M U.S. Congress. Senate HEARINGS BEFORE THE COMMITTEE ON INTERIOR AND INSULAR AFFAIRS UNITED STATES SENATE EIGHTY-FIRST CONGRESS FIRST AND SECOND SESSIONS ON H. R. 5472 AN ACT AUTHORIZING THE CONSTRUCTION, REPAIR, OCTOBER 10, 1949, FEBRUARY 6, 7, 8, 9, 14, 15, Printed for the use of the 99772 UNITED STATES WASHINGTON: 1950 HBP 14 NOV CONTENTS 81 Statement of Billingsley, Kirby, Washington State Columbia Basin commissioner__ Dixon, J. W., resumed_. Dixon, J. W., accompanied by Earl D. Ostrander, resumed__. Page 31 163 397, 431, 458 259 Dixon, J. W., Director of Project Planning, Bureau of Reclamation, 134 403 257 Dixon, J. W., Director of Project Planning, Bureau of Reclamation__ 10, 111 Magnuson, Warren G., United States Senator, State of Washington____ Ostrander, Earl D., controller, Bonneville Power Administration, re- Ostrander, Earl D., Controller, Bonneville Power Administration_ Rising, E. W., vice president, Southwestern Idaho Water Conservation Sanborn, John, United States Representative, State of Idaho_. Smylie, Robert E., attorney general of Idaho__. Stinson, Howard R., regional counsel, Bureau of Reclamation, Boise, Torbert, E. N., regional planning engineer, Bureau of Reclamation-- 48, 113 Agreement, April 11, 1949, Corps of Engineers and Bureau of Reclama- Amendments to H. R. 5472, proposed by Interior Department. Authority to permit pooling of costs re Bonneville and Grand Coulee___ Bailie, Leon L., president, Washington State Reclamation Association, 256 |