Page images
PDF
EPUB

issuance of the management permit collectively constitute the basis for intensive management. The allotment management plan spells out the details of the program.

Allotment management plan objectives spell out the reasons for the management program and the goals to be achieved. Objectives provide a reference point from which to measure progress.

Each grazing system is designed to achieve the objectives established, and it is based on the physiological requirements of selected plants within the allotment. Principles of rest and rotation grazing are used to increase plant vigor and composition. Each allotment management plan allows the cooperator specific limits of flexibility in his operation on the public lands. Flexibility includes discretionary latitude in the number of animals grazed, and may allow for changes in grazing dates. Any modifications above or below the specified limits require application and prior approval, using normal administrative procedures. At the time that an allotment management plan is initiated, range studies are conducted on the allotment to provide a reference point from which to record conditions. Periodic readings of actual use, utilization, trend, and climate are made thereafter to measure the progress in reaching land management goals.

Upon development of an allotment management plan it is signed by the user and the authorized officer to indicate concurrence. A copy of the AMP is provided the operator, and a copy is made a part of the official district records. The AMP is attached to and made a part of a management permit when the plan is implemented. Plans may be modified in whole or in part to meet changed conditions or requirements. Upon transfer of a preference, the transferee is subject to the provisions of the AMP.

When the parties to a proposed allotment management plan cannot agree on the plan, or they do not wish to concur, a decision will be issued stipulating the grazing system requirements as a condition of a regular permit. The regular permit will specifically set out the number of livestock, and the periods of use and locations where the animals are to be grazed.

If a permittee does not comply with an AMP to which he has agreed, the plan may be cancelled and the grazing system made a condition of a regular permit.

Encl. 3-14

[blocks in formation]

The development of intensive management plans for the public lands, through the Bureau's resource planning system, is a primary goal. The overall objective is to implement an allotment management plan in each area grazed by domestic livestock except as provided in 4220.1(b) of the regulations.

[blocks in formation]

The proposal is a consolidation and simplification of existing rules. In addition, new provisions have been added concerning littering, the management of wild horses and burros, the placement of poisons, and unauthorized supplemental feeding on the public lands.

Rule against violation of Federal or State law relating to the protection of wildlife and the conservation of other natural resources is also proposed. This does not imply that BLM personnel will undertake the police or supervisory responsibilities of other governmental agencies. Violations have to be related to the grazing use authorized by the permit. The killing of eagles in violation of the Bald Eagle Protection Act is an example of an applicable prohibition under this proposed Subpart.

4550 Penalties

To initiate any proceedings, a written decision must be issued by the authorized officer which clearly outlines the specific violation and the necessary corrective steps required of the user and/or the proposed penalty action to be taken. The alternatives of action and judgments available to the authorized officer depend upon the nature and the severity of the violation. Such decision does not bar normal administrative procedures or appeals.

This part, in general, follows current regulation concepts regarding failure to pay fees due. The proposed rule is intended to obligate a transferee to pay all fees due from the permit acquired (for example,

Encl. 3-15

where a transfer has occurred before the end of the grazing season and bills are issued following grazing pursuant to 4340.1(f)). A major change is in procedure. Each permit sets forth the authorized use (the basic operation) for which the permittee will be sent a "notice of bill"--except when under a management permit. If no change in use is desired, the bill is paid prior to the beginning of grazing. The process would not involve an annual application. An application would be required only when a change in use different from that authorized in the permit is desired.

Consistent with present practice, to allow for latitude in livestock operations but to protect the public interest, the failure to make full use provision provides for the possible revocation of preference to the extent not used, Minor fluctuations below the basic operation level of a regular permit, or below the lower limit of flexibility under a management permit, are not construed as "failure to use." This Subpart is consistent with PLM's range management program needs in that proper livestock use and utilization are very often required in order to perform certain functions in attaining multiple use objectives under an AMP. In addition, available forage should be utilized to meet the Department's objective of maximizing the production of animal products from the public lands.

4560 Changes in Use

An Automatic Data Processing (ADP) system is to be used in the "billing" and the "prior to the season changes in use request" process associated with the new regulations. Interim administrative techniques may be needed until the ADP is fully implemented.

Permits set out the basic operation from which the grazing fee bills are made up (except for AMP's)--also see 4550 of the explanation.

Before the beginning of the grazing season (approximately 45 days), permittees will receive an ADP "notice of bill." If no change in use is contemplated the permittee simply submits his payment before his first authorized date of grazing. If a change is desired for that year only the permittee must submit a written request to the authorized officer at least 30 days in advance of the authorized grazing period for which a change is desired. For example, for a permit which reads 100 cattle May 1 to June 30 the request for modification must be submitted no later than April 1; for a permit which reads 100 cattle March 1 to March 31 and 100 cattle November 1 to November 30 the request for change must be submitted 30 days prior to either of the distinct authorized periods to be modified.

Encl. 3-16

Upon approval of a requested change, a revised "notice of bill" is issued for payment. Upon disapproval, the permittee is notified and the matter is submitted to the advisory board for protest hearing and recommendation. There is no $25 service charge for this "first time" opportunity to change the use to be authorized for the coming year.

When under an AMP, an application for change outside the specified
limits of flexibility is made to the authorized officer in writing,
and such must be made within 30 days of an authorized grazing period.
After the grazing season or grazing year has begun, any permittee desir-
ing a change from his authorized use must submit a request in writing.
Approval for change is discretionary with the authorized officer and
may be approved upon satisfactory showing of need. Any approved change
which requires the issuance of a revised or new billing is subject to
the service charge pursuant to 4340.1(h).

In those regions where year-round public land grazing is practiced, the year will be divided administratively in half. This is to provide the opportunity for a twice-a-year adjustment in authorized numbers without a $25 service charge.

Any livestock forage which becomes available due to a requested change from the use designated on the permit may be allocated at the discretion of the authorized officer to any qualified person by nonrenewable permit for the period during which the change was requested by the original permittee.

4570 Closures to Livestock

In unusual circumstances, such as range drought or wildfire, it may be necessary to temporarily close a grazing area to use by livestock to protect the resource. Widespread notice of a closure will be made to provide a reasonable time period for animal removal. Such closures are interim in nature and have no effect on the grazing preference of the

users.

53-644 - 75 10

Encl. 3-17

4580 Range Improvements

BLM's resource planning system will identify the role of the resource use activities for a specific area and it will define the various use conflicts and constraints for such activities. The planning data will also portray the specific projects or the type of facilities, structures or land treatments, if any, to be considered or developed. As a matter of policy, private investment is allowable but will be predicated on the planning dictates for the area.

The construction of livestock management facilities, and in certain cases land treatment, that has been identified in the planning process will be authorized where there is a desire by the users to expend their own funds to further management efforts. Such improvement standards and specifications must be consistent with national environmental policy and completed BLM land use plans where they exist. Improvements authorized must meet the same environmental and engineering standards as those constructed solely by BLM.

Cooperative agreements which place title in the U.S. will normally be utilized. Work authorized under cooperative agreement may provide for all costs to be paid by the users or may provide for a predetermined cost-share arrangement between the users and BLM.

Section 4 and 15 permits which place title in the permittee may be used in those circumstances where there are no Federal funds available and the applicant is willing to provide total funding and he agrees to stipulations of the permit which will assure that multiple-use benefits will be realized.

It is preferred that all planning for an area be completed before approval is given on a request to construct management or development facilities. However, there will be situations where the resource planning has not yet been done. Cooperative agreements or permits may be issued after an environmental analysis through the normal annual work plan process. Where planning has not been completed, special stipulations, along with all of the necessary environmental and engineering requirements, will be made a part of the authorization. These special stipulations will provide for modification or removal of the improvement if incompatible with the land use plan adopted for the area. In livestock water base areas, facilities necessary for the proper development and use of the base property on public land such as windmills, wells, pumps, storage tanks, and reservoirs may be authorized by permit which vests title with the private individual. In water base arcas, the existence of a valid authorization for a water development constitutes control of water property for purposes of meeting qualification requirements.

Encl. 3-18

« PreviousContinue »