(b) An application described in paragraph (1) of §21.3(c) may be submitted directly to the appropriate State, where a State has assumed responsibility for issuing the statement. Information on whether EPA has retained responsibility for certification or whether it has been assumed by the State may be obtained from either the appropriate Regional Administrator or the State Water Pollution Control Authority in which the facility is located.

(c) An application need be in no particular form, but it must be in writing and must include the following:

(1) Name of applicant (including business name, if different) and mailing address. Address of the affected facility or operation, if different, should also be included.

(2) Signature of the owner, partner, or principal executive officer requesting the statement.

(3) The Standard Industrial Classification number for the business for which an application is being submitted. Such SIC number shall be obtained from the Standard Industrial Classification Manual, 1972 edition. If the applicant does not know the SIC for the business, a brief description of the type of business activity being conducted should be provided.

(4) A description of the process or activity generating the pollution to be abated by the additions, alterations, or methods of operation covered by the application, accompanied by a schematic diagram of the major equipment and process, where practicable.

(5) A specific description of the additions, alterations, or methods of operation covered by the application. Where appropriate, such description will include a summary of the facility

construction to be undertaken; a listing of the major equipment to be purchased or utilized in the operation of the facility; the purchase of any land or easements necessary to the operation of the facility; and any other items that the applicant deems pertinent. Any information that the applicant considers to be a trade secret shall be identified as such.

(6) A declaration of the requirement, or requirements, for compliance with which the alterations, additions, or methods of operation are claimed to be necessary and adequate.

(i) If the requirement results from a permit issued by EPA or a State under section 402 of the Act, the permit number shall be included.

(ii) If the requirement results from a permit issued by EPA or a State for a publicly-owned treatment works, the municipal permit number shall be included along with a written declaration from the authorized agent for the publicly owned treatment works that received the permit detailing the specific pretreatment requirements being placed upon the applicant.

(iii) If the requirement initiates from a plan to include the applicant's effluent in an existing municipal sewer system through the construction of lateral or interceptor sewers, a written declaration from the authorized agent for the publicly owned treatment works shall be included noting that the sewer construction is consistent with the integrity of the system; will not result in the capacity of the publicly owned treatment works being exceeded; and where applicable, is consistent with a facilities plan developed under section 201 of the Act (see 35 CFR part 917).

(iv) If the requirement results from a State order, regulation, or other enforceable authority controlling pollution from a vessel as provided by section 312(f)(3) of the Act, a written declaration from the authorized agent of the State specifying the control measures being required of the applicant shall be included.

(v) If the requirement is a result of a permit issued by the Corps of Engineers related to permits for dredged or fill material as provided by section 404

of the Act, a copy of the permit as issued shall be included.

(vi) If the requirement results from a standard of performance for control of sewage from vessels as promulgated by the Coast Guard under section 312(b) of the Act, the vessel registration number or documentation number shall be included.

(vii) If the requirement results from a plan to control or prevent the discharge or spill of pollutants as identified in section 311 of the Act, the title and date of that plan shall be included.

(viii) If the requirement is the result of an order by a State or an areawide management agency controlling the disposal of aqueous pollutants so as to protect groundwater, a copy of the order as issued shall be included.

(7) Additionally, if the applicant has received from a State Water Pollution Control Agency a permit issued by the State within the preceding two years, and if such permit was not issued under the authorities of section 402 of the Act, and where the permit directly relates to abatement of the discharge for which a statement is sought, a copy of that permit shall also be included.

Comment: Some States under State permit programs, separate and distinct from the NPDES permit program under the Act, conduct an engineering review of the facilities or equipment that would be used to control pollution. The results of such a review would be materially helpful in determining the necessity and adequacy of any alterations or additions.

(8) Any written information from a manufacturer, supplier, or consulting engineer, or similar independent source, concerning the design capabilities of the additions or alterations covered by the application, including any warranty limitations or certifications obtained from or provided by such sources which would bear upon these design or performance capabilities. The Regional Administrator may waive the requirement for this paragraph if it appears that there is no independent source for the information described herein; as, for example, when the applicant has designed and constructed the additions or alterations with in-house capability.

(9) An estimated schedule for the construction or implementation of the

alterations, additions, or methods of operation.

(10) An estimated cost of the alterations, additions, or methods of operation, and where practicable, the individual costs of major elements of the construction to be undertaken.

(11) Information on previously received loan assistance under this section for the facility or method of operation, including a description and dates of the activity funded.

(d) A separate application must be submitted for every addition, alteration, or method of operation that is at a separate geographical location from the initial application.

Comment: As an example, a chain has four dry cleaning establishments scattered through a community. A separate application would have to be filed for each.

(e) No statement shall be approved for any application that has not included the information or declaration requirements imposed by paragraph (c)(6) of § 21.3.

(f) All applications are to be submitted in duplicate.

(g) All applications are subject to the provisions of 18 U.S.C. 1001 regarding prosecution for the making of false statements or the concealing of material facts.

(h) Instructional guidelines to assist in the submission of applications for EPA certification are available from EPA or a certifying State.

[42 FR 8083, Feb. 8, 1977, as amended at 62 FR 1833, Jan. 14, 1997]

§ 21.4 Review of application.

(a) The Regional Administrator or his designee will conduct a review of the application. This review will consist of a general assessment of the adequacy of the proposed alterations, additions, or methods of operation. The review will corroborate that the proposed alterations, additions, or methods of operation are required by an applicable standard. The review will identify any proposed alterations, additions, methods of operation that are not required by an applicable standard, or that are extraneous to the achievement of an applicable standard.

or

(b) The assessment of adequacy will be conducted to ensure that the pro

posed additions, alterations, or methods of operation are sufficient to meet one or more applicable standards whether alone or in conjunction with other plans. The assessment will not generally examine whether other alternatives exist or would be more meritorious from a cost-effective, efficiency, or technological standpoint.

(c) An application which proposes additions, alterations, or methods of operation whose design, in anticipation of a future requirement, will achieve a level of performance above the requirements imposed by a presently applicable standard shall be reviewed and approved by EPA or a State without prejudice. The amount of financial assistance for such an application will be determined by SBA.

(d) The Regional Administrator shall retain one copy of the application and a summary of the action taken on it. Upon completion of his review, the Regional Administrator shall return the original application along with any other supporting documents or information provided to the applicant along with a copy to the appropriate SBA district office for processing.

§ 21.5 Issuance of statements.

(a) Upon application by a small business concern pursuant to §21.3 the Regional Administrator will, if he finds that the additions, alterations, or methods of operation covered by the application are adequate and necessary to comply with an applicable standard, issue a written statement to the applicant to that effect, within 45 working days following receipt of the application, or within 45 working days following receipt of all information required to be submitted pursuant to §21.3(c), whichever is later. Such a written statement shall be classified as a full approval. If an application is deficient in any respect, with regard to the specifications for submission listed in §21.3(c), the Regional Administrator shall promptly, but in no event later than 30 working days following receipt of the application, notify the applicant of such deficiency.

(b)(1) If an application contains proposed alterations, additions, or methods of operation that are adequate and necessary to comply with an applicable

179-141 0-98——8

standard but also contains proposed alterations, additions, or methods of operation that are not necessary to comply with an applicable standard, the Regional Administrator shall conditionally approve the application within the time limit specified in paragraph (a) of this section, and shall also identify in the approval those alterations, additions, or methods of operation that he determines are not necessary.

(2) Conditional approvals as contained in a statement will satisfy the requirements for approval by EPA for those alterations, additions, or methods of operation determined to be necessary and adequate. Such conditional approvals may be submitted to SBA in satisfaction of the requirements of section 7(g)(2)(B) of the Small Business Act.

(3) Conditional approvals will not satisfy the requirements for approval by EPA for those alterations, additions, or methods of operation included in the application that are determined not to be necessary. Unnecessary alterations, additions, or methods of operation are those which are extraneous to the achievement of an applicable standard.

(4) Conditional approvals may be appealed to the Deputy Administrator by an applicant in accordance with the procedures identified in §21.8.

(c) If the Regional Administrator determines that the additions, alterations, or methods of operation covered by an application are not necessary and adequate to comply with an applicable standard, he shall disapprove the application and shall so advise the applicant of such determination within the time limit specified in paragraph (a) of this section, and shall state in writing the reasons for his determination.

(d) Any application shall be disapproved if the Regional Administrator determines that the proposed addition, alteration, or method of operation would result in the violation of any other requirement of this Act, or of any other Federal or State law or regulation with respect to the protection of the environment.

(e) An applicant need not demonstrate that its facility or method of operation will meet all applicable re

quirements established under the Act. The applicant need only demonstrate that the additions, alterations, or methods of operation will assist in ensuring compliance with one or more of the applicable standards for which financial assistance is being requested.

Comment: As an example, a small business has two discharge pipes-one for process water, the other for cooling water. The application for loan assistance is to control pollution from the process water discharge. However, EPA or a State may review the applicant's situation and identify for SBA that the applicant is subject to other requirements for which the applicant has not sought assistance.

(f) An application should not include major alternative designs significantly differing in scope, concept, or capability. It is expected that the applicant at the time of submission will have selected the most appropriate or suitable design for the addition, alteration, or method of operation.

(g) EPA will not provide assistance in the form of engineering, design, planning or other technical services to any applicant in the preparation of his application.

(h) An applicant may be issued a certification for additions, alterations, or methods of operation constructed or undertaken before loan assistance was applied for by the applicant. Any such applications would be reviewed by SBA for eligibility under SBA criteria, including refinancing and loan exposure.

§ 21.6 Exclusions.

(a) Statements shall not be issued for applications in the following areas:

(1) Local requirements. Applications for statements for additions, alterations, or methods of operation that result from requirements imposed by municipalities, counties or other forms of local or regional authorities and governments, except for areawide management agencies designated and approved under section 208 of the Act, shall not be approved; except for those requirements resulting from the application of pretreatment requirements under section 307(b) of the Act; or those resulting from an approved project for facilities plans, and developed under section 201 of the Act. (See 35 CFR,

subpart E); or under a delegation of authority under the Act.

(2) Cost recovery and user charges. Applications for statements involving a request for financial assistance in meeting revenue and service charges imposed upon a small business by a municipality conforming to regulations governing a user charge or capital cost system under section 204(b)(2) of the Act (see 35 CFR 925-11 and 925–12) shall not be approved.

(3) New facility sewer construction. Applications for statements involving projects that involve the construction of a lateral, collection, or interceptor sewer, at a facility that was not in existence on October 18, 1972, shall not be approved. Applications for additions, alterations, or methods of operation for new facilities that do not involve sewer construction are not affected by this preclusion. Further, if an applicant is compelled to move as a result of a relocation requirement but operated at the facility prior to October 18, 1972, the cost of construction for a lateral, collection, or interceptor sewer can be approved for the new, relocated site. For the purpose of this exclusion lateral, collection, or interceptor sewer is determined as any sewer transporting waste from a facility or site to any publicly owned sewer.

(4) Other non-water related pollution abatement additions, alterations, or methods of operation which are not integral to meeting the requirements of the Act, although they may be achieving the requirements of another Federal or State law or regulation.

Comment: An example would be where stack emission controls were required on equipment that operated the water pollution control facility. This emission control equipment as an integral part of the water pollution control systems would be approvable. However, emission control equipment for a general purpose incinerator that only incidentally burned sewage sludge would not be approvable. The general purpose incinerator might also receive loan assistance but under separate procedures than those set out for water pollution control.

(5) Privately owned treatment facility service or user costs. Applications for statements involving financial assistance in meeting user cost or fee schedules related to participating in a privately owned treatment facility not

under the ownership or control of the applicant shall not be approved.

(6) Operation and maintenance charges. Applications for statements containing a request for financial assistance in meeting the operations and maintenance costs of operating the applicant's additions, alterations, or methods of operation shall not be approved for any elements relating to such areas of cost.

(7) Evidence of financial responsibility. Applications for statements containing a request for financial assistance in meeting any requirements relating to evidence of financial responsibility as provided in section 311(p) of the Act shall not be approved.

§ 21.7 [Reserved]

Comment: Applications for a statement resulting from a requirement to control pollution from non-point sources as identified in section 304(e)(2)(A-F) of the Act and described in §21.2(m) will not presently be issued a statement under §21.5 unless the requirement is established through a permit under section 402. There is no requirement under the current Act that the Federal Government control pollution from such sources, and the nature and scope of State or areawide management agency proposals or programs to control such sources cannot be determined at this time. As State and areawide plans for control of nonpoint sources being prepared under section 208 of the Act, will not be completed for several years, this section is being reserved pending a future determination on the eligibility of applications relating to non-profit sources to receive a statement under this part.

§ 21.8 Resubmission of application.

(a) A small business concern whose application is disapproved may submit an amended or corrected application to the Regional Administrator at any time. The applicant shall provide the date of any previous application. (b) [Reserved]

§ 21.9 Appeals.

(a) An applicant aggrieved by a determination of a Regional Administrator under §21.5 may appeal in writing to the Deputy Administrator of the Environmental Protection Agency, within 30 days of the date of the determination from which an appeal is taken;