(c) State project priority list. The State shall prepare and submit annually a ranked priority listing of projects for which Federal assistance is expected during the 5-year planning period starting at the beginning of the next fiscal year. The list's fundable portion shall include those projects planned for award during the first year of the 5year period (hereinafter called the funding year). The fundable portion shall not exceed the total funds expected to be available during the year less all applicable reserves provided in § 35.915-1 (a) through (d). The list's planning portion shall include all projects outside the fundable portion that may, under anticipated allotment levels, receive funding during the 5year period. The Administrator shall provide annual guidance to the States outlining the funding assumptions and other criteria useful in developing the 5-year priority list.

(1) Project priority list development. The development of the project priority list shall be consistent with the rating criteria established in the approved priority system, in accordance with the criteria in paragraph (a)(1) of this section. In ranking projects, States must also consider the treatment works and step sequence; the allotment deadline; total funds available; and other management criteria in the approved State priority system. In developing its annual priority list, the State must consider the construction grant needs and priorities set forth in certified and approved State and areawide WQM plans. The Regional Administrator may request that a State provide justification for the rating or ranking project(s).

established for specific

(2) Project priority list information. The project priority list shall include the information for each project that is set out below for projects on the fundable portion of the list. The Administrator shall issue specific guidance on these information requirements for the planning portion of the list, including phase-in procedures for the fiscal year 1979 priority planning process.

(i) State assigned EPA project number;

(ii) Legal name and address of applicant;

(iii) Short project name or description;

(iv) Priority rating and rank of each project, based on the approved priority system;

(v) Project step number (step 1, 2, 3, or 2+3);

(vi) Relevant needs authority/facility number(s);

(vii) NPDES number (as appropriate); (viii) Parent project number (i.e., EPA project number for predecessor project);

(ix) For step 2, 3, or 2+3 projects, indication of alternative system for small community;

(x) For step 2, 3, or 2+3 projects, that portion (if any) of eligible cost to apply to alternative techniques;

(xi) For step 2, 3, or 2+3 projects, that portion (if any) of eligible cost to apply to innovative processes;

(xii) For step 3 or 2+3 projects, the eligible costs in categories IIIB, IV, and V (see § 35.915(a)(1)(ii));

(xiii) Total eligible cost;

(xiv) Date project is expected to be certified by State to EPA for funding;

(xv) Estimated EPA assistance (not including potential grant increase from the reserve in §35.915-1(b)); and

(xvi) Indication that the project does or does not satisfy the enforceable requirements provision, including (as appropriate) funding estimates for those portions which do not meet the enforceable requirements of the Act.

(d) Public participation. Before the State submits its annual project priority list to the Regional Administrator, the State shall insure that adequate public participation (including a public hearing) has taken place as required by subpart G of this part. Before the public hearing, the State shall circulate information about the priority list including a description of each proposed project and a statement concerning whether or not it is necessary to meet the enforceable requirements of the Act. The information on the proposed priority list under paragraph (c)(2) of this section may be used to fulfill these requirements. This public hearing may be conducted jointly with any regular public meeting of the State agency. The public must receive adequate and timely statewide notice of the meeting (including publication of the proposed

priority list) and attendees at the meeting must receive adequate opportunity to express their views concerning the list. Any revision of the State priority list (including project bypass and the deletion or addition of projects) requires circulation for public comment and a public hearing unless the State agency and the Regional Administrator determine that the revision is not significant. The approved State priority system shall describe the public participation policy and procedures applicable to any proposed revision to the priority list.

(e) Submission and review of project priority list. The State shall submit the priority list as part of the annual State program plan under subpart G of this part. A summary of State agency response to public comment and hearing testimony shall be prepared and submitted with the priority list. The Regional Administrator will not consider a priority list to be final until the public participation requirements are met and all information required for each project has been received. The Regional Administrator will review the final priority list within 30 days to insure compliance with the approved State priority system. No project may be funded until this review is complete.

(f) Revision of the project priority list. The State may modify the project priority list at any time during the program planning cycle in accordance with the public participation requirements and the procedures established in the approved State priority system. Any modification (other than clerical) to the priority list must be clearly documented and promptly reported to the Regional Administrator. As a minimum, each State's priority list management procedure must provide for the following conditions:

(1) Project bypass. A State may bypass a project on the fundable portion of the list after it gives written notice to the municipality and the NPDES authority that the State has determined that the project to be bypassed will not be ready to proceed during the funding year. Bypassed projects shall retain their relative priority rating for consideration in the future year allotments. The highest ranked projects on the planning portion of the list will replace by

passed projects. Projects considered for funding in accordance with this provision must comply with paragraph (g) of this section.

(2) Additional allotments. If a State receives any additional allotment(s), it may fund projects on the planning portion of the priority list without further public participation if:

(i) The projects on the planning portion have met all administrative and public participation requirements outlined in the approved State priority system; and

(ii) The projects included within the fundable range are the highest priority projects on the planning portion.

If sufficient projects that meet these conditions are not available on the planning portion of the list, the State shall follow the procedures outlined in paragraph (e) of this section to add projects to the fundable portion of the priority list.

(3) Project removal. A State may remove a project from the priority list only if:

(i) The project has been fully funded; (ii) The project is no longer entitled to funding under the approved priority system;

(iii) The Regional Administrator has determined that the project is not needed to comply with the enforceable requirements of the Act; or

(iv) The project is otherwise ineligible.

(g) Regional Administrator review for compliance with the enforceable requirements of the Act. (1) Unless otherwise provided in paragraph (g)(2) of this section, the Regional Administrator may propose the removal of a specific project or portion thereof from the State project priority list during or after the initial review where there is reason to believe that it will not result in compliance with the enforceable requirements of the Act. Before making a final determination, the Regional Administrator will initiate a public hearing on this issue. Questioned projects shall not be funded during this administrative process. Consideration of grant award will continue for those projects not at issue in accordance with all other requirements of this section.

(1) The Regional Administrator shall establish the procedures for the public notice and conduct of any such hearing, or, as appropriate, the procedures may be adapted from existing agency procedures such as §6.400 or §§ 123.32 and 123.34 of this chapter. The procedures used must conform to minimum Agency guidelines for public hearings under part 25 of this chapter.

(ii) Within 30 days after the date of the hearing, the Regional Administrator shall transmit to the appropriate State agency a written determination about the questioned

projects. If the Regional Administrator determines that the project will not result in compliance with the enforceable requirements of the Act, the State shall remove the project from the priority list and modify the priority list to reflect this action. The Regional Administrator's determination will constitute the final agency action, unless the State or municipality files a notice of appeal under part 30, subpart J of this subchapter.

(2) The State may use 25 percent of its funds during each fiscal year for projects or portions of projects in categories IIIB, IVA, IVB, and V (see § 35.915(a)(1)(ii)). These projects must be eligible for Federal funding to be included on the priority list. EPA will generally not review these projects under paragraph (g)(1) of this section to determine if they will result in compliance with the enforceable requirements of the Act. The Regional Administrator will, however, review all projects or portions thereof which would use funds beyond the 25-percent level according to the criteria in paragraph (g)(1) of this section.

(h) Regional Administrator review for eligibility. If the Regional Administrator determines that a project on the priority list is not eligible for assistance under this subpart, the State and municipality will be promptly advised and the State will be required to modify its priority list accordingly. Elimination of any project from the priority list shall be final and conclusive unless the State or municipality files a notice

of appeal under part 30, subpart J of this subchapter.

[43 FR 44049, Sept. 27, 1978, as amended at 44 FR 37595, June 27, 1979; 44 FR 39339, July 5, 1979]

§35.915-1 Reserves related to the project priority list.

In developing the fundable portion of the priority list, the State shall provide for the establishment of the several reserves required or allowed under this section. The State shall submit a statement specifying the amount to be set aside for each reserve with the final project priority list.

(a) Reserve for State management assistance grants. The State may (but need not) propose that the Regional Administrator set aside from each allotment a reserve not to exceed 2 percent or $400,000, whichever is greater, for State management assistance grants under subpart F of this part. Grants may be made from these funds to cover the reasonable costs of administering activities delegated to a State. Funds reserved for this purpose that are not obligated by the end of the allotment period will be added to the amounts last allotted to a State. These funds shall be immediately available for obligation to projects in the same manner and to the same extent as the last allotment.

(b) Reserve for innovative and alternative technology project grant increase. Each State shall set aside from its annual allotment a specific percentage to increase the Federal share of grant awards from 75 percent to 85 percent of the eligible cost of construction (under §35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment processes and techniques. The set-aside amount shall be 2 percent of the State's allotment for each of fiscal years 1979 and 1980, and 3 percent for fiscal year 1981. Of this amount not less than one-half of 1 percent of the State's allotment shall be set aside to increase the Federal grant share for projects utilizing innovative processes and techniques. Funds reserved under this section may be expended on projects for which facilities plans were initiated before fiscal year 1979. These funds shall be reallotted if

not used for this purpose during the allotment period.

(c) Reserve for grant increases. The State shall set aside not less than 5 percent of the total funds available during the priority list year for grant increases (including any funds necessary for development of municipal pretreatment programs) for projects awarded assistance under §35.935-11. The funds reserved for this purpose shall be reallotted if not obligated. Therefore, if they are not needed for grant increases they should be released for funding additional projects before the reallotment deadline.

(d) Reserve for step 1 and step 2 projects. The State may (but need not) set aside up to 10 percent of the total funds available in order to provide grant assistance to step 1 and step 2 projects that may be selected for funding after the final submission of the project priority list. The funds reserved for this purpose shall be reallotted if not obligated. Therefore, they should be released for funding additional projects before the reallotment deadline.

(e) Reserve for alternative systems for small communities. Each State with a rural population of 25 percent or more (as determined by population estimates of the Bureau of Census) shall set aside an amount equal to 4 percent of the State's annual allotment, beginning with the fiscal year 1979 allotment. The set-aside amount shall be used for funding alternatives to conventional treatment works for small communities. The Regional Administrator may authorize, at the request of the Governor of any non-rural State, a reserve of up to 4 percent of that State's allotment for alternatives to conventional treatment works for small communities. For the purposes of this paragraph, the definition of a small community is any municipality with a population of 3,500 or less, or highly dispersed sections of larger municipalities, as determined by the Regional Administrator. In States where the reserve is mandatory, these funds shall be reallotted if not obligated during the allotment period. In States where the reserve is optional, these funds should be released for funding projects before the reallotment deadline.

§ 35.917 Facilities planning (step 1).

(a) Sections 35.917 through 35.917-9 establish the requirements for facilities plans.

(b) Facilities planning consists of those necessary plans and studies which directly relate to the construction of treatment works necessary to comply with sections 301 and 302 of the Act. Facilities planning will demonstrate the need for the proposed facilities. Through a systematic evaluation of feasible alternatives, it will also demonstrate that the selected alternative is cost-effective, i.e., is the most economical means of meeting established effluent and water quality goals while recognizing environmental and social considerations. (See appendix A to this subpart.)

(c) EPA requires full compliance with the facilities planning provisions of this subpart before award of step 2 or step 3 grant assistance. (Facilities planning initiated before May 1, 1974, may be accepted under regulations published on February 11, 1974, if the step 2 or step 3 grant assistance is awarded before April 1, 1980.)

(d) Grant assistance for step 2 or step 3 may be awarded before approval of a facilities plan for the entire geographic area to be served by the complete waste treatment system of which the proposed treatment works will be an integral part if:

(1) The Regional Administrator determines that applicable statutory requirements have been met (see §§ 35.925– 7 and 35.925-8); that the facilities planning related to the proposed step 2 or step 3 project has been substantially completed; and that the step 2 or step 3 project for which grant assistance is made will not be significantly affected by the completion of the facilities plan and will be a component part of the complete system; and

(2) The applicant agrees to complete the facilities plan on a schedule the State accepts (subject to the Regional Administrator's approval); the schedule shall be inserted as a special condition in the grant agreement.

(e) Facilities planning may not be initiated before award of a step 1 grant or written approval of a plan of study (see § 35.920-3(a)(1)) accompanied by reservation of funds for a step 1 grant (see

§§ 35.925-18 and 35.905). Facility planning must be based on load allocations, delineation of facility planning areas and population projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3) of appendix A.) After October 1, 1979, the Regional Administrator shall not approve grant assistance for any project under this subpart if such facility-related information is not available in an approved WQM plan, unless the Regional Administrator determines, in writing, based on information submitted by the State or the grantee, that the facility-related information was not within the scope of the WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act.

(f) If the information required as part of a facilities plan has been developed separately, the facilities plan should incorporate it by reference. Planning which has been previously or collaterally accomplished under local, State, or Federal programs will be utilized (not duplicated).

§ 35.917-1 Content of facilities plan.

Facilities planning must address each of the following to the extent considered appropriate by the Regional Administrator:

(a) A description of the treatment works for which construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for completion of design and construction. The preliminary engineering data may include, to the extent appropriate, information such as a schematic flow diagram, unit processes, design data regarding detention times, flow rates, sizing of units, etc.

(b) A description of the selected complete waste treatment system(s) of which the proposed treatment works is a part. The description shall cover all elements of the system, from the service area and collection sewers, through treatment, to the ultimate discharge of treated waste waters and management and disposal of sludge. Planning area maps must include major components of existing and proposed treatment

works. For individual systems, planning area maps must include those individual systems which are proposed for funding under § 35.918.

(c) Infiltration/inflow documentation in accordance with §35.927 et seq.

(d) A cost-effectiveness analysis of alternatives for the treatment works and for the complete waste treatment system(s) of which the treatment works is a part. The selection of the system(s) and the choice of the treatment works for which construction drawings and specifications are to be prepared shall be based on the results of the cost-effectiveness analysis. (See appendix A to this subpart.) This analysis shall include:

(1) The relationship of the size and capacity of alternative works to the needs to be served, including reserve capacity;

(2) An evaluation of alternative flow and waste reduction measures, including nonstructural methods;

(3) An evaluation of improved effluent quality attainable by upgrading the operation and maintenance and efficiency of existing facilities as an alternative or supplement to construction of new facilities;

(4) An evaluation of the capability of each alternative to meet applicable effluent limitations. (All step 2, step 3, or step 2+3 projects shall be based on application of best practicable waste treatment technology (BPWTT), as a minimum. Where application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining such standards. Such provision shall consider the alternative of treating combined sewer overflows.);

(5) An identification of, and provision for, applying BPWTT as defined by the Administrator, based on an evaluation of technologies included under each of the following waste treatment management techniques:

(i) Biological or physical-chemical treatment and discharge to receiving waters;

(ii) Systems employing the reuse of waste water and recycling of pollutants;

(iii) Land application techniques; (iv) Systems including revenue generating applications; and