3) Direct Cost. Any cost which is identified specifically with a particular final cost objective. Direct costs are not limited to items which are incorporated in the end

product as material or labor. Costs identified specifically with a contract are direct costs of that contract. All costs identified specifically with other final cost objectives of the contractor are direct costs of those cost objectives.

(4) Final Cost Objective. A cost objective which has allocated to it both direct and indirect costs, and, in the contractor's accumulation system, is one of the final accumulation points.

(5) Indirect Cost. Any cost not directly identified with a single final cost objective, but identified with two or more final cost objectives or with at least one intermediate cost objective.

(6) Indirect cost pool. A grouping of incurred costs identified with two or more cost objectives but not identified specifically with any final cost objective (38 FR 30730, November 7, 1973).

(b) The following modifications of definitions set forth in Part 400 of this chapter are applicable to this standard:

None.

[37 FR 4173, February 29, 1972, as amended at 38 FR 30730, November 7, 1973]

§ 402.40 Fundamental requirement.

All costs incurred for the same purpose, in like circumstances, are either direct costs only or indirect costs only with respect to final cost objectives. No final cost objective shall have allocated to it as an indirect cost any cost, if other costs incurred for the same purpose, in like circumstances, have been included as a direct cost of that or any other final cost objective. Further, no final cost objective shall have allocated to it as a direct cost any cost, if other costs incurred for the same purpose, in like circumstances, have been included in any indirect cost pool to be allocated to that or any other final cost objective.

§ 402.50 Techniques for application

(a) The Fundamental Requirement is stated in terms of cost incurred and is equally applicable to estimates of costs to be incurred as used in contract proposals.

(b) The Disclosure Statement to be submitted by the contractor will require that he set forth his cost accounting practices with regard to the distinction between direct and indirect costs. In addition, for those types of cost which are sometimes accounted for as direct and sometimes accounted for as indirect, the contractor will set forth in his Disclosure Statement the specific criteria and circumstances for making such distinctions. In essence, the Disclosure Statement submitted by the contractor by distinguishing between direct and indirect costs, and by describing the criteria and circumstances for allocating those items which are sometimes direct and sometimes

indirect, will be determinative as to whether or not costs are incurred for the same purpose. Disclosure Statement as used herein refers to the statement required to be submitted by contractors as a condition of contracting as set forth in Part 351 of this chapter.

(c) In the event that a contractor has not submitted a Disclosure Statement the determination of whether specific costs are directly allocable to contracts shall be based upon the contractor's cost accounting practices used at the time of contract proposal.

(d) Whenever costs which serve the same purpose cannot equitably be indirectly allocated to one or more final cost objectives in accordance with the contractor's disclosed accounting practices, the contractor may either: (1) Use a method for reassigning all such costs which would provide an equitable distribution to all final cost objectives, or (2) directly assign all such costs to final cost objectives with which they are specifically identified. In the event the contractor decides to make a change for either purpose the Disclosure Statement shall be amended to reflect the revised accounting practices involved.

(e) Any direct cost of minor dollar amount may be treated as an indirect cost for reasons of practicality where the accounting treatment for such cost is consistently applied to all final cost objectives, provided that such treatment produces results which are substantially the same as the results which would have been obtained if such cost had been treated as a direct cost.

§ 402.60 Illustrations.

(a) Illustrations of costs which are incurred for the same purpose:

(1) Contractor normally allocates all travel as an indirect cost and previously disclosed this accounting practice to the Government. For purposes of a new proposal, contractor intends to allocate the travel costs of personnel whose time is accounted for as direct labor directly to the contract. Since travel costs of personnel whose time is accounted for as direct labor working on other contracts are costs which are incurred for the same purpose, these costs may no longer be included within indirect cost pools for purposes of allocation to any covered Government contract. Contractor's Disclosure Statement must be amended for the proposed changes in accounting practices.

(2) Contractor normally allocates planning costs indirectly and allocates this cost to all contracts on the basis of direct labor. A proposal for a new contract requires a disproportionate amount of planning costs. The contractor prefers to continue to allocate planning costs indirectly. In order to equitably allocate the total planning costs, the contractor may use a method for allo

« PreviousContinue »