SOIL CONSERVATION SERVICE The estimates include proposed changes in the language of this item as follows (new language underscored; deleted matter enclosed in brackets). Conservation Operations 1 2 3 4 5 For necessary expenses for carrying out the provisions of the Act of The first change in language would eliminate language providing for earmarking of specific amounts for Snow Survey and Water Forecasting and for Operation of Plant Materials Centers. This language was added by the Congress to the 1981 Appropriation Act to ensure that it be consulted prior to the Department taking any action to reduce or phaseout these programs. The 1982 Budget Estimate proposes no phaseout of these programs and provides funding for continuation at the 1981 level. The continued inclusion of this earmarking in the language itself would restrict the management flexibility of the agency to respond to changing needs such as unforeseen emergencies or delays in contracting and other situations where it might be advisable to temporarily reprogram funds from these to other activities after consultation with the Congress. The remaining changes in language would increase the limitations on funds that may be used to replace, purchase, or improve SCS buildings. The construction cost limitations on buildings should be increased in fiscal year 1982 to maintain the previous values of these authorizations which have not been increased since FY 1976. Escalation in construction costs over this period of time have made it increasingly difficult and sometimes impossible to make needed alterations and improvements or to replace outdated or unsafe structures. These construction costs will have increased by approximately 60% between 1976 and 1982. a/ Includes a total increase of $5,474,000 toward increased operating costs to Adjusted appropriation.. (274,670,000)(10,116) (314,188,000) (10,554) (+4,511,000) (318,699,000)(10,446) Reimbursable obligations 1. Technical assistance: (a) Planning. (b) Application. Total, technical asst 2. Inventory & monitoring 633 +1,010,000 23,995,000 664 304 200,000 8,700,000 4. Snow survey and |