Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects: FP-79 |
From inside the book
Results 1-5 of 100
Page 8
... percent of the contract price at the time of award . ( b ) A payment bond as follows : ( 1 ) When the contract price is not more than $ 1,000,000 , the penal amount shall be 50 percent of the contract price ; ( 2 ) When the contract ...
... percent of the contract price at the time of award . ( b ) A payment bond as follows : ( 1 ) When the contract price is not more than $ 1,000,000 , the penal amount shall be 50 percent of the contract price ; ( 2 ) When the contract ...
Page 9
... percent ( 50 % ) of the difference between the amount of such total actual decrease and any net increase in ascertainable collateral costs to the Government which must reasonably be incurred as a result of application of the cost ...
... percent ( 50 % ) of the difference between the amount of such total actual decrease and any net increase in ascertainable collateral costs to the Government which must reasonably be incurred as a result of application of the cost ...
Page 28
... percentage of error in excess of 0.5 percent . Platform scales shall be installed and maintained with the platform level and rigid bulkheads at each end . They shall be of sufficient length to permit simultaneous weighing of all axle ...
... percentage of error in excess of 0.5 percent . Platform scales shall be installed and maintained with the platform level and rigid bulkheads at each end . They shall be of sufficient length to permit simultaneous weighing of all axle ...
Page 29
... percentage . If no fixed percentage is stated in the special provisions , compensation will be the actual amount paid by the Contractor for these items . In addition he will receive an amount equal to 35 percent of the 29 109.08.
... percentage . If no fixed percentage is stated in the special provisions , compensation will be the actual amount paid by the Contractor for these items . In addition he will receive an amount equal to 35 percent of the 29 109.08.
Page 30
... percent of the compensation as determined and paid for by one of the methods herein . ( b ) Materials . For materials delivered to the work and accepted the Contractor will receive the actual cost of such materials including ...
... percent of the compensation as determined and paid for by one of the methods herein . ( b ) Materials . For materials delivered to the work and accepted the Contractor will receive the actual cost of such materials including ...
Contents
104 | |
105 | |
107 | |
121 | |
130 | |
150 | |
157 | |
159 | |
182 | |
184 | |
188 | |
192 | |
197 | |
199 | |
204 | |
207 | |
210 | |
212 | |
213 | |
216 | |
219 | |
225 | |
227 | |
231 | |
232 | |
235 | |
237 | |
239 | |
240 | |
259 | |
261 | |
263 | |
266 | |
268 | |
277 | |
280 | |
286 | |
287 | |
288 | |
291 | |
295 | |
302 | |
304 | |
305 | |
307 | |
312 | |
313 | |
314 | |
318 | |
322 | |
323 | |
324 | |
330 | |
337 | |
351 | |
353 | |
Other editions - View all
Common terms and phrases
accepted aggregate Aluminum applied approved areas asphalt ASTM backfill Basis of Payment batch bid schedule bituminous material bolts Class cleaned coat compacted completed concrete condition consist Construction Requirements contract price contract unit price Contracting Officer Contractor corrugated Cubic yard curb curing damage designated determined as provided diameter dimensions Emulsified Engineer equipment excavation expansion joints fabric falsework feet finished furnished gabion grade grout holes inch installed joints Linear foot masonry meet the requirements metal minimum mixing mixture mortar mulch operations paid paint panels pavement pay items listed Pay unit percent permitted piles pipe placed plans plant portland cement precast Precast concrete prestressed concrete prestressing price and payment protected quantity railing reasonably close conformity reinforcing steel removed requirements of AASHTO riprap rivets samples Section sheeting shown sieve special provisions specific gravity specified Square yard stone strength structural steel subgrade surface temperature thickness topsoil traffic unless otherwise width wire